Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.7 LAccepted-AOC 155 SHAMPURA COLONY BELA ROAD RUPNAGAR 140001 | RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | L-1 | Accepted-AOC Lowest bidder | |
| 2 | L-2₹14.7 L+₹77,483.52 (5.56%)Rejected-Finance SCO NO 14 TRANSPORT NAGAR REGD BATHINDA 151003 PUNJAB | BATHINDA | BATHINDA | PUNJAB | 151003 | L-2 | Rejected-Finance Highest bidder | |
| 3 | L-3₹1.6 Cr+₹1.4 Cr (1034.2%)Rejected-Finance 1 VISHVAS NAGAR GONIANA ROAD P O NFL BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | L-3 | Rejected-Finance Highest bidder | |
| 4 | Not Admitted-Fee A 45 NTPC VIDYUT NAGAR DADRI GB NAGAR 201008 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | - | Not Admitted-Fee EMD/Instrument is not valid |
Tender Value
Refer Docs
EMD Value
₹85,000
Closing Date
21 Oct 2022, 11:00 amClosed
DyCE Headquarters GGSSTP Roopnagar
DyCE Headquarters GGSSTP Roopnagar
Annual overhauling of Boiler and its auxiliaries of 1X210 MW unit6 at GGSSTP Roopnagar
2022_POWER_90314_1
400/P-3/EMPW-12080 dtd 16.09.22
Open Tender
Miscellaneous Works
Tender cum Auction
30 days
DyCE Headquarters GGSSTP Roopnagar
Please refer tender documets
5 documents required · 5 mandatory
₹1,180
₹85,000
Yes
25 Jan 2023
20 Sept 2022
28 Oct 2022
20 Sept 2022
21 Oct 2022
20 Sept 2022
1.1 LUMP SUM RATE for Annual overhauling of Boiler as per scope of work item no.1 of PART-III(A). Note:- Above scope of work includes welding of 500 nos. HP joints HP joints welded more/less than 500 nos. will be paid /recovered @ at sr. no.1.2 below. + 1.2 Rate for extra H.P. joint for tube size 44.5 to 76.1 mm dia of any thickness for the purpose of extra payment/ recovery. + 1.3 Scaffolding Material Retention Charge Beyond 30 Days in case delay is on account of PSPCL. (Total amount for 1.1 to 1.3 from price breakup mentionerd here)
2.1 LUMP SUM RATE for Annual overhauling of wind box and its assemblies and pent house as per scope of work part-III (B). Note;- Above scope of work includes repair/ replacement of roof skin casing as detailed in scope of work upto 75 sq. mtr. area. + 2.2 Replacement of Expansion Bellow of Secondary air duct as per item 1(i) of scope of work Part- III(C) (Total amount for 2.1 to 2.2 from price breakup mentionerd here)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .