Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 L+₹27,765.83 (14.0%)Rejected-AOC | ₹2.3 L+₹27,765.83 (14.0%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.3 L+₹32,436.92 (16.3%)Rejected-AOC | ₹2.3 L+₹32,436.92 (16.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.4 L+₹36,740.24 (18.5%)Rejected-AOC | ₹2.4 L+₹36,740.24 (18.5%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.4 L+₹40,096.66 (20.2%)Rejected-AOC | ₹2.4 L+₹40,096.66 (20.2%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | P.Ragupathy & Co L5 | SKA CONSTRUCTIONS L3 | APP Construction L6 | P Thangaraj L2 | RAINBOW CONSTRUCTION L1 | V RAMASAMY L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of Segregation Shed at Nanjai Uthukuli H/O Nanjai Uthukuli, Modakkurichi Panchayat Union of Erode District, under SBM II - 2026-27 | |||||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay,stiff black cotton soil,hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation | 3.76 | Cum | 220 ₹827.2 | 132 ₹496.32 Lowest | 221.7 ₹833.59 | 204 ₹767.04 | 180.1 ₹677.18 | 204 ₹767.04 |
| 3.00 | Filling with M.Sand complying the standard specification including all cost and conveyance and labour charges etc., complete | 4.66 | Cum | 1,480 ₹6,896.8 | 214 ₹997.24 Lowest | 1,569 ₹7,311.54 | 1,416 ₹6,598.56 | 1,275 ₹5,941.5 | 1,416 ₹6,598.56 |
| 4.00 | Supply and erection of steel shuttering for sides and soffits using M.S.sheet and angles and strutting upto 3.00 in height including hire charges for all materials to site and all labour charges etc.,complete. | 5.73 | Sqm | 450 ₹2,578.5 | 349 ₹1,999.77 Lowest | 460.1 ₹2,636.37 | 425 ₹2,435.25 | 373.9 ₹2,142.45 | 425 ₹2,435.25 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc., complete. | 5.25 | Cum | 4,495 ₹23,598.75 | 5,530 ₹29,032.5 | 4,650 ₹24,412.5 | 4,254 ₹22,333.5 | 3,778.6 ₹19,837.65 Lowest | 4,260 ₹22,365 |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc., complete. | 0.4 | Cum | 5,235 ₹2,094 | 2,500 ₹1,000 Lowest | 5,401.2 ₹2,160.48 | 4,950 ₹1,980 | 4,389 ₹1,755.6 | 4,950 ₹1,980 |
| 7.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and three M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 2.09 | Cum | 5,295 ₹11,066.55 | 5,580 ₹11,662.2 | 5,349.2 ₹11,179.83 | 4,976 ₹10,399.84 | 4,346.8 ₹9,084.81 Lowest | 4,980 ₹10,408.2 |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 30.91 | Sqm | 235 ₹7,263.85 | 242 ₹7,480.22 | 239.4 ₹7,399.85 | 221 ₹6,831.11 | 194.6 ₹6,015.09 Lowest | 221 ₹6,831.11 |
| 9.00 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 27 | Sqm | 1,390 ₹37,530 | 1,290 ₹34,830 | 1,413.8 ₹38,172.6 | 1,306 ₹35,262 | 1,148.9 ₹31,020.3 Lowest | 1,308 ₹35,316 |
| 10.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.33 | Cum | 5,570 ₹1,838.1 | 3,030 ₹999.9 Lowest | 5,739.1 ₹1,893.9 | 5,266 ₹1,737.78 | 4,663.7 ₹1,539.02 | 5,266 ₹1,737.78 |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
24 Jul 2026, 3:00 pmClosed
Block Development Officer (V.P), Modakkurichi
Block Development Office, Modakkurichi Block
Construction of Segregation Shed at Nanjai Uthukuli H/O Nanjai Uthukuli, Modakkurichi Panchayat Union of Erode District, under SBM II - 2026-27
2026_RDTN_685052_1
Roc No. 1489/2026/B5 Dt. 07.07.2026
Open Tender
Civil Works - Others
Item Rate
60 days
Modakkurichi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
18 Aug 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the Work : Construction of Segregation Shed at Nanjai Uthukuli H/O Nanjai Uthukuli, Modakkurichi Panchayat Union of Erode District, under SBM II - 2026-27 | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay,stiff black cotton soil,hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation | 3.76 | Cum | - | - |
| 3 | Filling with M.Sand complying the standard specification including all cost and conveyance and labour charges etc., complete | 4.66 | Cum | - | - |
| 4 | Supply and erection of steel shuttering for sides and soffits using M.S.sheet and angles and strutting upto 3.00 in height including hire charges for all materials to site and all labour charges etc.,complete. | 5.73 | Sqm | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc., complete. | 5.25 | Cum | - | - |
| 6 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc., complete. | 0.4 | Cum | - | - |
| 7 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and three M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 2.09 | Cum | - | - |
| 8 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 30.91 | Sqm | - | - |
| 9 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 27 | Sqm | - | - |
| 10 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.33 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
techbid.pdf
Tender Documents • 0.74 MB
BOQ_823528.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .