| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | -1.50% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 CrAdmitted-Finance | +1.00% | ₹3.0 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical rejected |
Updated dates
Tender Value
₹3 Cr
EMD Value
₹6 L
Closing Date
1 Jan 2026, 4:00 pmClosed
Executive Engineer Construction Division kashmir
Executive Engineer Construction Division kashmir
Electro-technical works including heating system all weather for toddler swimming pool including construction of change room and washroom and allied works Gindun Raj Bagh
2025_SPORT_298444_1
fresh NIT 60 of 2025-26
Open Tender
Civil Works
120 days
srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,800
EX ENGINEER CDK
₹6 L
Bakhshi Stadium
29 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
1 Jan 2026
23 Dec 2025
22 Dec 2025
Scope of Work : Electro-technical works including heating system (all weather) for toddler swimming pool including construction of change room and washroom and allied works Gindun Raj Bagh. 1. The building is to be constructed as per conceptual detail plans as per drawing attached as Annexure “A” with this document. 2. The existing toddler pool building is to be provided and fixed with 40mm thick puff panel as ceiling cover and 50mm thick puff panel in walls. This treatment is to be given to the machine room/change room and as proposed by site engineer prepared building as well. 3. The newly extended structure along with the existing toddler pool building is to be provided and fixed with ACP as per direction of the engineer in charge on the external face. 4. The entire wash room/change room blocksas in the drawing as per Annexure A) are to be provided with complete sanitary fittings which include tiling /granite work and necessary partitioning as per direction of the Engineer in charge. 5. This also includes complete disposal system i.e. soakage pit, manholes and septic tanks as per requirement along with water storage tanks and pumps and as instructed by Engineer In-charge. 6. The necessary filtration system which includes pressure tank filter, circulation pumps, dosing tanks and heating pumps of approved brandas required for all weather functioning of the pool as per direction of Engineer in charge. 7. Complete electrification which means lighting / other electric requirements for the system operation of the pool complete job as approved by Engineer in charge and required for successful functioning of the Project. 8. The dimensions of proposed construction may be adjusted/changed upto 05% with the project cost as per site requirement and as per direction of Engineer in charge due to site constraints if required. 9. This also includes main control panel and servo stabilizer as per requirements and the wiring for underwater lights. 10. This also includes complete maintenance and operation for a period of 18 months. 11. The design is to be got prepared by the contractor from any competent consultant and got vetted by 3rd partyi.e. (NIT, IIT, DIQC)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_967338.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid