| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-AOC | ₹41.8 L Quoted ₹42.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹42.4 L+₹22,419.50 (0.53%)Rejected-Finance VILL ATHMAN PO AMB TEH AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹42.4 L+₹22,419.50 (0.53%) | L2 | Rejected-Finance Second lowest bidder |
| 3 | L3₹42.8 L+₹68,653.50 (1.63%)Rejected-Finance HIMACHAL PRADESH HP | SOLAN | HIMACHAL PRADESH | 173202 | ₹42.8 L+₹68,653.50 (1.63%) | L3 | Rejected-Finance Third lowest bidder |
| 4 | L4₹45.8 L+₹3.6 L (8.56%)Rejected-Finance VPO SANTOKHGARH TEHSIL DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹45.8 L+₹3.6 L (8.56%) | L4 | Rejected-Finance Fourth lowest bidder |
| 5 | Rejected-Technical VPO BHADERKALI TEHSIL GHANARI DISTT UNA HP | - | - | Rejected-Technical Inappropriate Contractor Class |
Tender Value
₹46.8 L
EMD Value
₹94,000
Closing Date
14 Oct 2019, 5:00 pmClosed
Executive Engineer
HPSIDC Ltd. Shimla
Construction of Storm water drain at Ind. Area Jeetpur Bheri, Distt. Una (HP).
2019_SIDC_31752_1
Job No. 7
Open Tender
Civil Works
Item Rate
180 days
Jeetpur Bheri
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,500
EE HPSIDC Ltd. Shimla
₹94,000
5 Aug 2021
25 Sept 2019
15 Oct 2019
25 Sept 2019
14 Oct 2019
25 Sept 2019
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead, dressing of sides and bottom and backfilling in trenches with excavated suitable material with in all leads and lifts.
Providing and Laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 1:5:10 (1 cement : 5 Sand :10 crushed graded stone aggregate 40mm nominal size) including cost of formwork & carriage of material with in all lead and lift.
Providing and Laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 1:3:6 (1 cement : 3 Sand :6 crushed graded stone aggregate 40mm nominal size) and curing complete including cost of formwork & carriage of material with in all lead and lift.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 1:2:4 (1 cement : 2 Sand : 4 crushed graded stone aggregate 20mm nominal size) including cost of formwork & carriage of material with in all lead and lift.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 1:1.5:3 (1 cement : 1.5 Sand : 3 graded stone aggregate 20mm nominal size) including cost of formwork & carriage of material with in all lead and lift.
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical / as per HPPWD specification Clauses 1002, 1005, 1010 & 1202 including carriage of material with in all lead and lift.
Dressing the ground including cutting and filling upto 15 cm including carriage of material with in all lead and lift.
Sandeep Kumar Dhiman
SANDEEP SHARMA
Pershant Rai
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .