Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC WARD NO 20 NEAR BMS OFFICE PARASIA DISTT CHHINDWARA M P PIN 480441 | PARASIA | CHHINDWARA | MADHYA PRADESH | 480441 | L1 | Accepted-AOC Bidder is L1 and has quoted lowest | |
| 2 | L2₹4.1 L+₹66,485.80 (19.4%)Rejected-Finance | L2 | Rejected-Finance Bidder is quoted higher rate | |
| 3 | L3₹4.7 L+₹1.3 L (36.8%)Rejected-Finance URDHAN BASTI PO URDHAN DISTT CHHINDWARA M P PIN NO 480441 | CHHINDWARA | CHHINDWARA | M P | 480441 | L3 | Rejected-Finance Bidder is quoted higher rate |
Tender Value
₹5.9 L
EMD Value
₹7,500
Closing Date
22 May 2023, 3:00 pmClosed
Staff Officer (Civil), Pench Area
Staff Officer (Civil), AGM Office, Pench Area, P.O. Parasia, Dist. Chhindwara (M.P.) 480441
Construction of check dam to collect and prevent entry of sediments into Gunnor river, at Nehariya under Nehariya Sub-Area.
2023_WCL_278983_2
pe3350-civ-s-e003-2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
NEHARIYA
AS Per NIT
3 documents required · 3 mandatory
₹7,500
24 Aug 2023
11 May 2023
23 May 2023
11 May 2023
22 May 2023
11 May 2023
11 May 2023 - 18 May 2023
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in Mechanical Means Depth upto 3 m
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : Providing and fixing tie bolt, spring coil and plastic cone in wall shuttering complete as per the direction of Engineer-in-charge 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Hot rolled deformed bars
Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete. (Payment for Stone to be made separately).
Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site
Total impact of GST for the purpose of CTC
ANUJ KUMAR RAI
SILEET ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .