Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance GOPALGANJ GOPALGANJ BIHAR | GOPALGANJ | GOPALGANJ | BIHAR | 841428 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.8 L
EMD Value
₹23,600
Closing Date
24 Mar 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of RCC drain with precast slab along main road near Dakaita main gate under Rajmahal Area.
2026_ECL_356721_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/668 Dt-14.03.2026
Open Tender
Civil Works - Others
Percentage
30 days
Dakaita rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹23,600
25 Mar 2026
14 Mar 2026
25 Mar 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
14 Mar 2026 - 17 Mar 2026
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars .
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
finance_369583.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_369583.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .