Loading…
Loading…
Tender Value
₹41.7 L
EMD Value
₹41,700
Closing Date
25 Aug 2026, 5:00 pm2d left
SE MI Divn Ganjam II Berhampur
SE MI Divn Ganjam II Berhampur
Reno. to Gamundabandha MIP at Bhatakhali in Polasara block under Improvement to Tanks and MIPs
2026_CEMIB_138108_20
GMID-II/03/2026_27
Open Tender
Civil Works - Roads
Percentage
180 days
SE MI Divn Ganjam II Berhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹41,700
Yes
18 Aug 2026
18 Aug 2026
28 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles & uprooting stumps and small bushes and trees of below 1.00 Mtr girth on premeasurement including removal of debries and depositing the same clear of work site with all leads, lifts and delifts etc with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer-in-charge. | 4,380 | 1 Sqm | 0.27 | ₹1,182.6 |
| 2 | Dismantling old brick or stone masonry in lime or cement mortar at all heights including removal of debris clear away from work site with all leads and lifts and stacking the useful materials for reuse with all labour and T&P materials required for the item complete in all respect as directed by the Engineer-in-charge . | 43.78 | 1 Cum | 1,646.62 | ₹72,089.02 |
| 3 | Excavation , loading, unloading and carriage by mechanical means wihtin 1 KM lead in all kinds of soil including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated material away from work site with all leads, lifts and delifts including dewatering , dressing of earth, spreading , levelling in the disposal location or locations as per requirement , all labour charges, T & P , hire and running charges of all machineries B & O.C. worker's welfare cess etc.complete as per specification and as directed by the Engineer-in-charge. ( Measurement is to be taken on finished approved level section . ) (Over Burden earth) | 484.01 | 1 Cum | 82 | ₹39,688.82 |
| 4 | Excavation , loading, unloading and carriage by mechanical means wihtin 1 KM lead in all kinds of soil including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated material away from work site with all leads, lifts and delifts including dewatering , dressing of earth, spreading , levelling in the disposal location or locations as per requirement , all labour charges, T & P , hire and running charges of all machineries B & O.C. worker's welfare cess etc.complete as per specification and as directed by the Engineer-in-charge. ( Measurement is to be taken on finished approved level section . ) Reservoir bed cutting | 19,259.12 | 1 Cum | 82 | ₹15,79,247.84 |
| 5 | Excavation , loading, unloading and carriage by mechanical means wihtin 1 KM lead in all kinds of soil including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated material away from work site with all leads, lifts and delifts including dewatering , dressing of earth, spreading , levelling in the disposal location or locations as per requirement , all labour charges, T & P , hire and running charges of all machineries B & O.C. worker's welfare cess etc.complete as per specification and as directed by the Engineer-in-charge. ( Measurement is to be taken on finished approved level section . ) Benching and striping | 985.5 | 1 Cum | 82 | ₹80,811 |
| 6 | Excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dressing and leveling the bed to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts etc . including dewatering from foundation if required etc. with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer-in-charge. | 142.8 | 1 Cum | 282.89 | ₹40,396.69 |
| 7 | Filling in foundation and plinth with excavated earth including watering & ramming etc, complete including cost, conveyance, royalty and other taxes of all materials with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge | 47.6 | 1 Cum | 54.67 | ₹2,602.29 |
| 8 | Providing Cement Concrete M15 grade on approved surface, shape and size using 20mm and downgraded crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin surface and any other deleterious material, using clean and sharp sand of approved grading and quality confirming to the design specifications mixing by concrete mixer including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including cost, conveyance, royalty and other taxes of all materials, ( excluding cost, carriage of M.S. rod and labour for cutting, bending, binding and fixing of M.S. rod) with all cost of tools and plant, cost and carriage of water etc, with supply of all labour and supervision charges including mobilisation & demobilisation of machineries, with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 281.27 | 1 Cum | 5,403.35 | ₹15,19,800.25 |
| 9 | Providing Reinforced Cement concrete M20 grade on approved surface, shape and size using 20mm and downgraded crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin surface and any other deleterious material, using clean and sharp sand of approved grading and quality confirming to the design specifications mixing by concrete mixer including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including cost, conveyance, royalty and other taxes of all materials, ( excluding cost, carriage of M.S. rod and labour for cutting, bending, binding and fixing of M.S. rod) with all cost of tools and plant, cost and carriage of water etc, with supply of all labour and supervision charges including mobilisation & demobilisation of machineries, with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 37.2 | 1 Cum | 5,837.61 | ₹2,17,159.09 |
| 10 | Straightening, cutting , bending, binding and tying the HYSD bars and placing in position as reinforcement and anchoring including, lapping where necessary, cost of HYSD bars & binding wire (cost of binding wire including) with all leads, lifts from bending yard to placement point including cost, conveyance, labour, T&P & all taxes required for the item etc. complete in all respect as directed by the Engineer-in-charge. | 8.88 | 1 Qntl | 9,563.78 | ₹84,926.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
Tendernotice_2.pdf
PDF • 4.27 MB
BOQ_606528.xls
BOQ • 0.29 MB
C1.pdf
Additional Documents • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].