| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC first lowest | |
| 2 | L2₹18.6 L+₹81,250.45 (4.56%)Rejected-Finance | L2 | Rejected-Finance Reject due to second lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
2 Feb 2021, 3:00 pmClosed
Executive Engineer
E.E. M.G.C.C.DIV-8 Bulandshahr
LOT-14 Construction of VRB of Tail Escape at Km 2.540
2021_UPIDC_547847_13
08/E.E./2020-21
Open Tender
Civil Works - Canal
Item Rate
180 days
Sambhal
2 documents required · 2 mandatory
₹945
₹40,000
8 Jul 2021
23 Jan 2021
2 Feb 2021
28 Jan 2021
2 Feb 2021
28 Jan 2021
28 Jan 2021 - 1 Feb 2021
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet.
Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying C.C. M-15(1:2.4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying first class m-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P, all lifts and leads etc. complete
Providing and Laying R.C.C. M-20(1:1.5:3) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying C.C. M-25(1:1:2) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR C.C. WORK
FOR R.C.C WORK
Supply and fixing of 20mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge.
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc
Providing and painting Bitumen (85/40 grade ) in two coats including cost of all material, T&P, heating, labour all lifts and leads etc compete as per direction of Engineer-in-Charge
Providing and laying of two coats of tar felt including cost of all materials T&P labour all lifts and leads etc compete as per direction of Engineer-in-Charge.
Providing and 12 MM thick cement plaster in (1:4) C.M. including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work .
Providing and Laying local sand below floor including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and laying stone boulders pitching in launching apron including cost of all material, labour, T&P, all lifts and leads etc compete as per direction of Engineer-in-Charge.
Providing M-150 Brick on edge Pitching including cost of all material, labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-Charge.
Providing M-150 Brick on edge Khadnja including cost of all material, labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-Charge.
M/S SHREE BALAJI CONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .