| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | +0.00% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹6,730 (2.34%)Admitted-Finance | +2.34% | ₹2.9 L+₹6,730 (2.34%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹9,577 (3.33%)Admitted-Finance 233 CHITTARANJAN COLONY MAIL 9 1 NEW SOUTH PARK 700092 | KOLKATA | WEST BENGAL | 700092 | +3.33% | ₹3.0 L+₹9,577 (3.33%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,800
Closing Date
21 Sept 2026, 5:00 pmClosed
EE-X
28, P.A SHAH ROAD, KOL-33
DEVELOPMENT OF CEMENT CONCRETE PASSAGE AT GANESH BANERJEE ROAD NEAR PREMISES NO 1 AND 6/8 IN WARD NO-092.
2026_KMC_1041572_1
EEC/092/004/2026-2027
Open Tender
CIVIL WORKS
Percentage
40 days
WARD-092
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,800
24 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 75 | SQM | 14.4 | ₹1,080 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 144 | SQM | 50 | ₹7,200 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1.44 | %SQ | 981 | ₹1,412.64 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | 16.43 | M3 | 1,172.6 | ₹19,259.95 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion | 146 | MTR | 79 | ₹11,534 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 43.2 | SQM | 40 | ₹1,728 |
| 7 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 175.8 | SQM | 361 | ₹63,463.8 |
| 8 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(1).25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C). | 16.43 | M3 | 5,498 | ₹90,304.65 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor | 2 | EA | 1,511.81 | ₹3,023.62 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 2 | EA | 1,455.5 | ₹2,911 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
TF.pdf
Tender Documents • 0.59 MB
civil_new.pdf
Additional Documents • 4.88 MB
BOQ_2557275.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .