Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.3 LAccepted-AOC | ₹40.3 L | L1 | Accepted-AOC BEING L1 BIDDER |
| 2 | L2₹40.6 L+₹29,185 (0.72%)Rejected-Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | ₹40.6 L+₹29,185 (0.72%) | L2 | Rejected-Finance BEING NOT L1 BIDDER |
| 3 | L3₹40.9 L+₹58,369 (1.45%)Rejected-Finance | ₹40.9 L+₹58,369 (1.45%) | L3 | Rejected-Finance BEING NOT L1 BIDDER |
| 4 | L3₹40.9 L+₹58,369 (1.45%)Rejected-Finance | ₹40.9 L+₹58,369 (1.45%) | L3 | Rejected-Finance BEING NOT L1 BIDDER |
| 5 | L3₹40.9 L+₹58,369 (1.45%)Rejected-Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | ₹40.9 L+₹58,369 (1.45%) | L3 | Rejected-Finance BEING NOT L1 BIDDER |
Tender Value
₹58.4 L
EMD Value
₹59,000
Closing Date
25 May 2026, 5:30 pmClosed
Executive Engineer, Drainage Division, Berhampur
O/o the Executive Engineer, Drainage Division, BAM
DECONGESTION
2026_CEDC_129054_3
e-Procurement Notice NO-01/2026-27
National Competitive Bid
Civil Works - Others
Percentage
180 days
GANJAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹59,000
Yes
30 Jul 2026
11 May 2026
28 May 2026
11 May 2026
25 May 2026
11 May 2026
11 May 2026 - 15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of heavy jungle including uprooting stumps of trees and trees above 1m girth and thick bushes including bamboo on premeasurement and deposing the debies away form the work site with all lead, lift and delift including all labour, cess, T&P, taxes of all materials excluding GST, as required for the work etc compelte as per direction of the Engineer incharge. | 3,77,600 | one sqm | - | - |
| 2 | Clearing of thickly grown water hyacinth from drainage channels on premeasurement and deposing the debies away form the work site with all lead, lift and delift including all labour, cess, T&P, taxes of all materials excluding GST, as required for the work etc compelte as per direction of the Engineer incharge. | 4,78,600 | one sqm | 2.83 | ₹13,54,438 |
| 3 | Clearing of moderately grown water hyacinth from drainage channels on premeasurement and deposing the debies away form the work site with all lead, lift and delift including all labour, cess, T&P, taxes of all materials excluding GST, as required for the work etc compelte as per direction of the Engineer incharge. | 2,39,300 | one sqm | 2 | ₹4,78,600 |
| 4 | Excavation in any approved type soil in approved borrow area by Mechanical means loading into and transportation by mechanical means and unloading soil with all leads, lifts and delifts on properly prepared and scientifically approved surface to the designed section. Clean from weeds and roots including spreading and leveling the earth in 22.5 cm layers as per the approved profile of canal to line and grade breaking clods to max. 5 to 7 cm including cost, conveyance of earth hire and running charges of transport vehicles, maintenance of haul road and approach road, taxes of all materials excluding GST etc. complete as per specification and direction of the Engineer in charge. ( Measurement to be taken on finished compacted section of the fill basing on initial and final levels). | 4,765 | one cum | 103.9 | ₹4,95,083.5 |
| 5 | Excavation of canal / drain in both wet & dry condition by Mechanical means in all kinds of soil including slushy soil requiring the aid of pans. and vessels, rough dressing and leveling the excavated canal / drain slopes and bed to design section and depositing the excavated materials in spoil bank or to any other specified area to proper section with all leads, lifts, delift, handling, rehandling and dewatering etc. complete including construction and maintenance of approach road, diversion road, coffer dam, taxes of all materials excluding GST but including cess, T&P etc. including mobilization and demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer-in-Charge. Measurement will be made as per finished level section. | 75,480.21 | one cum | 35.6 | ₹26,87,095.48 |
| 6 | Providing and laying cement concrete M15 in approved surface using 20 mm down graded size crusher broken hard granite free from weathered skin surface and any other deleterious materials, using sharp sand of approved quality conforming to the specifications, using water of approved quality and using cement as per approved specification with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties, EMF, DMF, Additional charges, T&P, cess and taxes of all materials excluding GST and dewatering by suitable means with all cost, mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, watering, curing for specified days by suitable means including cost and carriage of water, construction of coffer dam / approach road, diversion road, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings and specifications and direction of the Engineer-in-Charge. | 85.8 | one cum | 5,940.6 | ₹5,09,703.48 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_590499.xls
BOQ • 0.29 MB
TECHNICAL03.pdf
Tender Documents • 12.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .