| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC 4 13A PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹5.1 L Quoted ₹4.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.7 LRejected-AOC NO 42 PERIYAN NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹4.7 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ANNAI ENTERPRISES L1 | T S CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the casing cover of blowers 2A & 2B for painting and reassembling after completion of painting works. | 2 | Nos | 8,311 ₹16,622 | 8,500 ₹17,000 |
| 2.00 | Charges for scratching and cleaning, painting with epoxy zinc chromate primer one coat and epoxy smoke grey paint two coat for AWS Blowers 2A & 2B, damper, discharge ducts, motor guard , Blower room door, eliminator frame, spray system pipes, water strainer structure, platform & its structure. | 444 | m2 | 208.3 ₹92,485.20 | 220 ₹97,680 |
| 3.00 | Charges for dismantling the water spray nipples and nozzles from the pipe line and scratching & cleaning and then re-fixing in the pipe line. | 504 | Nos | 40.8 ₹20,563.20 | 45 ₹22,680 |
| 4.00 | Charges for flushing the spray system pipe line | 1 | No | 10,732 ₹10,732 | 11,000 ₹11,000 |
| 5.00 | Charges for Pump complete overhauling and changing the worn out spares parts if necessary. | 3 | Nos | 8,799 ₹26,397 | 9,000 ₹27,000 |
| 6.00 | Charges for Refitting the pump with both suction and discharge pipe flanges with new gasket, coupling the motor with pump, checking axial and radial misalignment between pump and motor and completing the alignment within the prescribed limits and commissioning satisfactory. | 3 | Nos | 8,799 ₹26,397 | 9,000 ₹27,000 |
| 7.00 | Charges of cutting & dismantling the damaged eroded 200NB(GI) spray system Horizontal header pipe in AWS Unit-II, transporting, lead , lift and erection of new GI ERW Pipe 200NB with necessary fittings and devolution the scrap material to central stores (lorry will be provided by Board). | 1 | No | 42,930 ₹42,930 | 44,000 ₹44,000 |
| 8.00 | Charges for welding the new 200NB(GI) spray system header pipe lines with the existing 200NB MS Pipe.
{The above work is inline Labour charges for IBR welding for Replacing the defective drain line valves or equivalent in Cooling water lines and ACW lines by Non IBR welder.( ERW pipe, reducer& bends) Rate for Two number Non IBR cutting and welding | 14 | Joints | 1,405 ₹19,670 | 1,500 ₹21,000 |
| 9.00 | Charges for drilling holes and welding the 40NB GI coupling in the new 200NB(GI) spray system horizontal header pipe lines | 28 | Nos | 478 ₹13,384 | 500 ₹14,000 |
| 10.00 | Charges for Dismantling the Valves from the pipe line and Overhauling and then refitting of 250 mm / 200 mm AWCW Pump suction and discharge side Gate valves & drain Valve from the spray system sump tank and cleaning of seating surface and lapping of valve gate and seat for perfect matching. | 3 | Nos | 10,732 ₹32,196 | 11,000 ₹33,000 |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
18 Oct 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant AC Plant Unit II COH 2024 25 Air Washer System Epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 NB GI header pipe vibration pads Overhauling the Blower 2
2024_EB_490917_1
CE / MTPS-I / SE / M-I / MP /OT.201/ 2024-25
Open Tender
Power/Energy Projects/Products
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,700
Yes
21 May 2026
4 Oct 2024
19 Oct 2024
4 Oct 2024
18 Oct 2024
4 Oct 2024
Amount
Charges for dismantling the casing cover of blowers 2A & 2B for painting and reassembling after completion of painting works.
Charges for scratching and cleaning, painting with epoxy zinc chromate primer one coat and epoxy smoke grey paint two coat for AWS Blowers 2A & 2B, damper, discharge ducts, motor guard , Blower room door, eliminator frame, spray system pipes, water strainer structure, platform & its structure.
Charges for dismantling the water spray nipples and nozzles from the pipe line and scratching & cleaning and then re-fixing in the pipe line.
Charges for flushing the spray system pipe line
Charges for Pump complete overhauling and changing the worn out spares parts if necessary.
Charges for Refitting the pump with both suction and discharge pipe flanges with new gasket, coupling the motor with pump, checking axial and radial misalignment between pump and motor and completing the alignment within the prescribed limits and commissioning satisfactory.
Charges of cutting & dismantling the damaged eroded 200NB(GI) spray system Horizontal header pipe in AWS Unit-II, transporting, lead , lift and erection of new GI ERW Pipe 200NB with necessary fittings and devolution the scrap material to central stores (lorry will be provided by Board).
Charges for welding the new 200NB(GI) spray system header pipe lines with the existing 200NB MS Pipe. {The above work is inline Labour charges for IBR welding for Replacing the defective drain line valves or equivalent in Cooling water lines and ACW lines by Non IBR welder.( ERW pipe, reducer& bends) Rate for Two number Non IBR cutting and welding
Charges for drilling holes and welding the 40NB GI coupling in the new 200NB(GI) spray system horizontal header pipe lines
Charges for Dismantling the Valves from the pipe line and Overhauling and then refitting of 250 mm / 200 mm AWCW Pump suction and discharge side Gate valves & drain Valve from the spray system sump tank and cleaning of seating surface and lapping of valve gate and seat for perfect matching.
Charges for fixing the canvas cloth bellow joint in the Air Washer fan discharge line inside the Air Washer room(Blower 2A )
Charges for dismantling the damaged vibration pad (9 Nos.) from the 2B blower base structural frame and fixing the new vibration pad
DAMPER BOX i) Fixing the MS angle inside the damper box to hold the leaves and drilling for holes for damper box.
ii) Welding the MS Plate drilling holes in the damper bolts.
iii) Dismantling the existing damper box from blower unit for damper box.
iv) Erecting the new damper leaves with the blower unit for damper box.
Cost of Zinc Phosphate Epoxy Primer
Cost of Epoxy paint smoke grey
Cost of Epoxy Thinner
Canvass cloth Cost of Canvas cloth Rs.210 X 9.680 meters
Cost of GI bolt (8 mm X 25 mm length) with nuts and GI washer
DAMPER BOX SS Rod Dia 12 mm for 14 sets 7 mtrs length
Machining of SS rod for 12 mm dia drilling holes to the required size for 14 sets
25 mm bronze rod for machining bushes 2 mtrs 3.03 kg/mtr total 6.06 kg
Machining of bronzed bush of the required size for 28 pieces
GI bolts & nuts with washers to fix the damper leaves with SS rod.
Fabrication of the (GI 18 SWG) damper leaves 14 Nos.
GI bolts (10 mm X 40 mm) with washers 160 Nos.
One set of cutting gas
Charges for consumables and T & Ps for Sl. No. 1 to 16
T S CONTRACTOR (BID ID -1165151)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_583254.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid