| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹10,928 (0.09%)Rejected-AOC | ₹1.2 Cr+₹10,928 (0.09%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
15 May 2023, 3:00 pmClosed
Additional Collector (Dev.) / Project Director
DRDA, Salem
Salem District - Attur Block - Strengthening and 5Yrs Maintenance of the 2 Roads Package No.SLM-61/2022-23 under MGSMT-2022-23
2023_RDTN_303533_87
Roc.No.626/2023/A3
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA
As per tender Document
3 documents required · 3 mandatory
₹0
₹1.2 L
12 Jul 2023
27 Apr 2023
15 May 2023
27 Apr 2023
15 May 2023
27 Apr 2023
Amount
1)Strengthening the Road from Kallanatham Vaithiyanathapuram North Ganapathy kadu to Muttal Milk Society Km 0/0-2/10 R 136 Kallanatham panchayat
Clearing the jungle including removing from the site disposal by buying or burning etc., complete as directed by the departmental officers
Providing Gravel soling to 100mm thick including cost & conveyance of gravel from approved sources to work site and stacking on road side to departmental metric gauge for pre measurements as directed including labour for spreading and compacting etc.,Side berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime coat over the WMM surface using 7.00 kg of bituminous emulsion(SS1) for 10 sqm including cost of emulsion bitumen which will be supplied by the department and section store including cost handling charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour for applying and required quantity of bitumen including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed as per standard specification
Providing and laying Tack coat over the WMM surface using 2.50 kg of bituminous emulsion for 10 sqm including cost of emulsion bitumen which will be supplied by the department and section store including cost handling charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour for applying and required quantity of bitumen including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed as per standard specification
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Provision for HM stone
Provision for KM stone
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
2)Strenthening to the road from Gandhipuram to Thavalapatty Km 0/0-1/10 R 358 Koolamedu panchayat
Clearing the jungle including removing from the site disposal by buying or burning etc., complete as directed by the departmental officers
Providing Gravel soling to 100mm thick including cost & conveyance of gravel from approved sources to work site and stacking on road side to departmental metric gauge for pre measurements as directed including labour for spreading and compacting etc.,Side berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime coat over the WMM surface using 7.00 kg of bituminous emulsion(SS1) for 10 sqm including cost of emulsion bitumen which will be supplied by the department and section store including cost handling charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour for applying and required quantity of bitumen including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed as per standard specification
Providing and laying Tack coat over the WMM surface using 2.50 kg of bituminous emulsion for 10 sqm including cost of emulsion bitumen which will be supplied by the department and section store including cost handling charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour for applying and required quantity of bitumen including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed as per standard specification
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Provision for HM stone
Provision for KM stone
Provision for Sing Board
Provision for KM stone
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KALYAA CONSTRUCTIOn
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .