Tender Value
₹29.7 L
EMD Value
₹29,680
Closing Date
22 Jan 2026, 10:00 pmClosed
Directorate of Municipal Administration
Harish B
Installation of Drain covering slabs infront of R O plant Ward no 9 TCC limits, Construction of Road and drain beside Nirmaladevi park MIG stage Housing board colony ward no 03 TCC limits, Constructin of Drain near Ambedkar colony ward 06 TCC limits
DMA/2025-26/RD/WORK_INDENT52962
DMA/2025-26/RD/WORK_INDENT52962
Reserved
Roads
Electronic Documents, First(One Cover)
DMA City Corporation Tumakuru
6 documents required · 6 mandatory
₹750
₹29,680
22 Jan 2026
7 Jan 2026
14 Jan 2026
Construction of Road and drain work at MIG Stage in KHB layout beside nirmaladevi park in ward no 3 under tumkur city corporation limits
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply ...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding
Consider 35% of item concrete rate for Drain walls(rate=6221*35%) ---- etc, including all lead and lifts
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 5% of item concrete rate for drain bed...
Constructin of Drain near Ambedkar colony ward 06 TCC limits
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply ...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 35% of item concrete rate for drain wa...
Installation of Drain covering slabs infront of R O plant Ward no 9 TCC limits
Demolishing lime concrete manually/ by mechanical means and disposal of material to the appropriate disposal area as per direction of Engineer- in-charge. ---- etc, including all lead and lifts
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply ...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. ---- etc, including all lead and lifts
Installation of Drain covering slabs infront of R O plant Ward no 9 TCC limits, Construction of Road and drain beside Nirmaladevi park MIG stage Housing board colony ward no 03 TCC limits, Construction of Drain near Ambedkar colony ward 06 TCC limits
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Demolishing lime concrete manually/ by mechanical means and disposal of material to the appropriate disposal area as per direction of Engineer- in-charge. ---- etc, including all lead and lifts
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply ...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. ---- etc, including all lead and lifts
Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding
Consider 35% of item concrete rate for Drain walls(rate=6221*35%) ---- etc, including all lead and lifts
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 35% of item concrete rate for drain wa...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 5% of item concrete rate for drain bed...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw2 52962.doc
Tender Document • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .