| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.4 LAccepted-AOC | 1 | Accepted-AOC Accepted- Finance | |
| 2 | 2₹19.7 L+₹29,142.75 (1.50%)Rejected-Finance | 2 | Rejected-Finance Quoted Amount is 99 percent of Estimate value. |
| Sl No | Description | Qty | Unit | A DHANDAPANI L1 | VENKATACHALAM A L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Providing Construction of the 30000 lit RCC OHT 12 mtr stage under Water supply to at Thattampudhur AD Colony H/o Maccinamcombai | |||||
| 2.00Earthwork excavation and deposting on bank with in an initial lead of 10mt and lift of 2 mt in all soils and as directed by deportmental | |||||
| 3.00 | A) First depth of 2 mt | 29.95 | cum | 263.78 ₹7,900.21 Lowest | 270 ₹8,086.5 |
| 4.00Second depth 2 m- 3m | |||||
| 5.00 | In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting | 12.58 | cum | 392.88 ₹4,944 Lowest | 400 ₹5,033.6 |
| 6.00PCC 1:4:8 Using 40mm HBS metal for levelling course for foundation including cost of mixing concrete, ramming curing etc. Complete | |||||
| 7.00 | A) For Base slab 0 mt to 1.5 mt blow GL | 0.3 | cum | 5,478.02 ₹1,643.41 Lowest | 5,500 ₹1,650 |
| 8.00 | B) For Coloumn Footing 1.5 mt to 4.5 mt blow GL | 2.9 | cum | 5,616.79 ₹16,288.69 Lowest | 5,650 ₹16,385 |
| 9.00RCC 1 : 11/2 :3 Using 20HBS metal excluding cost of reinforcement, centering, shuttering strutting, but including mixing concrete, placing laying, curing, finishing etc.complete. | |||||
| 10.00 | A) For items 1.5 m to 4.5 m blow GL | 5.65 | cum | 9,355.56 ₹52,858.91 Lowest | 9,390 ₹53,053.5 |
Tender Value
₹19.7 L
EMD Value
₹19,710
Closing Date
18 Dec 2025, 3:00 pmClosed
Block Development Officer(BP) Sathyamanagalam
Block Development Officer(BP) Sathyamanagalam
Providing Construction of the 30000 lit RCC OHT 12 mtr stage under Water supply to at Thattampudhur AD Colony H/o Maccinamcombai
2025_RDTN_629791_2
Roc No.1234/2025/A2 Dated.03.12.2025
Open Tender
Civil Works - Water Works
Item Rate
180 days
Block Development Officer(BP) Sathyamanagalam
Providing Construction of the 30000 lit RCC OHT 12 mtr stage under Water supply to at Thattampudhur AD Colony H/o Maccinamcombai
2 documents required · 2 mandatory
₹0
₹19,710
Yes
18 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
Amount
Earthwork excavation and deposting on bank with in an initial lead of 10mt and lift of 2 mt in all soils and as directed by deportmental
A) First depth of 2 mt
Second depth 2 m- 3m
In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting
PCC 1:4:8 Using 40mm HBS metal for levelling course for foundation including cost of mixing concrete, ramming curing etc. Complete
A) For Base slab 0 mt to 1.5 mt blow GL
B) For Coloumn Footing 1.5 mt to 4.5 mt blow GL
RCC 1 : 11/2 :3 Using 20HBS metal excluding cost of reinforcement, centering, shuttering strutting, but including mixing concrete, placing laying, curing, finishing etc.complete.
A) For items 1.5 m to 4.5 m blow GL
B) For items 0 m to 1.5m below GL
C) For items 0m to 4.50m above GL
D) For items above 4.50m to 7.32m from GL
E) For items above 7.32 & upto 10.98m from GL
F) For items above 10.98 & upto 14.64m from GL
G) For items above 14.64 & upto 18.30m from GL
Steel centering for sides and soffits including necessary supports and strutting to the required height for RCC items using M.S sheet of suitable size of BG 10 gauge stiffened with welded MS angles of size 25mm x 25mm x 3m of boarding, laid over silver
Plane Surface
A) Plane Surfaces Below GL
B) GL to 3.30m above GL
C) From 5.30m to 6.30m height
D) From 8.30m to 9.30m height
F) From 11.30m to 12.30m height
Curved surface
G) 0 to 3.30mt height at above working Platform
Square column
H) 0 to 3.30 mt Below GL Square Coloum at 0 to 1.50 mt
I) 0 to 3.30 mt above G.L
J) Square Coloum at 3.30 to 4.30mt above G.L
K) Square Coloum at 4.30 to 5.30mt above G.L
L) Square Coloum at 5.30 to 6.30mt above G.L
M) Square Coloum at 6.30 to 7.30mt above G.L
N) Square Coloum at 7.30 to 8.30mt above G.L
O) Square Coloum at 8.30 to 9.30mt above G.L
P) Square Coloum at 9.30 to 10.30mt above G.L
Q) 10.30 to 11.30m mt above G.L Square Coloum at ( 10.30 to 11.21m
Square Coloum at 11.31 to 12.30m mt above G.L ( 11.31 to 11.45m )
Supplying fabrication and placing in position of steel rod cutting tying etc. complete including cost of rainforcement HSD rods
Refilling the foundation with excavated earth including consolidation
Exterier plastic emulsion painting two coats with approved emultion paint including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing of Cut stone in RCC 1 : 11/2 :3 Using 20HBS below inlet pipe
Providing and fixing of RCC inner accass ledder in RCC 1:1.5:3 using 20mm HBS stone for OHT including cost of rainforcement , placing grill in position, centering shuttering charges, mixing concrete, curing, etc.,
Supply, delivery and fixing of Outside M.S. ladder of 4.5cm width made out off 50x50x6mtr M.S. angle for sides and steps in 16mm MS plain rods fixed at 30cm center to center welded, jointed etc., providing with suitable side supports, clamps,and locking arrangements provided with one cost of red oxide paint for providing access to roof top of OHT of suitable inclined length, including bottom anchorage and transportation.
Supply and delivery of manhole cover of size 60cm x 60cm (heavy duty) with frame
Fixing of manhole cover in RCC 1:1.5:3 with suitable rainforcement in M.S angle fixed along edges
Supplying and fixing of PVC ventilating mosquito proof nylon net with 110mm PVC pipes and cowl
Supply of 65 mm GI Pipe
65mm G.M. Gate Valves
65mm G.I. Elbow
65mm G.I. coupler
65mm C.I. Flange
Providing labour charges for pipe connections to the OHT with GI pipes and Specials including cutting, threading etc. complete.
Painting scheme details in accordance with the size and specifications including writing details like, name of scheme, estimate amount capacity of service Reservoir etc.
Providing Overflow pipes Choke pit of Size 0.90 mt dia x 1.00 mt depth including cost of RCC pipes and filing of all materials ,labour charges
Chlorination input unit with Pipes and Specials
Supply and Delivery of 90 mm PVC Pipe 6 ksc
Earth work excavation and depositing on bank eith initial lead of 10mt and lift of 2 mt in narrow trenches for hard stiff clay ,stiff block cotton soil ( SS20B )
Laying and Jointing of 90mm PVC pipes
Refilling the trench with excavated soil
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
VENKATACHALAM A (BID ID -1531459)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_753104.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.34 MB
techbidMakinamkombai.pdf
Tender Documents • 0.56 MB
BOQ_753104.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .