Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance PLOT NO U 58 MIDC AREA MIDC AREA HINGNA ROAD MIDC HINGNA NAGPUR MAHARASHTRA 440016 | NAGPUR | MAHARASHTRA | 440016 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.0 L
EMD Value
₹8,747
Closing Date
28 Jun 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER E and M
OFFICE OF THE AREA GENERAL MANAGER, WCL PENCH AREA, PARASIA 480441
Repairing of five Nos. 33/3.3kV transformers of different ratings at RWS, Pench Area
2023_WCL_281754_1
wcl-pe3350-enm-10-2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
RWS, PENCH AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,747
30 Jun 2023
17 Jun 2023
30 Jun 2023
17 Jun 2023
28 Jun 2023
17 Jun 2023
17 Jun 2023 - 22 Jun 2023
Amount
Repairing of one No. 2MVA transformer 33/3.3KV at Regional Workshop Chandametta
COMPLETE REWINDING HV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING LV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATION I.E., MICA, PAPER, SLEEVES, VARNISH, BAKELITE, ETC.
DEHYDRATION OF COMPLETE UNIT IN OVEN
FILLING AND FILTRATION OF TRANSFORMER OIL
INSIDE AND OUTSIDE PAINTING
TESTING AS PER ISO:2026
REPLACEMENT OF BURNT BRASS METAL OF HV AND LV SIDE TERMINAL ROD AND MS HARDWARE
SUPPLY AND INSTALLATION OF WINDING TEMPERATURE SWITCH/INDICATOR OF TRANSFORMER
SUPPLY AND INSTALLATION OF OIL TEMPERATURE SWITCH/INDICATOR OF TRANSFORMER
LABOUR CHARGES
Repairing of three Nos. 1.6MVA transformers 33/3.3kV at Regional Workshop Chandametta
COMPLETE REWINDING HV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING LV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATION I.E., MICA, PAPER, SLEEVES, VARNISH, BAKELITE, ETC.
DEHYDRATION OF COMPLETE UNIT IN OVEN
FILLING AND FILTRATION OF TRANSFORMER OIL
INSIDE AND OUTSIDE PAINTING
TESTING AS PER ISO:2026
REPLACEMENT OF BURNT BRASS METAL OF HV AND LV SIDE TERMINAL ROD AND MS HARDWARE
SUPPLY AND INSTALLATION OF WINDING TEMPERATURE SWITCH/INDICATOR OF TRANSFORMER
SUPPLY AND INSTALLATION OF OIL TEMPERATURE SWITCH/INDICATOR OF TRANSFORMER
LABOUR CHARGES
Repairing of one No. 1MVA transformers 33/3.3kV at Regional Workshop Chandametta
COMPLETE REWINDING HV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING LV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATION I.E., MICA, PAPER, SLEEVES, VARNISH, BAKELITE, ETC.
DEHYDRATION OF COMPLETE UNIT IN OVEN
FILLING AND FILTRATION OF TRANSFORMER OIL
INSIDE AND OUTSIDE PAINTING
TESTING AS PER ISO:2026
REPLACEMENT OF BURNT BRASS METAL OF HV AND LV SIDE TERMINAL ROD AND MS HARDWARE
SUPPLY AND INSTALLATION OF WINDING TEMPERATURE SWITCH/INDICATOR OF TRANSFORMER
SUPPLY AND INSTALLATION OF OIL TEMPERATURE SWITCH/INDICATOR OF TRANSFORMER
LABOUR CHARGES
GST as applicable should be quoted in percentage, it will be calculated on total amount of Sl. No. 1.01 to 3.11
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .