Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance | +1.99% | ₹4.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.6 Cr+₹8.2 L (1.81%)Admitted-Finance | +3.84% | ₹4.6 Cr+₹8.2 L (1.81%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 Cr+₹12.0 L (2.67%)Admitted-Finance | +4.71% | ₹4.6 Cr+₹12.0 L (2.67%) | L3 | Admitted-Finance |
| 4 | L4₹4.7 Cr+₹17.7 L (3.93%)Admitted-Finance | +6.00% | ₹4.7 Cr+₹17.7 L (3.93%) | L4 | Admitted-Finance |
| 5 | L5₹4.8 Cr+₹30.7 L (6.80%)Admitted-Finance | +8.93% | ₹4.8 Cr+₹30.7 L (6.80%) | L5 | Admitted-Finance |
Tender Value
₹5.2 Cr
EMD Value
₹10.5 L
Closing Date
24 Aug 2026, 6:00 pmClosed
Addl. Chief Engineer PWD Zone Bharatpur
Addl. Chief Engineer PWD Zone Bharatpur
Package No RJ-22-01/BA-2026-27/NP/5054/10 Cr Work in Distt. Karauli
2026_CEPWD_582795_1
E-NIT No 09/2026-27/Zone Bharatpur
Open Tender
Civil Works - Roads
Percentage
300 days
Karauli
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
as per NIT
₹10.5 L
Yes
Addl. Chief Engineer PWD Zone Bharatpur
3 Sept 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
24 Aug 2026
6 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means In area of non-thorny jungle | - | - | - | - |
| 2 | A/R to Behari Km 0/0 to 3/500 | - | P.Hect | 10,374 | - |
| 3 | A/R to Saklupura Km 0/0 to 2/500 | - | P.Hect | 10,374 | - |
| 4 | A/R to Gubreda Km 0/0 to 1/800 | - | P.Hect | 10,374 | - |
| 5 | Khanwada to Badanpur road Km 0/0 to 2/700 | - | P.Hect | 10,374 | - |
| 6 | A/R to Sorya Km 0/0 to 4/0 | 1 | P.Hect | 10,374 | ₹10,373.99 |
| 7 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | - | - | - | - |
| 8 | A/R to Behari Km 0/0 to 3/500 | - | P.Cum | 44 | - |
| 9 | A/R to Saklupura Km 0/0 to 2/500 | - | P.Cum | 44 | - |
| 10 | A/R to Gubreda Km 0/0 to 1/800 | - | P.Cum | 44 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.34 MB
PotentialtbidRJ2201.pdf
Tender Documents • 15.19 MB
BOQ_1035372.xls
BOQ • 0.51 MB
input.pdf
PDF • 0.16 MB
TechBidcorri.pdf
PDF • 1.25 MB
date_Extende.pdf
PDF • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .