Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹4,400
Closing Date
14 Oct 2026, 2:00 pm
CE/NCTPS-II
Office of CE/NCTPS-II Chennai-120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Construction of RCC retaining wall to avoid earth slip near the Northern side of the cooling water intake structure From CH 0 00m to CH 15 50m and clearing of heavy jungle on ei
2026_EB_708803_1
CE/NCTPS-II/SE/CM/14/2026-27
Open Tender
Civil Works
Works
NCTPS-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,400
Yes
28 Sept 2026
28 Sept 2026
15 Oct 2026
28 Sept 2026
14 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the heavy jungles, including cost of all labour, T&P required and disposal of the cleared jungle 1km away from the site as directed by the Engineer at site, lead, lift etc complete . | 4,015.8 | m2 | - | - |
| 2 | Clearing and removing the Brick debries away from site including cost of all materials, all leads, lifts etc., complete | 4.3 | m3 | - | - |
| 3 | Earth work excavation in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with initial lead of 10m and initial lift of 2m including cost of all materials, labour, lead, lift, etc. complete. | 23.3 | m3 | - | - |
| 4 | Providing and filling with M.sand for base of footing, including cost of all materials, transporting, labour, lead, lift etc., complete. | 4.7 | m3 | - | - |
| 5 | Providing Plain cement concrete 1:4:8 using 40mm size graded hard broken granite stone including cost of all materials, labour, lead, lift, curing etc., complete as directed by the Engineer at site. | 3.5 | m3 | - | - |
| 6 | Providing RTS rods for reinforcement to RCC works including cutting beding, tying and fixing in position as per drawing and specification including cost of all materials such as steel binding wore all labour, lead lift etc complete. | 1,250 | Kgs | - | - |
| 7 | Providing two legged scaffolding for shuttering work using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including logitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails. | 55.8 | m2 | - | - |
| 8 | Shuttering work for Footing and retaining wall including cost of all materials, labour, lead, lift, etc complete | 87.1 | m2 | - | - |
| 9 | Providing RCC 1:1.5:3 using O.P Cement and 12 to 20mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete. | 14.4 | m3 | - | - |
| 10 | Painting with two coats of anti corrosive black paint to the concrete surface below the ground level after applying one coat of primer clearing as per the satisfaction of the site Engineer. The rates including cost of all materials, lead, lift etc., complete. | 24.4 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Spec14.pdf
Tender Documents • 0.78 MB
BOQ_851780.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .