Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC LOWEST RATE APPROVED | |
| 2 | L2₹6.1 L+₹31,716 (5.48%)Rejected-Finance | L2 | Rejected-Finance HIGHEST RATE REJECTED | |
| 3 | Rejected-Technical 2308 SF NO 453 3B1 VEERAPANDI TIRUPUR SOUTH | - | Rejected-Technical REJECT |
Tender Value
Refer Docs
EMD Value
₹7,300
Closing Date
16 Aug 2024, 3:00 pmClosed
EXECUTIVE OFFICER
TOWN PANCHAYAT OFFICE 256C THIRUTHURAIPOONDI ROAD MUTHUPET
Construction Of RCC Pipe Drain With RCC Culvert At Ward No 06, Puthu Kaliyamman Koil Street In Muthupet Town
2024_DTP_471570_1
375/2021
Open Tender
Civil Works
Works
180 days
MUTHUPET TOWN PANCHAYAT OFFICE
CLASS II
3 documents required · 3 mandatory
₹0
₹7,300
MUTHUPET TOWN PANCHAYAT OFFICE
2 Sept 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
9 Aug 2024 - 16 Aug 2024
9 Aug 2024
Dismantling, Clearing away and carefully stacking materials useful for reuse for any thickness of Reinforcement cement concrete including cost and conveyance of all materials and labour charges etc complete as per standard specification.
Dismantling, Clearing away and carefully stacking materials useful for reuse for any thickness of Plain cement concrete including cost and conveyance of all materials and labour charges etc complete as per standard specification.
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Supply delivery and filling of Stone Dust in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyence of sand to Site and all labour charges and all other incidential charges etc,. complete as per Standard Specification
Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Without Strutting
With Strutting
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.
Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supplying and fixing RCC Pre cast slab in RCC 1:1 1/2:3 mix including cost of reinforcement grill but including moduling, finishing watering curing and fixing in position etc., Complete as per std., Specifications.,
RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003 RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints. including cost and conveyance of all materials to site, loading and unloading charges and labour charges etc., complete as per standard specification
abi&cibicontractors&co (BID ID -1110804)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .