Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹18.0 LAccepted-AOC | ₹18.0 L | L-1 | Accepted-AOC PO AWARDED |
| 2 | L-2₹18.0 LRejected-Finance GOYLA PARA BARAKAR PASCHIM BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN WEST BENGAL 713324 | PASCHIM BARDHAMAN | WEST BENGAL | 713324 | ₹18.0 L | L-2 | Rejected-Finance QUOTED HIGHER THAN L-1 |
| 3 | L-3₹18.2 LRejected-Finance MANDIRIA BAZAR KULTI N BASAKAR PASCHIM BARDHAMAN PASCHIM WEST BURDWAN WEST BENGAL 711334 INDIA | KULTI | PASCHIM BARDHAMAN | WEST BENGAL | 711334 | ₹18.2 L | L-3 | Rejected-Finance QUOTED HIGHER THAN L-1 |
Tender Value
₹16.0 L
EMD Value
₹20,000
Closing Date
2 Mar 2026, 5:00 pmClosed
GM CV AREA
OFFICE OF GENERAL MANAGER CV AREA-XII
Construction of Mechanic Room, ENM Shed and Parking at Damagoria under C.V. Area
2026_BCCL_353421_1
BCCL/XII/ACE/ e-Tender-89/2025-26/435 Date-16.02.2026
Open Tender
Civil Works - Buildings
45 days
CV Area
Please refer to the tender document.
3 documents required · 3 mandatory
₹20,000
20 Mar 2026
18 Feb 2026
3 Mar 2026
18 Feb 2026
2 Mar 2026
19 Feb 2026
18 Feb 2026 - 23 Feb 2026
DISMANTLING AND DEMOLISHING Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet
DISMANTLING AND DEMOLISHING Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
REINFORCED CEMENT CONCRETE Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
REINFORCED CEMENT CONCRETE Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
B/W with flyash bricks in CM (1:6) in F/P
B/W with flyash bricks in CM (1:6) in S/S
REINFORCED CEMENT CONCRETE Providing, hcisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
REINFORCED CEMENT CONCRETE Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
REINFORCED CEMENT CONCRETE Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
REINFORCED CEMENT CONCRETE Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
REINFORCED CEMENT CONCRETE Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
REINFORCED CEMENT CONCRETE Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
ROOFING Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
STEEL WORK Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
ROOFING Extra for providing and fixing wind ties of 40x 6 mm flat iron section.
B/P/S (Bricks departmentally supplied)
STEEL WORK Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
FINISHING 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
FINISHING 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
FINISHING 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
FINISHING Colour washing such as green, blue or buff to give an even shade : New work (two or more coats) with a base coat of white washing with lime
FINISHING White washing with lime to give an even shade : New work (three or more coats)
FINISHING Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
ROAD WORK Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_366224.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid