Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 16 19 ATTAIAMAL NAGAR 1 KANNAKURICHY SALEM 636008 | SALEM | SALEM | TAMIL NADU | 636008 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
16 May 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM I Division Generator Maintenance S Dn V Annual Overhaul works of Generator and its auxiliaries in Unit I II III for the year 2023 24
2023_EB_310115_1
SE ES NCTPS I WC No 173 2022 23
Open Tender
Power/Energy Projects/Products
Works
365 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,200
Yes
25 May 2023
3 May 2023
17 May 2023
3 May 2023
16 May 2023
3 May 2023
Amount
Hydrogen Gas System Works Purging of H2 gas in TG casing.
conducting Air Tightness Test and attending minor leaks of H2 gas system.(Before purging & after filling H2 gas)
Filling of H2 gas in TG casing.
Drying out the stator winding by circulating hot air and puffing work.
Revisioning of hydrogen gas dryer (Both East dryer and West dryer)
Revisioning of Turbo Generator Bottom manhole cover & inside side covers and inspection & cleaning of inside casing bottom.
Brush Gear Assembly works Dismantling Brush Gear cable, removing the carbon brushes, Brush holders, releasing the brush gear assembly and cleaning the same
Re-fixing the Brush gear assembly, aligning the radial clearances, re-fixing the brush holders, carbon brushes and brush gear cable.
Stator Water System Works Dismantling lifting and loading the Polishing unit from 4.5mtr. area to DM Plant for regeneration of the resin, Dismantling of outlet flanges, Cleaning of the mesh and reassembling with new gaskets, and back to its original position including required material charges and hire charges for tools and plants.
Revisioning of Expansion Tank.
Complete cleaning of Expansion Tank Float Valve.
Revisioning of Stator water filter
Revisioning of Magnetic Filter
Stator Water pump and motor & stator water vacuum pump and motor alignment.
Seal Oil System Work Annual maintenance works in seal oil tank & filter Dismantling of top cover and inside fixtures in SOT, cleaning of the tank, checking the float valve assembly, refixing the inner fixtures and assembly of top cover, dismantling of filters, cleaning the simplex and duplex filter elements, reassembling the filters complete
Valves Overhauling Dismantling, Rectification, overhaul and reconnecting One number (25NB / 40NB /50NB) Globe valve/NRV.
Dismantling, Rectification, overhaul and reconnecting One number (80NB / 100NB) Globe valve/NRV.
Electrical Panel work Cleaning of all the modules with IPA, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, terminal tightness of all components, and refixing the modules in the respective panels.
consumables
GV ELLAIYAN CONTRACTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .