Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 56 ARUNACHALAM MAIN ROAD AMBAL NAGAR PORUR CHENNAI TAMIL NADU 600116 | THIRUVALLUR | TAMIL NADU | 600116 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹16,300
Closing Date
20 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM I division SD I Charges for Internal inspection Fault identification rectification due to rising trend of H2 gas levels replacement of existing worn out gaskets with new gaskets in HV turrets bushings LV
2021_EB_216461_1
CE SE ES NCTPS I WC No 110 2021 22
Open Tender
Power/Energy Projects/Products
Works
45 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,300
Yes
21 Dec 2021
7 Dec 2021
21 Dec 2021
7 Dec 2021
20 Dec 2021
7 Dec 2021
90 days
Amount
A. Internal inspection, fault identification / fault rectification due to rising trend of H2 gas levels. Charges for releasing and erection of 1 No 800 A / 1250A HV Bushings with new gaskets in Generator Transformer HV turrets.
Charges for Dismantling the LV turret, LV bushings, superficial cleaning of LV bushings and replacement of new gaskets and reassembling in GT
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in GT.
Overhauling of OLTC 250/50/25 MVA Generator / Station Transformer.
B. Draining & Refilling of oil, Nitrogen gas drying out, Vacuum Pulling and Hot oil circulation Charges for Draining of oil into 200 Lts. capacity empty barrels and shifting into convenient place. (82840 Litres) 82840 Ltrs.=414 empty barrels
Charges for Removing of old gaskets and providing new gaskets at Bucholz Relay (1 No), Neutral bushing (1 No.), PRV (2 Nos. & Manual / Inspection doors (4 Nos)
Charges for Dismantling and erection of oil circulating pump in single phase Generator Transformer
Nitrogen gas purge out with vacuum capping
Oil re-filling work from barrels to GT-3/ Main tank
Charges for Vacuum pulling, Oil filling and hot oil circulation (main tank, radiators & combined circulation ) up to reaching of parameters to the satisfactory level in GT.
Material cost for OLTC overhaul.
Material cost for drying out process such as ultra pure N2 gas, heater & suitable arrangements etc., including arrangement of vacuum pump
Buchholz relay (GOR-3)
Silica Gel Breathers
Neoprene Rubber Cork Sheet: 900x900x10mm
Neoprene Rubber Cork Sheet: 900x900x8mm
Neoprene Rubber Cork Sheet: 900x900x6mm
Crane Hire charges
Tools & Plants
SHRI MEENATCHI ENGINEERING
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .