| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹63.1 LAccepted-AOC | ₹63.1 L | 1 | Accepted-AOC y |
| 2 | 2₹63.7 L+₹63,050.09 (1.00%)Rejected-AOC | ₹63.7 L+₹63,050.09 (1.00%) | 2 | Rejected-AOC n |
| 3 | 3₹64.3 L+₹1.3 L (2.00%)Rejected-AOC | ₹64.3 L+₹1.3 L (2.00%) | 3 | Rejected-AOC n |
| 4 | Not Admitted-Fee/PreQual/Technical MAHARASHTRA | OSMANABAD | MAHARASHTRA | 413405 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹63.1 L
EMD Value
₹64,000
Closing Date
8 Jun 2026, 5:45 pmClosed
EE ZP Nandurbar
EE ZP Nandurbar
Improvement of Toranmal to Yashvant Talav Road (N.P.) Tal Dhadgaon Dist Nandurbar
2026_NANDU_1305738_15
2026_NANDU_ETN-3/2026-27
Open Tender
Civil Works
Percentage
120 days
Nandurbar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹64,000
10 Jul 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 364.5 | One Square Meter | 7.55 | ₹2,751.98 |
| 2 | Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed | 116.64 | One Cubic Meter | 149.98 | ₹17,493.67 |
| 3 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete | 81 | One Cubic Meter | 721.59 | ₹58,448.79 |
| 4 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 81 | One Cubic Meter | 85.24 | ₹6,904.44 |
| 5 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | 2,916 | One Square Meter | 316.73 | ₹9,23,584.68 |
| 6 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | 2,700 | One Square Meter | 244.83 | ₹6,61,041 |
| 7 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 2,700 | One Square Meter | 25.33 | ₹68,391 |
| 8 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | 2,700 | One Square Meter | 108.5 | ₹2,92,950 |
| 9 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( By Mechanical Means ) | 290.03 | One Cubic Meter | 97.11 | ₹28,164.81 |
| 10 | Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate | 131.97 | One Cubic Meter | 308.59 | ₹40,724.62 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_2241260.xls
BOQ • 0.29 MB
B11.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .