Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance GURDASPUR | GURDASPUR | GURDASPUR | PUNJAB | ₹2.0 Cr | L1 | Accepted-Finance Admitted |
| 2 | L2₹2.0 Cr+₹6.3 L (3.20%)Accepted-Finance | ₹2.0 Cr+₹6.3 L (3.20%) | L2 | Accepted-Finance Admitted |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
16 Mar 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer, Cont Divn PWD Batala
Construction of PHC (24x7_single Story at Bhullar (Batala) District Gurdaspur (Punjab)
2026_CEPW_162810_1
11dt06032026
Open Tender
Civil Works - Buildings
Percentage
180 days
Batala
Construction of PHC (24x7_single Story at Bhullar (Batala) District Gurdaspur (Punjab)
2 documents required · 2 mandatory
₹20,000
₹4.3 L
Yes
20 Mar 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of PHC building (Single Storey) having provision of foundation G+1 Storey Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 826.95 | Cum. | 102.19 | ₹84,506.02 |
| - | Cement concrete 1:5:10 with 40 mm gauge stone ballast. using concrete mixing volumetric type | 82.7 | Cum. | 4,020.5 | ₹3,32,495.35 |
| - | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 8.21 | Cum | 6,083.08 | ₹49,942.09 |
| - | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 136.37 | sqm | 221.24 | ₹30,170.5 |
| - | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | - | - | - | - |
| - | Beams | 10.04 | Cum | 6,873.2 | ₹69,006.93 |
| - | Slab | 107.9 | Cum | 6,873.2 | ₹7,41,618.28 |
| - | Door Lintels | 15.51 | Cum | 6,873.2 | ₹1,06,603.33 |
| - | Shelves | 1.01 | Cum | 6,873.2 | ₹6,941.93 |
| - | Centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 898.51 | Sqm | 560.46 | ₹5,03,578.91 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
SBD_Bhullar_Final.pdf
Tender Documents • 1.71 MB
others_compressed.pdf
Additional Documents • 17.75 MB
BOQ_329934.xls
BOQ • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .