Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹4,290
Closing Date
16 Sept 2026, 3:00 pmDue tomorrow
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
C/o Bathroom near Aganwadi Center and Mohd Maqbool at Tikker
2026_RDPR_323946_29
NIT NO 112 OF 2026-27 ADF CDF GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹4,290
9 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
9 Sept 2026 - 9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 7.04 | cum | 479.3 | ₹3,374.27 |
| 2 | P/l of stone soling / RBM including all carriages. | 0.86 | cum | 900 | ₹774 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate. | 1.76 | cum | 5,733.6 | ₹10,091.14 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.1 | cum | 7,571.6 | ₹38,615.16 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 3.12 | cum | 1,455.65 | ₹4,541.63 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.85 | cum | 7,104.35 | ₹6,038.7 |
| 7 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level TMTbars | 90 | kg | 115.35 | ₹10,381.5 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended Floors | 5.67 | sqm | 718.2 | ₹4,072.19 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls | 7.81 | sqm | 286.35 | ₹2,236.39 |
| 10 | 12mm Plaster in 1:6 mix | 18.96 | sqm | 266.2 | ₹5,047.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1091881.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .