Tender Value
₹24.9 L
EMD Value
₹49,852
Closing Date
9 Jul 2026, 2:00 pm4d left
ama zp deoria
civil lines road zila panchayat office deoria
Bhawan sankhya 28 ke antrik sanrachana me sudhar karya o anya nirman karya
2026_UPPRD_1164574_11
283/zp/deoria/27-06-2026
Open Tender
Civil Works
120 days
Deoria
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
ama zp deoria
₹49,852
29 Jun 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 85.8 | CUM | 191.12 | ₹16,398.1 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 21.05 | CUM | 1,560.96 | ₹32,858.21 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from
natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 21.55 | CUM | 5,006.82 | ₹1,07,896.97 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 7.13 | CUM | 6,648.63 | ₹47,404.73 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.71 | CUM | 7,976.92 | ₹37,555.34 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roof shaving slope up to 15° landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 20.29 | CUM | 8,456.54 | ₹1,71,540.91 |
| 7 | First class brick work in 1:6 cement and sand mortar including cost of all material labour and T&P etc. required for proper completion of work. all work up to plinth level. | 17.06 | CUM | 5,242.2 | ₹89,442.42 |
| 8 | First class brick work in 1:6 cement and sand mortar including cost of all material labour and T&P etc. required for proper completion of work. all work above plinth level. | 51.36 | CUM | 6,692.87 | ₹3,43,732.42 |
| 9 | Providing and laying Cement plaster 12mm thick in cement mortar 1:6 incl. curing and smooth finishing and cost of all materials labour and T&P etc.required for proper completion of work. (inner side) | 426.98 | sqm | 281.51 | ₹1,20,199.14 |
| 10 | 6 mm cement plaster of mix : 13.16.1 1:3 (1 cement : 3 fine sand) | 152.85 | sqm | 220.83 | ₹33,753.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_2183814.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid