Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance 8 3 110 EDAPPADI KARUPATTI SALEM | SALEM | SALEM | TAMIL NADU | L1 | Admitted-Finance | |
| 2 | L2₹2.2 L+₹14,101.82 (6.75%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P THANGAVEL L1 | VPS Contractor L2 |
|---|---|---|---|---|---|
| 1.00Pot holes repair from Magudanchavadi BT road to (Natha kattur bus stop)Mattampatti BT road via Kollankadu H/O Erumaipatti | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 1,602 | sqm | 6 ₹9,612 Lowest | 10 ₹16,020 |
| 3.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal KM-0/0-1/0 | 8 | cum | 4,153 ₹33,224 Lowest | 4,200 ₹33,600 |
| 4.00 | KM-1/0-1/100 | 0.06 | m2 | 4,162 ₹249.72 Lowest | 4,200 ₹252 |
| 5.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 213.6 | m2 | 341 ₹72,837.6 Lowest | 350 ₹74,760 |
| 6.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal KM-0/0-1/0 | 0.97 | cum | 4,836 ₹4,690.92 Lowest | 4,900 ₹4,753 |
| 7.00 | KM-1/0-1/100 | 0.03 | cum | 4,845 ₹145.35 Lowest | 4,900 ₹147 |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1.65 | cum | 2,829 ₹4,667.85 Lowest | 2,900 ₹4,785 |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 16.5 | sqm | 19 ₹313.5 Lowest | 25 ₹412.5 |
| 10.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 16.5 | sqm | 83 ₹1,369.5 Lowest | 90 ₹1,485 |
Tender Value
₹2.1 L
EMD Value
₹2,130
Closing Date
7 Nov 2025, 3:00 pmClosed
Block Development Officer
Konganapuram
Potholes Repairs From Magudanchavadi BT Road to (Nathakattur Busstop) Kollangkadu via Mattampatti BT Road Km 0/0 - 1/780 In Erumaipatti Panchayat Konganapuram Block Work No 03
2025_RDTN_618643_1
ROC No. 2120/2025/A2
Open Tender
Civil Works
Item Rate
90 days
Konganapuram
Potholes Repairs From Magudanchavadi BT Road to (Nathakattur Busstop) Kollangkadu via Mattampatti BT Road Km 0/0 - 1/780 In Erumaipatti Panchayat Konganapuram Block Work No 03
2 documents required · 2 mandatory
₹0
₹2,130
Yes
8 Nov 2025
31 Oct 2025
7 Nov 2025
31 Oct 2025
7 Nov 2025
31 Oct 2025
31 Oct 2025 - 7 Nov 2025
Pot holes repair from Magudanchavadi BT road to (Natha kattur bus stop)Mattampatti BT road via Kollankadu H/O Erumaipatti
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal KM-0/0-1/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal KM-0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by b
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Kilometre stone
Provision for Hectametre stone
Provision for Nameboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
03.pdf
Tender Documents • 0.66 MB
BOQ_739610.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .