Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
25 Apr 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SANDEEP SINGH CH.MANAGER
POWERGRID CORPORATION OF INDIA LIMITED FARIDABAD, SECTOR-16A
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
NR1/NT/W-CIVIL/DOM/I00/25/03566
Open
Civil Works - Buildings
Works
765/400 kV Jatikara Substation
₹25,000
₹5 L
26 Mar 2025
26 Mar 2025
29 Apr 2025
26 Mar 2025
25 Apr 2025
26 Mar 2025
11 Apr 2025
Package Name Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Package Code Substation Packages SS63 -Part A1 & B1
Specification No. NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-4, Sch-7 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-4b (Maintenance Charges during and after Defect Liability Period) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Sole Bidder 1 Sole Bidder 1
Joint Venture 2 or More JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] 0 2 0 0 2 0
Name of Lead Partner …….. …….. …….. …….. …….. ……..
Address of Sole Bidder …….. …….. …….. …….. …….. ……..
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 1 Direct Total 0 0 `
BO Total #REF! 0
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARES PARTS) TO BE SUPPLIED, INCLUDING TYPE TEST CHARGES FOR TESTS TO BE CONDUCTED Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘ 6 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST Tax as confirmed by Bidder
1 7000016517 20 GANTRY STRCUTURES 18 M Included 0.00 0 0.00
2 7000016517 30 GANTRY STRCUTURES 18 EA Included 0.00 0 0.00
3 7000016517 40 GANTRY STRCUTURES 18 EA Included 0.00 0 0.00
4 7000016517 50 GANTRY STRCUTURES 18 EA Included 0.00 0 0.00
5 7000016517 70 Tele BoQ at Fatehgarh-3 (Extn) 18 EA Included 0.00 0 0.00
6 7000016517 80 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
7 7000016517 90 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
8 7000016517 100 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
9 7000016517 110 Tele BoQ at Fatehgarh-3 (Extn) NOT APPLICABLE 0.00 0 0.00
10 7000016517 120 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
11 7000016517 130 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
12 7000016517 140 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
13 7000016517 150 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
14 7000016517 160 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
15 7000016517 170 Tele BoQ at Fatehgarh-3 (Extn) 0.00 0 0.00
16 7000016517 180 Tele BoQ at Fatehgarh-3 (Extn) 18 SET Included 0.00 0 0.00
17 7000016517 200 Spares- Tele BoQ at Fatehgarh-3 0.00 0 0.00
18 7000016517 210 Spares- Tele BoQ at Fatehgarh-3 18 Nos Included 0.00 0 0.00
19 7000016517 220 Spares- Tele BoQ at Fatehgarh-3 18 0.00 0 0.00
20 7000016517 230 Spares- Tele BoQ at Fatehgarh-3 18 SET Included 0.00 0 0.00
21 7000016517 240 Spares- Tele BoQ at Fatehgarh-3 0.00 0 0.00
22 7000016517 250 Spares- Tele BoQ at Fatehgarh-3 18 Nos Included 0.00 0 0.00
23 7000016517 260 Spares- Tele BoQ at Fatehgarh-3 18 No. Included 0.00 0 0.00
24 7000016517 270 Spares- Tele BoQ at Fatehgarh-3 0.00 0 0.00
25 7000016517 280 Spares- Tele BoQ at Fatehgarh-3 18 Nos. Included 0.00 0 0.00
26 7000016517 290 Spares- Tele BoQ at Fatehgarh-3 18 Nos. Included 0.00 0 0.00
27 7000016517 300 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
28 7000016517 310 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
29 7000016517 320 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
30 7000016517 330 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
31 7000016517 340 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
32 7000016517 350 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
33 7000016517 370 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
34 7000016517 380 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
35 7000016517 390 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
36 7000016517 400 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
37 7000016517 420 420kV SHUNT REACTOR 18 kg Included 0.00 0 0.00
38 7000016517 430 420kV SHUNT REACTOR 18 TOTAL Included 0.00 0 0.00
39 7000016517 440 800kV 50kA AIS EQUIPMENT 18 Freight and Insurance Included 0.00 0 0.00
40 7000016517 450 800kV 50kA AIS EQUIPMENT 18 Installation Portion: Included 0.00 0 0.00
41 7000016517 460 800kV 50kA AIS EQUIPMENT 18 ELECTRICAL/STRUCTURAL WORKS Included 0.00 0 0.00
42 7000016517 470 800kV 50kA AIS EQUIPMENT 18 245 kV 1600A, 50KA Circuit Breakers (3-Phase) with support EA 2 Included 0.00 0 0.00
43 7000016517 480 800kV 50kA AIS EQUIPMENT 18 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 6 Included 0.00 0 0.00
44 7000016517 490 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Tandem Isolator without E/S EA 4 Included 0.00 0 0.00
45 7000016517 500 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 2 Included 0.00 0 0.00
46 7000016517 510 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 2 Included 0.00 0 0.00
47 7000016517 520 800kV 50kA AIS EQUIPMENT 18 245 kV,1 phase Bus Post Insulator (except for Line Traps) EA 22 Included 0.00 0 0.00
48 7000016517 530 800kV 50kA AIS EQUIPMENT 18 216kV Surge Arrester (1-phase) EA 6 Included 0.00 0 0.00
49 7000016517 540 800kV 50kA AIS EQUIPMENT 18 245 kV, 4400pf Capacitive Voltage Transformer (1- Phase) EA 6 Included 0.00 0 0.00
50 7000016517 550 420kV, 63kA AIS EQUIPMENT 18 220kV Line Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
51 7000016517 560 420kV, 63kA AIS EQUIPMENT 18 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 2 Included 0.00 0 0.00
52 7000016517 570 420kV, 63kA AIS EQUIPMENT 18 Augmentation of Substation automation System for 220kV bay as per Technical - Included 0.00 0 0.00
53 7000016517 580 420kV, 63kA AIS EQUIPMENT 18 Laying of optical cables in GI Pipe/Conduit upto 50MM diameter in cable trench Mtr. 500 Included 0.00 0 0.00
54 7000016517 590 420kV, 63kA AIS EQUIPMENT 18 Splicing of optical Fibre cable joints Single Mode/Multi Mode Fiber Each 50 Included 0.00 0 0.00
55 7000016517 600 420kV, 63kA AIS EQUIPMENT 18 Erection Hardware for 220kV layout (Double Main and Transfer Scheme as per SLD)-Line Bay as per specification SET 2 Included 0.00 0 0.00
56 7000016517 610 420kV, 63kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase CT including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
57 7000016517 620 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase High BPI including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts EA 6 Included 0.00 0 0.00
58 7000016517 630 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase BPI including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 16 Included 0.00 0 0.00
59 7000016517 640 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase SA including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
60 7000016517 650 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 3-Phase ISOLATOR including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts EA 8 Included 0.00 0 0.00
61 7000016517 660 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase CVT including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
62 7000016517 670 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1 - PH BPI for WT including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts SET 4 Included 0.00 0 0.00
63 7000016517 680 245kV, 50kA AIS EQUIPMENT 18 Air conditioning system for Switchyard Panel Room of 6m length SET 1 Included 0.00 0 0.00
64 7000016517 690 36kV AIS EQUIPMENT 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 m length SET 1 Included 0.00 0 0.00
65 7000016517 700 36kV AIS EQUIPMENT 18 Lighting Fixture LED Luminaires type FL2 as per tech. specifications EA 20 Included 0.00 0 0.00
66 7000016517 710 Erection Hardware for 765 kV S/Y 18 Lighting Panel type ACP-2 as per technical specification EA 1 Included 0.00 0 0.00
67 7000016517 720 Erection Hardware for 765 kV S/Y 18 Illumination System for switchyard panel room of 6 m length SET 1 Included 0.00 0 0.00
68 7000016517 730 Erection Hardware for 765 kV S/Y 18 Laying of POWER & control cables in Cable trenched including Glanding, Lug, ferrule, Cable Tag etc. Included 0.00 0 0.00
69 7000016517 740 Erection Hardware for 765 kV S/Y 18 1.1kV grade 3.5Cx70 sqmm (PVC) Power Cable KM 5 Included 0.00 0 0.00
70 7000016517 750 Erection Hardware for 765 kV S/Y 18 1.1kV grade 3.5Cx35 sqmm (PVC) Power Cable KM 2 Included 0.00 0 0.00
71 7000016517 760 Erection Hardware for 765 kV S/Y 18 1.1kV grade 4Cx16 sqmm (PVC) Power Cable KM 3 Included 0.00 0 0.00
72 7000016517 770 Erection Hardware for 765 kV S/Y 18 1.1kV grade 4Cx6 sqmm (PVC) Power Cable KM 4 Included 0.00 0 0.00
73 7000016517 780 765kV Insulator and Hardware 18 1.1kV grade 2Cx6 sqmm (PVC) Power Cable KM 5 Included 0.00 0 0.00
74 7000016517 790 765kV Insulator and Hardware 18 1.1kV grade 3Cx2.5 sqmm Control Cable KM 7 Included 0.00 0 0.00
75 7000016517 800 765kV Insulator and Hardware 18 1.1kV grade 5Cx2.5 sqmm Control Cable KM 3 Included 0.00 0 0.00
76 7000016517 810 765kV Insulator and Hardware 18 1.1kV grade 7Cx2.5 sqmm Control Cable KM 2 Included 0.00 0 0.00
77 7000016517 820 765kV Insulator and Hardware 18 1.1kV grade 10Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
78 7000016517 830 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 14Cx2.5 sqmm Control Cable KM 3 Included 0.00 0 0.00
79 7000016517 840 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 19Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
80 7000016517 850 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 27Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
81 7000016517 860 Erection Hardware for 420 kV I Type S/Y 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings, accessories etc.: 24 Fibre KM 1 Included 0.00 0 0.00
82 7000016517 870 Erection Hardware for 420 kV I Type S/Y 18 220kV, 1600A, 0.5mH, 40 kA Line Trap EA 4 Included 0.00 0 0.00
83 7000016517 880 420kV Insulator and Hardware 18 245 kV ,1 phase Bus Post Insulators for Line Traps EA 12 Included 0.00 0 0.00
84 7000016517 890 420kV Insulator and Hardware 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included 0.00 0 0.00
85 7000016517 900 420kV Insulator and Hardware 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 24 Included 0.00 0 0.00
86 7000016517 910 Erection Hardware for 220 kV DMT Type S 18 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3 Included 0.00 0 0.00
87 7000016517 920 220kV Insulator and Hardware 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 18 Included 0.00 0 0.00
88 7000016517 930 220kV Insulator and Hardware 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 18 Included 0.00 0 0.00
89 7000016517 940 220kV Insulator and Hardware 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9 Included 0.00 0 0.00
90 7000016517 950 Earthmat 18 40 MM MS ROD FOR MAIN EARTHMAT KM 48 Included 0.00 0 0.00
91 7000016517 960 CSD 18 Controlled Switching Device for 420 kV, 3-ph Circuit Breaker EA 9 Included 0.00 0 0.00
92 7000016517 970 CSD 18 Controlled Switching Device for 765 kV, 3-ph Circuit Breaker EA 9 Included 0.00 0 0.00
93 7000016517 980 CRP for 765kV Bays 18 765 kV Circuit Breaker Relay Panel With Auto Reclose (with Automation) EA 11 Included 0.00 0 0.00
94 7000016517 990 CRP for 765kV Bays 18 765kV Line Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
95 7000016517 1000 CRP for 765kV Bays 18 765kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included 0.00 0 0.00
96 7000016517 1010 CRP for 765kV Bays 18 765kV Reactor Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
97 7000016517 1020 CRP for 765kV Bays 18 765kV Bus Bar Protection Panel (Duplicate)-(with Automation) SET 1 Included 0.00 0 0.00
98 7000016517 1030 CRP for 420kV Bays with SAS 18 400kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 12 Included 0.00 0 0.00
99 7000016517 1040 CRP for 420kV Bays with SAS 18 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included 0.00 0 0.00
100 7000016517 1050 CRP for 420kV Bays with SAS 18 400kV Reactor Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
101 7000016517 1060 CRP for 420kV Bays with SAS 18 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included 0.00 0 0.00
102 7000016517 1070 CRP for 220kV Bays with SAS 18 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 3 Included 0.00 0 0.00
103 7000016517 1080 CRP for 220kV Bays with SAS 18 Augmentation of existing 220kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included 0.00 0 0.00
104 7000016517 1090 SAS-AUG 18 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 3 Included 0.00 0 0.00
105 7000016517 1100 SAS-AUG 18 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 4 Included 0.00 0 0.00
106 7000016517 1110 SAS-AUG 18 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 8 Included 0.00 0 0.00
107 7000016517 1120 SAS-AUG 18 Augmentation of Substation automation System for 765kV Tie bay as perTechnical Specification EA 4 Included 0.00 0 0.00
108 7000016517 1130 SAS-AUG 18 Augmentation of Substation automation system for 765kV Main bay as perTechnical Specification EA 7 Included 0.00 0 0.00
109 7000016517 1140 VMS 18 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1 Included 0.00 0 0.00
110 7000016517 1150 PLCC Equipment 18 765kV,3150A,1.0mH , 50kA Line Trap EA 4 Included 0.00 0 0.00
111 7000016517 1160 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX300 SQMM (XLPE) POWER CABLE KM 2 Included 0.00 0 0.00
112 7000016517 1170 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 6 Included 0.00 0 0.00
113 7000016517 1180 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 2 Included 0.00 0 0.00
114 7000016517 1190 POWER & CONTROL CABLE 18 1.1KV GRADE 4CX16 SQMM (PVC) POWER CABLE KM 2 Included 0.00 0 0.00
115 7000016517 1200 POWER & CONTROL CABLE 18 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 20 Included 0.00 0 0.00
116 7000016517 1210 POWER & CONTROL CABLE 18 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 14 Included 0.00 0 0.00
117 7000016517 1220 POWER & CONTROL CABLE 18 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 40 Included 0.00 0 0.00
118 7000016517 1230 POWER & CONTROL CABLE 18 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 68 Included 0.00 0 0.00
119 7000016517 1240 POWER & CONTROL CABLE 18 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 31 Included 0.00 0 0.00
120 7000016517 1250 POWER & CONTROL CABLE 18 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 29 Included 0.00 0 0.00
121 7000016517 1260 POWER & CONTROL CABLE 18 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 7 Included 0.00 0 0.00
122 7000016517 1270 POWER & CONTROL CABLE 18 4PAIR, 0.5SQMM SCREENED CABLE KM 11 Included 0.00 0 0.00
123 7000016517 1280 AIR CONDITIONING & VENTILATION SYSTEM 28 Air conditioning system for Switchyard Panel Room of 6m length SET 5 Included 0.00 0 0.00
124 7000016517 1290 AIR CONDITIONING & VENTILATION SYSTEM 28 Air conditioning system for Switchyard Panel Room of 9m length SET 4 Included 0.00 0 0.00
125 7000016517 1300 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500 MVA,(765/v3)/(400/v3)/(33) kV, 1 -phase Autotransformer SET 10 Included 0.00 0 0.00
126 7000016517 1310 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 110 MVAR, 765/√3 kVsingle phase Shunt Reactor SET 7 Included 0.00 0 0.00
127 7000016517 1320 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500MVA , 400KV/220/33kV, 3-phase Autotransformer SET 3 Included 0.00 0 0.00
128 7000016517 1330 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 125 MVAR, 420kV, 3 phaseBus Reactor SET 2 Included 0.00 0 0.00
129 7000016517 1340 FIRE FIGHTING SYSTEM 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 4 Included 0.00 0 0.00
130 7000016517 1350 FIRE FIGHTING SYSTEM 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 5 Included 0.00 0 0.00
131 7000016517 1360 FIRE FIGHTING SYSTEM 18 4.5 kg CO2 type Portable Fire extinguisher EA 9 Included 0.00 0 0.00
132 7000016517 1370 ILLUMINATION SYSTEM 18 Lighting Panel type ACP-2 as per technical specification EA 6 Included 0.00 0 0.00
133 7000016517 1380 ILLUMINATION SYSTEM 18 Outdoor Power Receptacle for oilfiltration unit (250A) EA 4 Included 0.00 0 0.00
134 7000016517 1390 ILLUMINATION SYSTEM 18 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 50 Included 0.00 0 0.00
135 7000016517 1400 ILLUMINATION SYSTEM 18 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 40 Included 0.00 0 0.00
136 7000016517 1410 ILLUMINATION SYSTEM 18 Illumination System for switchyard panel room of 6 m length LS 5 Included 0.00 0 0.00
137 7000016517 1420 ILLUMINATION SYSTEM 18 Illumination System for switchyard panel room of 9 m length LS 4 Included 0.00 0 0.00
138 7000016517 1430 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV WT (1PH) EA 4 Included 0.00 0 0.00
139 7000016517 1440 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV BPI (1PH) EA 63 Included 0.00 0 0.00
140 7000016517 1450 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CVT (1PH) EA 12 Included 0.00 0 0.00
141 7000016517 1460 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CT (1PH) EA 33 Included 0.00 0 0.00
142 7000016517 1470 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CLASS SA (1PH) EA 23 Included 0.00 0 0.00
143 7000016517 1480 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (1PH) EA 45 Included 0.00 0 0.00
144 7000016517 1490 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (3PH) EA 25 Included 0.00 0 0.00
145 7000016517 1500 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29 Included 0.00 0 0.00
146 7000016517 1510 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (1PH) EA 18 Included 0.00 0 0.00
147 7000016517 1520 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 31 Included 0.00 0 0.00
148 7000016517 1530 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV HBPI (1PH) EA 36 Included 0.00 0 0.00
149 7000016517 1540 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 36 Included 0.00 0 0.00
150 7000016517 1550 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15 Included 0.00 0 0.00
151 7000016517 1560 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS HIGH LEVELSA (1PH) EA 10 Included 0.00 0 0.00
152 7000016517 1570 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) EA 9 Included 0.00 0 0.00
153 7000016517 1580 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 32 Included 0.00 0 0.00
154 7000016517 1590 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 9 Included 0.00 0 0.00
155 7000016517 1600 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 12 Included 0.00 0 0.00
156 7000016517 1610 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 9 Included 0.00 0 0.00
157 7000016517 1620 Mandatory Spare LOT 18 Spare-765KV Circuit Breaker LOT 1 Included 0.00 0 0.00
158 7000016517 1630 Mandatory Spare LOT 18 Spare-765kV VKDB Isolator LOT 1 Included 0.00 0 0.00
159 7000016517 1640 Mandatory Spare LOT 18 SPARE-765KV CURRENT TRANSFORMER LOT 1 Included 0.00 0 0.00
160 7000016517 1650 Mandatory Spare LOT 18 SPARE-765KV CAPACITIVE VOLTAGE TRANSFORMER LOT 1 Included 0.00 0 0.00
161 7000016517 1660 Mandatory Spare LOT 18 SPARES FOR 624KV SURGE ARRESTER LS 1 Included 0.00 0 0.00
162 7000016517 1670 Mandatory Spare LOT 18 Spare For 400kV Bus Reactor LS 1 Included 0.00 0 0.00
163 7000016517 1680 Mandatory Spare LOT 18 Spares for 420kV Circuit Breaker LS 1 Included 0.00 0 0.00
164 7000016517 1690 Mandatory Spare LOT 18 Spares for 420kV Double break Isolator LS 1 Included 0.00 0 0.00
165 7000016517 1700 Mandatory Spare LOT 18 SPARES FOR 336KV SURGE ARRESTER LS 1 Included 0.00 0 0.00
166 7000016517 1710 Mandatory Spare LOT 18 Spare-420kV BPI SET 1 Included 0.00 0 0.00
167 7000016517 1720 Mandatory Spare LOT 18 Spare-420kV CT 1 SET 1 Included 0.00 0 0.00
168 7000016517 1730 Mandatory Spare LOT 18 Spare-245kV Circuit Breaker SET 1 Included 0.00 0 0.00
169 7000016517 1740 Mandatory Spare LOT 18 Spare-245kV Isolator SET 1 Included 0.00 0 0.00
170 7000016517 1750 Mandatory Spare LOT 18 Spare-245kV CT SET 1 Included 0.00 0 0.00
171 7000016517 1760 Mandatory Spare LOT 18 Spare-245kV BPI SET 1 Included 0.00 0 0.00
172 7000016517 1770 Mandatory Spare LOT 18 Relay & protection Panels (with automation) LS 1 Included 0.00 0 0.00
173 7000016517 1780 Mandatory Spare LOT 18 Spares-Substation Automation System LS 1 Included 0.00 0 0.00
174 7000016517 1790 Mandatory Spare LOT 18 SPARES FOR CLAMPS & CONNECTORS LOT 1 Included 0.00 0 0.00
175 7000016517 1800 Mandatory Spare LOT 18 Spares for Fire Protection System LS 1 Included 0.00 0 0.00
176 7000016517 1810 Mandatory Spare LOT 18 Spare-216kV Surge Arrester SET 1 Included 0.00 0 0.00
177 7000016517 1820 Mandatory Spare LOT 18 SPARE-800KV BUS POST INSULATOR LOT 1 Included 0.00 0 0.00
Total Ex-works Price 0.00 0.00 0.00
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 1 Direct Total 0 0 `
BO Total #REF! 0
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF! #REF! #REF!
Total Ex-works Price including Type Test charges #REF! #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 2 Dis
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-2 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 2
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
LOCAL TRANSPORTATION, IN-TRANSIT INSURANCE, LOADING AND UNLOADING
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code S.No. Description Unit Quantity Unit Freight, In-transit Insurance, loading & unloading Charges Total Freight, In-transit Insurance, loading & unloading Charges
1 7000016517 20 GANTRY STRCUTURES 1000011713 1 M Included
2 7000016517 30 GANTRY STRCUTURES 1000012373 2 EA Included
3 7000016517 40 GANTRY STRCUTURES 1000015953 3 EA Included
4 7000016517 50 GANTRY STRCUTURES 1000015954 4 EA Included
5 7000016517 70 Tele BoQ at Fatehgarh-3 (Extn) 1000031367 5 EA Included
6 7000016517 80 Tele BoQ at Fatehgarh-3 (Extn) 1000031405 6 M Included
7 7000016517 90 Tele BoQ at Fatehgarh-3 (Extn) 1000018706 7 M Included
8 7000016517 100 Tele BoQ at Fatehgarh-3 (Extn) 1000031374 8 M Included
9 7000016517 110 Tele BoQ at Fatehgarh-3 (Extn) 1000034950 9 NOT APPLICABLE
10 7000016517 120 Tele BoQ at Fatehgarh-3 (Extn) 1000031381 10 M Included
11 7000016517 130 Tele BoQ at Fatehgarh-3 (Extn) 1000026228 11 M Included
12 7000016517 140 Tele BoQ at Fatehgarh-3 (Extn) 1000028495 12 M Included
13 7000016517 150 Tele BoQ at Fatehgarh-3 (Extn) 1000028265 13 M Included
14 7000016517 160 Tele BoQ at Fatehgarh-3 (Extn) 1000034998 14 M Included
15 7000016517 170 Tele BoQ at Fatehgarh-3 (Extn) 1000030942 15
16 7000016517 180 Tele BoQ at Fatehgarh-3 (Extn) 1000023471 16 SET Included
17 7000016517 200 Spares- Tele BoQ at Fatehgarh-3 1000031369 17
18 7000016517 210 Spares- Tele BoQ at Fatehgarh-3 1000018706 18 Nos Included
19 7000016517 220 Spares- Tele BoQ at Fatehgarh-3 1000031405 19
20 7000016517 230 Spares- Tele BoQ at Fatehgarh-3 1000031374 20 SET Included
21 7000016517 240 Spares- Tele BoQ at Fatehgarh-3 1000034950 21
22 7000016517 250 Spares- Tele BoQ at Fatehgarh-3 1000031381 22 Nos Included
23 7000016517 260 Spares- Tele BoQ at Fatehgarh-3 1000034998 23 No. Included
24 7000016517 270 Spares- Tele BoQ at Fatehgarh-3 1000031398 24
25 7000016517 280 Spares- Tele BoQ at Fatehgarh-3 1000030942 25 Nos. Included
26 7000016517 290 Spares- Tele BoQ at Fatehgarh-3 1000023469 26 Nos. Included
27 7000016517 300 Rep ( Fatehgarh-3 - Beawer ) 1000031367 27 Nos. Included
28 7000016517 310 Rep ( Fatehgarh-3 - Beawer ) 1000031405 28 Nos. Included
29 7000016517 320 Rep ( Fatehgarh-3 - Beawer ) 1000026228 29 Nos. Included
30 7000016517 330 Rep ( Fatehgarh-3 - Beawer ) 1000023469 30 Nos. Included
31 7000016517 340 Rep ( Fatehgarh-3 - Beawer ) 1000023471 31 Nos. Included
32 7000016517 350 Rep ( Fatehgarh-3 - Beawer ) 1000031403 32 Nos. Included
33 7000016517 370 PMU BoQ supply 1000017518 33 Nos. Included
34 7000016517 380 PMU BoQ supply 1000022512 34 Nos. Included
35 7000016517 390 PMU BoQ supply 1000022510 35 Nos. Included
36 7000016517 400 PMU BoQ supply 1000022487 36 Nos. Included
37 7000016517 420 420kV SHUNT REACTOR 1000000705 37 kg Included
38 7000016517 430 420kV SHUNT REACTOR 1000013947 Insulating Oil for 125 MVAR, 420kV 3-phase Bus Reactor SET 2 Included
39 7000016517 440 800kV 50kA AIS EQUIPMENT 1000005827 765kV, 3150A, 50kA Circuit Breaker(3-Phase) with closing resistor (withsupport structure) EA 4 Included
40 7000016517 450 800kV 50kA AIS EQUIPMENT 1000005826 765kV, 3150A, 50kA Circuit Breaker(3-Phase) without closing resistor(with support structure) EA 7 Included
41 7000016517 460 800kV 50kA AIS EQUIPMENT 1000005848 765 kV, 3000A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 33 Included
42 7000016517 470 800kV 50kA AIS EQUIPMENT 1000005840 765 kV,8800 pF Capacitive Voltage Transformer (1-Phase) EA 12 Included
43 7000016517 480 800kV 50kA AIS EQUIPMENT 1000005853 765kV, 3150A, 50Ka, Vertical Knee/DoubleBreak Isolator (3-Phase) with one E/S EA 15 Included
44 7000016517 490 800kV 50kA AIS EQUIPMENT 1000005854 765kV, 3150A, 50Ka, Vertical Knee/DoubleBreak Isolator (3-Phase) with two E/S EA 10 Included
45 7000016517 500 800kV 50kA AIS EQUIPMENT 1000005820 765kV, 3150A, 50kA, Vertical Knee/DoubleBreak Isolator (1-Phase) with one E/S EA 17 Included
46 7000016517 510 800kV 50kA AIS EQUIPMENT 1000005819 765kV, 3150A, 50kA, Vertical Knee/DoubleBreak Isolator (1-Phase) without E/S EA 10 Included
47 7000016517 520 800kV 50kA AIS EQUIPMENT 1000020421 624kV Surge Arrester (1-Phase) EA 23 Included
48 7000016517 530 800kV 50kA AIS EQUIPMENT 1000005791 765 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 63 Included
49 7000016517 540 800kV 50kA AIS EQUIPMENT 1000005790 765 kV ,1 phase Bus Post Insulators for Line Traps EA 12 Included
50 7000016517 550 420kV, 63kA AIS EQUIPMENT 1000004401 420 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 31 Included
51 7000016517 560 420kV, 63kA AIS EQUIPMENT 1000020419 336kV Surge Arrester (1-phase) EA 25 Included
52 7000016517 570 420kV, 63kA AIS EQUIPMENT 1000004495 420kV, 3150A, 63KA, Isolator (1 phase)(Double Break) without E/S EA 8 Included
53 7000016517 580 420kV, 63kA AIS EQUIPMENT 1000004496 420kV, 3150A, 63KA, Isolator (1 phase)(Double Break) with one E/S EA 10 Included
54 7000016517 590 420kV, 63kA AIS EQUIPMENT 1000004498 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 29 Included
55 7000016517 600 420kV, 63kA AIS EQUIPMENT 1000004463 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 36 Included
56 7000016517 610 420kV, 63kA AIS EQUIPMENT 1000004501 420kV, 3150A, 63kA Circuit Breaker (3-Phase) without closing resistorand with Support Structure EA 12 Included
57 7000016517 620 245kV, 50kA AIS EQUIPMENT 1000001683 245kV, 1600A, 50KA Circuit Breaker(3-Phase) with support structure EA 3 Included
58 7000016517 630 245kV, 50kA AIS EQUIPMENT 1000001684 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 9 Included
59 7000016517 640 245kV, 50kA AIS EQUIPMENT 1000001688 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 3 Included
60 7000016517 650 245kV, 50kA AIS EQUIPMENT 1000001689 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 3 Included
61 7000016517 660 245kV, 50kA AIS EQUIPMENT 1000032777 245KV, 1600 A, 50KA, 3-PHASE, DOUBLE BREAK TANDEM ISOLATOR WITHOUT E/S EA 6 Included
62 7000016517 670 245kV, 50kA AIS EQUIPMENT 1000020417 216kV Surge Arrester (1-phase) EA 9 Included
63 7000016517 680 245kV, 50kA AIS EQUIPMENT 1000001695 245 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 32 Included
64 7000016517 690 36kV AIS EQUIPMENT 1000001998 Current transformer (33kV) for transformer Netural along with supportstructure & terminal connector SET 3 Included
65 7000016517 700 36kV AIS EQUIPMENT 1000001999 Current transformer (33kV) for Reactor Neutral along with supportstructure & terminal connector EA 2 Included
66 7000016517 710 Erection Hardware for 765 kV S/Y 1000015928 Bus post insulators, spacers, equipmentsupport structures including foundationbolts,conductor(s), Al tube, clamp,connectors including 765 KV and neutralbushings terminal connectors etc forNeutral formation for two (2) Reactorbanks (each bank comprise of threesingle phase units of Reactors) andconnection to neutral groundingReactors (as applicable) and makingconnection arrangement to connect spareunit in place of any unit of all thetwo banks without pysical shifting LOT 1 Included
67 7000016517 720 Erection Hardware for 765 kV S/Y 1000054975 BUS POST INSULATORS, SPACERS, EQUIPMENT SUPPORT STRUCTURES,CONDUCTORS, AL TUBE, CLAMP, CONNECTORS (INCLUDING 765KV, 400KV,TERTIARY AND NEUTURAL BUSHING TERMINAL CONNECTORS ETC) FOR ARRANGEMENTOF NETURAL FORMATION FOR TRANSFORMER(S), DELTA FORMATION FOR THREEBANKS (EACH BANK COMPRISES OF 3 SINGLE PHASE UNITS OFAUTOTRANSFORMERS) AND MAKING CONNECTION ARRANGEMENT TO CONNECT SPAREUNIT IN PLACE OF ANY UNIT OF THE BANK WITHOUT PHYSICAL SHIFTING LOT 1 Included
68 7000016517 730 Erection Hardware for 765 kV S/Y 1000011362 Erection Hardware for 765kV I type layout-Spare bay of half dia. asper technical specification SET 1 Included
69 7000016517 740 Erection Hardware for 765 kV S/Y 1000011349 Erection Hardware for 765kV I type layout-Bus Reactor bay as pertechnical specification SET 2 Included
70 7000016517 750 Erection Hardware for 765 kV S/Y 1000011363 Erection Hardware for 765kV I type layout-Transformer bay as pertechnical specification SET 3 Included
71 7000016517 760 Erection Hardware for 765 kV S/Y 1000011358 Erection Hardware for 765kV I type layout-Line bay as per technicalspecification SET 2 Included
72 7000016517 770 Erection Hardware for 765 kV S/Y 1000011350 Erection Hardware for 765kV I type layout-Bus Work (For one diameters)as per technical specification SET 4 Included
73 7000016517 780 765kV Insulator and Hardware 1000055992 765KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6 Included
74 7000016517 790 765kV Insulator and Hardware 1000055993 765KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH THROUGH CLAMP SUITABLE FOR QUAD CONDUCTOR EA 27 Included
75 7000016517 800 765kV Insulator and Hardware 1000055995 765KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 63 Included
76 7000016517 810 765kV Insulator and Hardware 1000055996 765KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR HEXA CONDUCTOR EA 6 Included
77 7000016517 820 765kV Insulator and Hardware 1000055997 765KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 63 Included
78 7000016517 830 Erection Hardware for 420 kV I Type S/Y 1000011318 Erection Hardware for 400kV I type layout-Bus Work (For one diameter)as per technical specification SET 3 Included
79 7000016517 840 Erection Hardware for 420 kV I Type S/Y 1000011327 Erection Hardware for 400kV I type layout-Transformer bay as pertechnical specification SET 5 Included
80 7000016517 850 Erection Hardware for 420 kV I Type S/Y 1000011317 Erection Hardware for 400kV I type layout-Bus Reactor bay as pertechnical specification SET 2 Included
81 7000016517 860 Erection Hardware for 420 kV I Type S/Y 1000011326 Erection Hardware for 400kV I type layout-Spare bay of half dia as pertechnical specification SET 1 Included
82 7000016517 870 Erection Hardware for 420 kV I Type S/Y 1000011320 Erection Hardware for 400kV I type layout-Any feeder Extn. on existinghalf dia. as per technical specification SET 1 Included
83 7000016517 880 420kV Insulator and Hardware 1000055984 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included
84 7000016517 890 420kV Insulator and Hardware 1000055991 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included
85 7000016517 900 420kV Insulator and Hardware 1000055986 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 24 Included
86 7000016517 910 Erection Hardware for 220 kV DMT Type S 1000011264 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3 Included
87 7000016517 920 220kV Insulator and Hardware 1000055981 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 18 Included
88 7000016517 930 220kV Insulator and Hardware 1000055980 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 18 Included
89 7000016517 940 220kV Insulator and Hardware 1000055975 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9 Included
90 7000016517 950 Earthmat 1000032055 40 MM MS ROD FOR MAIN EARTHMAT KM 48 Included
91 7000016517 960 CSD 1000009713 Controlled Switching Device for 420 kV, 3-ph Circuit Breaker EA 9 Included
92 7000016517 970 CSD 1000009714 Controlled Switching Device for 765 kV, 3-ph Circuit Breaker EA 9 Included
93 7000016517 980 CRP for 765kV Bays 1000005074 765 kV Circuit Breaker Relay Panel With Auto Reclose (with Automation) EA 11 Included
94 7000016517 990 CRP for 765kV Bays 1000005522 765kV Line Protection Panel (with Automation) EA 2 Included
95 7000016517 1000 CRP for 765kV Bays 1000005789 765kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included
96 7000016517 1010 CRP for 765kV Bays 1000005533 765kV Reactor Protection Panel (with Automation) EA 2 Included
97 7000016517 1020 CRP for 765kV Bays 1000005071 765kV Bus Bar Protection Panel (Duplicate)-(with Automation) SET 1 Included
98 7000016517 1030 CRP for 420kV Bays with SAS 1000002165 400kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 12 Included
99 7000016517 1040 CRP for 420kV Bays with SAS 1000004274 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included
100 7000016517 1050 CRP for 420kV Bays with SAS 1000003407 400kV Reactor Protection Panel (with Automation) EA 2 Included
101 7000016517 1060 CRP for 420kV Bays with SAS 1000002146 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included
102 7000016517 1070 CRP for 220kV Bays with SAS 1000001170 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 3 Included
103 7000016517 1080 CRP for 220kV Bays with SAS 1000001167 Augmentation of existing 220kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included
104 7000016517 1090 SAS-AUG 1000001333 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 3 Included
105 7000016517 1100 SAS-AUG 1000003411 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 4 Included
106 7000016517 1110 SAS-AUG 1000003409 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 8 Included
107 7000016517 1120 SAS-AUG 1000005537 Augmentation of Substation automation System for 765kV Tie bay as perTechnical Specification EA 4 Included
108 7000016517 1130 SAS-AUG 1000005535 Augmentation of Substation automation system for 765kV Main bay as perTechnical Specification EA 7 Included
109 7000016517 1140 VMS 1000030433 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1 Included
110 7000016517 1150 PLCC Equipment 1000005823 765kV,3150A,1.0mH , 50kA Line Trap EA 4 Included
111 7000016517 1160 POWER & CONTROL CABLE 1000031951 1.1KV GRADE 3.5CX300 SQMM (XLPE) POWER CABLE KM 2 Included
112 7000016517 1170 POWER & CONTROL CABLE 1000031957 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 6 Included
113 7000016517 1180 POWER & CONTROL CABLE 1000031953 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 2 Included
114 7000016517 1190 POWER & CONTROL CABLE 1000031976 1.1KV GRADE 4CX16 SQMM (PVC) POWER CABLE KM 2 Included
115 7000016517 1200 POWER & CONTROL CABLE 1000031985 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 20 Included
116 7000016517 1210 POWER & CONTROL CABLE 1000031943 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 14 Included
117 7000016517 1220 POWER & CONTROL CABLE 1000031964 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 40 Included
118 7000016517 1230 POWER & CONTROL CABLE 1000031987 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 68 Included
119 7000016517 1240 POWER & CONTROL CABLE 1000031887 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 31 Included
120 7000016517 1250 POWER & CONTROL CABLE 1000056264 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 29 Included
121 7000016517 1260 POWER & CONTROL CABLE 1000056265 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 7 Included
122 7000016517 1270 POWER & CONTROL CABLE 1000032050 4PAIR, 0.5SQMM SCREENED CABLE KM 11 Included
123 7000016517 1280 AIR CONDITIONING & VENTILATION SYSTEM 1000006284 Air conditioning system for Switchyard Panel Room of 6m length SET 5 Included
124 7000016517 1290 AIR CONDITIONING & VENTILATION SYSTEM 1000006285 Air conditioning system for Switchyard Panel Room of 9m length SET 4 Included
125 7000016517 1300 FIRE FIGHTING SYSTEM 1000012072 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500 MVA,(765/v3)/(400/v3)/(33) kV, 1 -phase Autotransformer SET 10 Included
126 7000016517 1310 FIRE FIGHTING SYSTEM 1000012041 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 110 MVAR, 765/√3 kVsingle phase Shunt Reactor SET 7 Included
127 7000016517 1320 FIRE FIGHTING SYSTEM 1000012069 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500MVA , 400KV/220/33kV, 3-phase Autotransformer SET 3 Included
128 7000016517 1330 FIRE FIGHTING SYSTEM 1000012042 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 125 MVAR, 420kV, 3 phaseBus Reactor SET 2 Included
129 7000016517 1340 FIRE FIGHTING SYSTEM 1000012019 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 4 Included
130 7000016517 1350 FIRE FIGHTING SYSTEM 1000012018 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 5 Included
131 7000016517 1360 FIRE FIGHTING SYSTEM 1000012022 4.5 kg CO2 type Portable Fire extinguisher EA 9 Included
132 7000016517 1370 ILLUMINATION SYSTEM 1000014547 Lighting Panel type ACP-2 as per technical specification EA 6 Included
133 7000016517 1380 ILLUMINATION SYSTEM 1000001894 Outdoor Power Receptacle for oilfiltration unit (250A) EA 4 Included
134 7000016517 1390 ILLUMINATION SYSTEM 1000038387 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 50 Included
135 7000016517 1400 ILLUMINATION SYSTEM 1000038325 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 40 Included
136 7000016517 1410 ILLUMINATION SYSTEM 1000013795 Illumination System for switchyard panel room of 6 m length LS 5 Included
137 7000016517 1420 ILLUMINATION SYSTEM 1000013796 Illumination System for switchyard panel room of 9 m length LS 4 Included
138 7000016517 1430 765 kV Equipment support structures 1000050816 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV WT (1PH) EA 4 Included
139 7000016517 1440 765 kV Equipment support structures 1000050811 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV BPI (1PH) EA 63 Included
140 7000016517 1450 765 kV Equipment support structures 1000050813 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CVT (1PH) EA 12 Included
141 7000016517 1460 765 kV Equipment support structures 1000050812 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CT (1PH) EA 33 Included
142 7000016517 1470 765 kV Equipment support structures 1000050815 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CLASS SA (1PH) EA 23 Included
143 7000016517 1480 765 kV Equipment support structures 1000050814 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (1PH) EA 45 Included
144 7000016517 1490 765 kV Equipment support structures 1000050817 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (3PH) EA 25 Included
145 7000016517 1500 400kV Equipment support structures 1000049657 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29 Included
146 7000016517 1510 400kV Equipment support structures 1000050810 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (1PH) EA 18 Included
147 7000016517 1520 400kV Equipment support structures 1000049652 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 31 Included
148 7000016517 1530 400kV Equipment support structures 1000054972 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV HBPI (1PH) EA 36 Included
149 7000016517 1540 400kV Equipment support structures 1000049653 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 36 Included
150 7000016517 1550 400kV Equipment support structures 1000049655 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15 Included
151 7000016517 1560 400kV Equipment support structures 1000054973 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS HIGH LEVELSA (1PH) EA 10 Included
152 7000016517 1570 220kV Equipment support structures 1000052285 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) EA 9 Included
153 7000016517 1580 220kV Equipment support structures 1000049646 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 32 Included
154 7000016517 1590 220kV Equipment support structures 1000049649 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 9 Included
155 7000016517 1600 220kV Equipment support structures 1000049651 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 12 Included
156 7000016517 1610 220kV Equipment support structures 1000049647 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 9 Included
157 7000016517 1620 Mandatory Spare LOT 1000027625 Spare-765KV Circuit Breaker LOT 1 Included
158 7000016517 1630 Mandatory Spare LOT 1000028091 Spare-765kV VKDB Isolator LOT 1 Included
159 7000016517 1640 Mandatory Spare LOT 1000054976 SPARE-765KV CURRENT TRANSFORMER LOT 1 Included
160 7000016517 1650 Mandatory Spare LOT 1000054977 SPARE-765KV CAPACITIVE VOLTAGE TRANSFORMER LOT 1 Included
161 7000016517 1660 Mandatory Spare LOT 1000028372 SPARES FOR 624KV SURGE ARRESTER LS 1 Included
162 7000016517 1670 Mandatory Spare LOT 1000028245 Spare For 400kV Bus Reactor LS 1 Included
163 7000016517 1680 Mandatory Spare LOT 1000019918 Spares for 420kV Circuit Breaker LS 1 Included
164 7000016517 1690 Mandatory Spare LOT 1000019919 Spares for 420kV Double break Isolator LS 1 Included
165 7000016517 1700 Mandatory Spare LOT 1000024186 SPARES FOR 336KV SURGE ARRESTER LS 1 Included
166 7000016517 1710 Mandatory Spare LOT 1000025940 Spare-420kV BPI SET 1 Included
167 7000016517 1720 Mandatory Spare LOT 1000025941 Spare-420kV CT 1 SET 1 Included
168 7000016517 1730 Mandatory Spare LOT 1000025935 Spare-245kV Circuit Breaker SET 1 Included
169 7000016517 1740 Mandatory Spare LOT 1000025936 Spare-245kV Isolator SET 1 Included
170 7000016517 1750 Mandatory Spare LOT 1000025933 Spare-245kV CT SET 1 Included
171 7000016517 1760 Mandatory Spare LOT 1000025932 Spare-245kV BPI SET 1 Included
172 7000016517 1770 Mandatory Spare LOT 1000019912 Relay & protection Panels (with automation) LS 1 Included
173 7000016517 1780 Mandatory Spare LOT 1000019927 Spares-Substation Automation System LS 1 Included
174 7000016517 1790 Mandatory Spare LOT 1000053851 SPARES FOR CLAMPS & CONNECTORS LOT 1 Included
175 7000016517 1800 Mandatory Spare LOT 1000019925 Spares for Fire Protection System LS 1 Included
176 7000016517 1810 Mandatory Spare LOT 1000025930 Spare-216kV Surge Arrester SET 1 Included
177 7000016517 1820 Mandatory Spare LOT 1000054979 SPARE-800KV BUS POST INSULATOR LOT 1 Included
Total F&I Price 0.00
Place: Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 3
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-3 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage lum-sum 0.00%
INSTALLATION CHARGES INSTALLATION CHARGES Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code/DSR CODE-2023 SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Erection Charges Total Erection Charges Total GST as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
1 7000016517 10 10 10 CIVIL WORKS 1.1.2 995433 18% Carriage of materials by mechanical transport including loading, unloading and stacking Up to 1 Km: Earth Cum 200.000 Included 0.00 0 0
2 7000016517 10 10 20 CIVIL WORKS 2.6.1 995454 18% Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed: All kinds of soil cum 274.126 Included 0.00 0 0
3 7000016517 10 10 30 CIVIL WORKS 2.8.1 995454 18% Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. cum 0.154 Included 0.00 0 0
4 7000016517 10 10 50 CIVIL WORKS 2.25 995454 18% Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Cum 1069.529 Included 0.00 0 0
5 7000016517 10 10 60 CIVIL WORKS 2.26.1 995454 18% Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.:All kind of soil Cum 377.000 Included 0.00 0 0
6 7000016517 10 10 70 CIVIL WORKS 2.27 995428 18% Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. Cum 103.000 Included 0.00 0 0
7 7000016517 10 10 80 CIVIL WORKS 2.31 995455 18% Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared sqm. 3.000 Included 0.00 0 0
8 7000016517 10 10 90 CIVIL WORKS 2.34.1 995428 18% Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/Lindane emulsifiable concrete of 20% Litre 700.000 Included 0.00 0 0
9 7000016517 10 10 100 CIVIL WORKS 2.35.2.1 995424 18% Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linearmetre including drilling and plugging holes etc: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration metre 535.000 Included 0.00 0 0
10 7000016517 10 10 110 CIVIL WORKS 2.35.3.1 995454 18% Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300mm apart including drilling 12mm diameter holes and plugging with cement mortar 1: 2 (1 cement: 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration sqm. 1043.000 Included 0.00 0 0
11 7000016517 10 10 120 CIVIL WORKS 4.1.3 995432 18% Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (Zone-III) : 4 graded stone aggregate 20 mm nominal size) cum 34.000 Included 0.00 0 0
12 7000016517 10 10 130 CIVIL WORKS 4.1.8 995432 18% Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse (Zone-III) sand : 8 graded stone aggregate 40 mm nominal size). Cum 266.102 Included 0.00 0 0
13 7000016517 10 10 140 CIVIL WORKS 4.3.1 995432 18% Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns Sqm 190.160 Included 0.00 0 0
14 7000016517 10 10 160 CIVIL WORKS 4.11 995421 18% Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). Sqm 92.000 Included 0.00 0 0
15 7000016517 10 10 170 CIVIL WORKS 4.12 995421 18% Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification per 50Kg Cement 13.000 Included 0.00 0 0
16 7000016517 10 10 180 CIVIL WORKS 4.13 995421 18% Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil Sqm 92.000 Included 0.00 0 0
17 7000016517 10 10 190 CIVIL WORKS 4.17 995462 18% Making plinth protection 50 mm thick of 1:3:6 cement concrete over 75mm thick dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand,including necessary excavation levelling & dressing & finishing the top smooth. sqm. 210.000 Included 0.00 0 0
18 7000016517 10 10 200 CIVIL WORKS 5.9.1 995462 18% Centering & shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases of columns etc. for mass concrete. Sqm 222.123 Included 0.00 0 0
19 7000016517 10 10 210 CIVIL WORKS 5.9.3 995462 18% Centering & shuttering including strutting, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and access platform. Sqm 896.000 Included 0.00 0 0
20 7000016517 10 10 220 CIVIL WORKS 5.9.5 995462 18% Centering & shuttering including strutting, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and cantilevers. Sqm 1656.000 Included 0.00 0 0
21 7000016517 10 10 230 CIVIL WORKS 5.9.6 995462 18% Centering & shuttering including strutting, propping etc. and removal of form work for:Columns, Pillars, Piers, Abutments, Posts and Struts Sqm 1015.200 Included 0.00 0 0
22 7000016517 10 10 240 CIVIL WORKS 5.9.7 995454 18% Centering & shuttering including strutting, propping etc. and removal of form work for:Stairs, (excluding landings) except spiral-staircases. Sqm 190.000 Included 0.00 0 0
23 7000016517 10 10 250 CIVIL WORKS 5.9.15 995454 18% Centering and shuttering including strutting, propping etc and removal of form for: Small lintels not exceeding 1.5m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like sqm 159.000 Included 0.00 0 0
24 7000016517 10 10 260 CIVIL WORKS 5.9.16.1 995454 18% Centering & shuttering including strutting, propping etc. and removal of form work for:Edges of slabs and breaks in floors and walls: Under 20 cm wide metre 746.000 Included 0.00 0 0
25 7000016517 10 10 270 CIVIL WORKS 5.9.19 995454 18% Centering and shuttering including strutting, propping etc and removal of form for: Weather shade, Chajjas, corbels etc, including edges sqm 111.000 Included 0.00 0 0
26 7000016517 10 10 280 CIVIL WORKS 5.22.6/ 5.22A.6 995454 18% Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete for all levels: Thermo-Mechanically Treated bars of grade Fe-500D or more Kilogram 91395.757 Included 0.00 0 0
27 7000016517 10 10 290 CIVIL WORKS 5.33.1 995451 18% Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge: All works upto plinth level. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). Cum 83.257 Included 0.00 0 0
28 7000016517 10 10 300 CIVIL WORKS 5.33.2 995454 18% Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge: All works above plinth level upto floor V level. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). Cum 800.000 Included 0.00 0 0
29 7000016517 10 10 310 CIVIL WORKS 5.35 995454 18% Add for using extra cement in the items of design mix over and above the specified cement content therein. quintal 275.667 Included 0.00 0 0
30 7000016517 10 10 320 CIVIL WORKS 6.1.1 995454 18% Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) cum 50.000 Included 0.00 0 0
31 7000016517 10 10 330 CIVIL WORKS 6.1.2 995454 18% Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) cum 302.000 Included 0.00 0 0
32 7000016517 10 10 340 CIVIL WORKS 6.4.2 995428 18% Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in Cement mortar 1:6 (1 cement : 6 coarse sand) cum 300.000 Included 0.00 0 0
33 7000016517 10 10 350 CIVIL WORKS 6.13.2 995428 18% Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in super structure plinth to floor V level: cement mortar 1:4 (1 cement : 4 coarse sand) Sqm 1200.000 Included 0.00 0 0
34 7000016517 10 10 360 CIVIL WORKS 6.15 995428 18% Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry. sqm 1416.000 Included 0.00 0 0
35 7000016517 60 30 10 CIVIL WORKS 6.44 995455 18% Brick edging 7cm wide 11.4cm deep to plinth protection with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 including grouting with cement mortar 1: 4 (1 cement: 4 fine sand). metre 337.000 Included 0.00 0 0
36 7000016517 60 30 20 CIVIL WORKS 8.2.2.2 995455 18% Providing and fixing 18mm thick gang saw cut mirror polished premoulded and prepolished) machine cut for kitchen platforms, vanity counters, window sills , facias and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement : 4 coarse sand) with joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels: Granite stone of any colour and shade : Area of slab over 0.50 sqm. Sqm 44.000 Included 0.00 0 0
37 7000016517 60 30 30 CIVIL WORKS 8.3.2 995455 18% Providing edge moulding to 18mm thick marble stone counters, Vanities etc. including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge: Granite work. Metre 70.000 Included 0.00 0 0
38 7000016517 60 30 40 CIVIL WORKS 8.4 995455 18% Extra for fixing marble /granite stone over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive including cleaning etc. complete. Metre 70.000 Included 0.00 0 0
39 7000016517 190 20 10 CIVIL WORKS 8.5 998734 18% Extra for providing opening of required size & shape for wash basins/ kitchen sink in kitchen platform, vanity counters and similar location in marble/Granite/stone work including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete. Each 15.000 Included 0.00 0 0
40 7000016517 190 20 20 CIVIL WORKS 8.31 998734 18% Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. Sqm 324.000 Included 0.00 0 0
41 7000016517 190 20 30 CIVIL WORKS 9.1.1 998734 18% Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately): Second Class Teak wood Cum 2.000 Included 0.00 0 0
42 7000016517 190 20 40 CIVIL WORKS 9.9.1.2 998734 18% Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws: Second class teak wood: 30 mm thick Sqm 35.000 Included 0.00 0 0
43 CIVIL WORKS 9.11.1 18% Extra for providing heavy sheet float glass panes instead of ordinary float glass in glazed doors, windows and clerestory window shutters. (Area of opening for glass panes excluding portion inside rebate shall be measured): 5.5mm thick instead of 4mm thick. Sqm 26.000 Included 0.00 0 0 CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS
44 7000016517 190 20 50 CIVIL WORKS 9.20.2 998336 18% Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.: 30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws Sqm 192.000 Included 0.00 0 0
45 CIVIL WORKS 9.21.2 18% Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters :30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws. Sqm 59.000 Included 0.00 0 0
46 CIVIL WORKS 9.21.3 18% Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: 25 mm thick (for cupboard) including ISI marked nickel plated bright finished M.S. piano hinges with necessary screws Sqm 87.000 Included 0.00 0 0
47 CIVIL WORKS 9.23 18% Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of shutters (over all area of door shutter to be measured) Over item no. 9.20 and 9.21. Sqm. 59.000 Included 0.00 0 0
48 CIVIL WORKS 9.27.2.1.1 18% Providing and fixing wire gauge shutters using galvanized M.S. wire gauge of average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm, for doors, windows and clerestory windows with hinges and necessary screws: 30 mm thick shutters: with ISI marked M.S. pressed butt hinges bright finished of required size: Second class teak wood Sqm 380.000 Included 0.00 0 0
49 CIVIL WORKS 9.47.1 18% Providing and fixing nickel plated M.S. pipe curtain rods with nickel plated brackets :20 mm dia (heavy type) metre 317.000 Included 0.00 0 0
50 CIVIL WORKS 9.48.2 18% Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete : Fixed to openings /wooden frames with rawl plugs screws etc. kg 2300.000 Included 0.00 0 0
51 CIVIL WORKS 9.53 18% Providing 40x5mm flat iron hold fast 40cm long including fixing to frame with 10mm diameter bolts, nuts and wooden plugs and embedding in cement concrete block 30x10x15cm 1: 3: 6 mix (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). each 1114.000 Included 0.00 0 0
52 CIVIL WORKS 9.96.1 18% Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868), transparent or dyed to required colour or shade, with nuts and screws etc. complete :300x16 mm each 149.000 Included 0.00 0 0
53 CIVIL WORKS 9.96.2 18% Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868), transparent or dyed to required colour or shade, with nuts and screws etc. complete :250x16 mm each 88.000 Included 0.00 0 0
54 CIVIL WORKS 9.97.1 18% Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade with necessary screws etc. complete : 300X10mm Each 136.000 Included 0.00 0 0
55 CIVIL WORKS 9.97.3 18% Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade with necessary screws etc. complete : 200x10mm Each 84.000 Included 0.00 0 0
56 CIVIL WORKS 9.97.4 18% Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade with necessary screws etc. complete : 150x10mm Each 234.000 Included 0.00 0 0
57 CIVIL WORKS 9.100.1 18% Providing and fixing aluminium handles ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete :125mm Each 294.000 Included 0.00 0 0
58 CIVIL WORKS 9.100.2 18% Providing and fixing aluminium handles ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete :100mm Each 215.000 Included 0.00 0 0
59 CIVIL WORKS 9.101.2 18% Providing and fixing aluminium hanging floor door stopper ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour and shade with necessary screws etc. complete.Twin rubber stopper Each 229.000 Included 0.00 0 0
60 CIVIL WORKS 9.102 18% Providing and fixing aluminium casement stays, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade, with necessary screws etc complete. Each 266.000 Included 0.00 0 0
61 CIVIL WORKS 9.103 18% Providing and fixing bright finished brass 100mm mortice latch and lock, ISI marked, with six levers and a pair of anodised (anodic coating not less than grade AC 10 as per IS: 1868) aluminium lever handles of approved quality with necessary screws etc complete. Each 14.000 Included 0.00 0 0
62 CIVIL WORKS 9.114.2 18% Providing and fixing magnetic catcher of approved quality in cupboard / ward robe shutters, including fixing with necessary screws etc complete: Double strip (horizontal type) Each 100.000 Included 0.00 0 0
63 CIVIL WORKS DSR-21, 9.147A.1 18% Providing and fixing factory made uPVC white colour casement/ casement cum fixed glazed windows comprising of uPVC multichambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately): Casement window single panel with S.S. friction hinges (300 x 19 x 1.9 mm), made of (small series) frame 47 x 50 mm & sash 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glass pane glazing bead of appropriate dimension. (Area of window upto 0.75 sqm.) Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable: sqm 19 Included 0.00 0 0
64 CIVIL WORKS DSR-21, 9.147A.2 18% Providing and fixing factory made uPVC white colour casement/ casement cum fixed glazed windows comprising of uPVC multichambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately): Casement window double panels with S.S. friction hinges (300 x 19 x 1.9 mm) made of (small series) frame 47 x 50 mm, sash 47 x 68 mm & mullion 47 x 68 mm all having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window above 0.75 sqm upto 1.50 sqm). Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable: sqm 36.00 Included 0.00 0 0
65 CIVIL WORKS DSR-21, 9.147A.3 18% Providing and fixing factory made uPVC white colour casement/ casement cum fixed glazed windows comprising of uPVC multichambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately): Casement window double panels with top fixed with S.S. friction hinges (350 x 19 x 1.9 mm) made of (small series) frame 47 x 50 mm, sash 47 x 68 mm & mullion 47 x 68 mm all having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 2.50 sqm). Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable: sqm 108.00 Included 0.00 0 0
66 CIVIL WORKS 10.14.1.1 18% Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge: Profile B Fixing with adjustable lugs with split end tail to each jamb metre 300.00 Included 0.00 0 0
67 CIVIL WORKS 10.14.3.1 18% Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge: Profile E Fixing with adjustable lugs with split end tail to each jamb metre 384.00 Included 0.00 0 0
68 CIVIL WORKS 10.18 18% Providing and fixing circular/ Hexagonal cast iron or M.S. sheet box forceiling fan clamp of internal dia 140mm, 73mm height, top lid of 1.5mm thick M.S. sheet with its top surface hacked for proper bonding, top lid shall be screwed into the cast iron/ M.S. sheet box by means of 3.3mm dia. round headed screws, one lock at the corners. Clamp shall be made of 12mm dia M.S. bar bent to shape as per standard drawing. Each 102.00 Included 0.00 0 0
69 CIVIL WORKS 10.25.2 18% Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel, etc as required : In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Kg 150.00 Included 0.00 0 0
70 CIVIL WORKS 10.28 18% Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc. including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge. ( for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) Kg 2381.00 Included 0.00 0 0
71 CIVIL WORKS 11.26.1 18% Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick. Sqm 141.00 Included 0.00 0 0
72 CIVIL WORKS 11.27 18% Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. Sqm 43.00 Included 0.00 0 0
73 CIVIL WORKS 11.31 18% Extra for pre finished nosing in treads of steps of Kota stone/ sand stone slab. Metre 254.00 Included 0.00 0 0
74 CIVIL WORKS 11.32 18% Extra for Kota stone/ sand stone in treads of steps and risers using single length up to 1.05 metre Sqm 179 Included 0.00 0 0
75 CIVIL WORKS 11.37 18% Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand) including pointing the joints with white cement and matching pigment etc., complete. Sqm 254.00 Included 0.00 0 0
76 CIVIL WORKS 11.41.2 18% Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption's less than 0.08% and conforming to IS : 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including grouting the joints with white cement and matching pigments etc., complete: Size of Tile 600x600 mm Sqm 1164.00 Included 0.00 0 0
77 CIVIL WORKS 11.46.2 18% Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer) with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make in all colours & shade in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), including grouting the joint with white cement & matching pigments etc. complete: Size of Tile 600x600 mm Sqm 179.00 Included 0.00 0 0
78 CIVIL WORKS 12.21.1 18% Providing gola 75x75mm in cement concrete 1: 2: 4 (1 cement: 2 coarse sand: 4 stone aggregate 10mm and down gauge), including finishing with cement mortar 1: 3 (1 cement: 3 fine sand) as per standard design: In 75x75mm deep chase metre 337.00 Included 0.00 0 0
79 CIVIL WORKS 12.22 18% Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1mx1mx400micron, finished with 12mm cement plaster 1:3 (1 cement :3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. Each 64.00 Included 0.00 0 0
80 CIVIL WORKS 12.41.2 18% Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion, (i) Single socketed pipes: 110mm diameter metre 321.00 Included 0.00 0 0
81 CIVIL WORKS 12.42.2.2 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single pushfit Coupler: 110mm each 42 Included 0.00 0 0
82 CIVIL WORKS 12.42.3.1 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single tee with door: 75x75x75mm each 13 Included 0.00 0 0
83 CIVIL WORKS 12.42.3.2 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single tee with door: 110x110x110mm each 65 Included 0.00 0 0
84 CIVIL WORKS 12.42.4.2 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single tee without door: 110x110x110mm each 18.00 Included 0.00 0 0
85 CIVIL WORKS 12.42.5.1 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Bend 87.5°: 75mm bend each 13 Included 0.00 0 0
86 CIVIL WORKS 12.42.5.2 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Bend 87.5°: 110mm bend each 69 Included 0.00 0 0
87 CIVIL WORKS 12.42.6.1 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Shoe(Plain): 75mm Shoe each 13 Included 0.00 0 0
88 7000016517 190 20 60 CIVIL WORKS 12.42.6.2 998734 18% Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion: Shoe (Plain): 110 mm Shoe Nos 31 Included 0.00 0 0
89 7000016517 190 20 70 CIVIL WORKS 12.43.1 998734 18% Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1: 4 (1 cement: 4 coarse sand) and making good the wall etc complete: 75mm each 15.00 Included 0.00 0 0
90 7000016517 190 20 80 CIVIL WORKS 12.43.2 998734 18% Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1: 4 (1 cement: 4 coarse sand) and making good the wall etc complete: 110mm each 134.00 Included 0.00 0 0
91 7000016517 190 20 90 CIVIL WORKS 12.44 998734 18% Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15cm diameter and weighing not less than 440 grams. each 42.00 Included 0.00 0 0
92 CIVIL WORKS 13.1.2 18% 12 mm cement plaster of mix : 1:6 (1 cement : 6 fine sand) Sqm 1478.00 Included 0.00 0 0
93 CIVIL WORKS 13.2.2 18% 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement : 6 fine sand) Sqm 1564.00 Included 0.00 0 0
94 CIVIL WORKS 13.7.2 18% 12mm Cement plaster finished with a floating coat of neat cement of mix: 1:4 (1 Cement:4 fine sand) Sqm 900.00 Included 0.00 0 0
95 CIVIL WORKS 13.9.1 18% Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement: 12 mm cement plaster sqm 2020 Included 0.00 0 0
96 CIVIL WORKS 13.12 18% 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge. Sqm 2407 Included 0.00 0 0
97 CIVIL WORKS 13.16.1 18% 6 mm cement plaster of mix: 1:3 (1 cement : 3 fine sand) Sqm 956 Included 0.00 0 0
98 CIVIL WORKS 13.26 18% Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete. sqm 4181.00 Included 0.00 0 0
99 CIVIL WORKS DSR-21, 13.41.1 18% Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade: New work (two or more coats) over and including water thinnable priming coat with cement primer sqm 4181.00 Included 0.00 0 0
100 7000016517 190 20 100 CIVIL WORKS 13.44.1 998336 18% Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) sqm 2387.00 Included 0.00 0 0
101 7000016517 190 20 110 CIVIL WORKS DSR-21, 13.50.1 998336 18% Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) sqm 421.00 Included 0.00 0 0
102 7000016517 190 20 120 CIVIL WORKS 13.61.1 998336 18% Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work sqm 237.00 Included 0.00 0 0
103 7000016517 360 50 10 CIVIL WORKS 17.1.1 998734 18% Providing and fixing water closet squatting pan (Indian type W.C.pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests Nos 1.00 Included 0.00 0 0
104 7000016517 360 50 20 CIVIL WORKS 17.2.1 998734 18% Providing and fixing white vitreous china pedestal type water closet (European type W.C pan) with seat and lid, 10 litre low level white PVC flushing cistern, including flush pipe, with manually control device ( handle lever), confirming to IS:7231, with all fittings and fixtures complete,including cutting and making good the walls and floors wherever required: W.C. pan with ISI marked black solid plastic seat and lid. Nos 31.00 Included 0.00 0 0
105 7000016517 360 50 30 CIVIL WORKS 17.7.3 998734 18% Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps,32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require : White Vitreous China Wash basin size 550x400 mm with a single 15 mm C.P. brass pillar tap. Nos 32.00 Included 0.00 0 0
106 7000016517 360 50 40 CIVIL WORKS 17.10.1.2 998336 18% Providing and fixing stainless steel A ISI 304 (18/8) kitchen sink as per IS : 13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls: Kitchen sink with drain board: 510 x 1040mm bowl depth 225 mm Nos 13.00 Included 0.00 0 0
107 7000016517 360 50 50 CIVIL WORKS 17.22A 998336 18% Providing and fixing CP brass 32mm size bottle trap of approved quality & make and as per the direction of Engineer-in-charge. Each 43.00 Included 0.00 0 0
108 7000016517 360 50 60 CIVIL WORKS 17.31 998734 18% Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. Each 24.00 Included 0.00 0 0
109 7000016517 410 20 10 CIVIL WORKS 17.33 998713 18% Providing and fixing 600x120x5 mm glass shelf with edges round off, supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc.,Complete. Each 23.00 Included 0.00 0 0
110 7000016517 410 20 20 CIVIL WORKS 17.34.1 998734 18% Providing and fixing toilet paper holder : C.P. brass Nos 19.00 Included 0.00 0 0
111 7000016517 410 20 30 CIVIL WORKS 17.35.1.1 998713 18% Providing and fixing soil, waste and vent pipes : 100 mm dia: Sand cast iron S&S pipe as per IS: 1729. metre 282.00 Included 0.00 0 0
112 7000016517 410 20 40 CIVIL WORKS 17.37.1 998713 18% Providing and fixing M.S. holder-bat clamps of approved design to Sand Cast iron/cast iron (spun) pipe embedded in and including cement concrete blocks 10x10x10cm of 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) including cost of cutting holes and making good the walls etc. :For 100 mm dia. Pipe Each 117.00 Included 0.00 0 0
113 7000016517 410 20 50 CIVIL WORKS 17.39.1.1 998734 18% Providing and fixing plain bend of required degree.100 mm dia: Sand cast iron S&S as per IS - 1729 Each 52.00 Included 0.00 0 0
114 7000016517 1830 1120 10 CIVIL WORKS 17.40.1.1 998736 18% Providing and fixing heel rest sanitary bend: 100 mm dia: Sand cast iron S&S as per IS - 1729 Each 56.00 Included 0.00 0 0
115 7000016517 1830 1120 20 CIVIL WORKS 17.56.1.1 998736 18% Providing and fixing terminal guard: 100 mm: Sand cast iron S&S as per IS - 1729 Each 32.00 Included 0.00 0 0
116 7000016517 1840 1290 10 CIVIL WORKS 17.58.1 998736 18% Providing lead caulked joints to sand cast iron/centrifugally cast (spun) iron pipes and fittings of diameter: 100 mm Each 57.00 Included 0.00 0 0
117 7000016517 1840 1290 20 CIVIL WORKS 17.59.1 998736 18% Providing and fixing M.S. stays and clamps for sand cast iron/centrifugally cast (spun) iron pipes of diameter :100 mm Each 32.00 Included 0.00 0 0
118 7000016517 1840 1290 30 CIVIL WORKS 17.59.2 998736 18% Providing and fixing M.S. stays and clamps for sand cast iron/centrifugally cast (spun) iron pipes of diameter :75 mm Each 32.00 Included 0.00 0 0
119 7000016517 1840 1290 40 CIVIL WORKS 17.60.1.2 998736 18% Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100 mm inlet and 100 mm outlet: Sand Cast iron S & S as per IS: 1729 Each 43.00 Included 0.00 0 0
120 7000016517 1840 1290 50 CIVIL WORKS 17.73.1 998736 18% Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour: 450 mm long towel rail with total length of 495 mm,78 mm wide and effective height of 88mm, weighting not less than 170 mgs Each 31.00 Included 0.00 0 0
121 7000016517 1840 1290 60 CIVIL WORKS 18.7.2 998736 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.:Internal work - Exposed on wall: 20 mm nominal outer dia .Pipes. metre 13.00 Included 0.00 0 0
122 7000016517 1840 1290 70 CIVIL WORKS 18.7.3 998736 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.:Internal work - Exposed on wall:25 mm nominal outer dia .Pipes. metre 68.00 Included 0.00 0 0
123 7000016517 1840 1290 80 CIVIL WORKS 18.7.4 998736 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.:Internal work - Exposed on wall: 32 mm nominal outer dia .Pipes. metre 140.00 Included 0.00 0 0
124 7000016517 1840 1290 90 CIVIL WORKS 18.8.1 998736 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.: Concealed work including cutting chases and making good the walls etc.: 15 mm nominal outer dia .Pipes. metre 78.00 Included 0.00 0 0
125 7000016517 1840 1290 100 CIVIL WORKS 18.8.2 998736 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.: Concealed work including cutting chases and making good the walls etc.: 20 mm nominal outer dia .Pipes. metre 17.00 Included 0.00 0 0
126 7000016517 1840 1290 110 CIVIL WORKS 18.9.6 998734 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings.This includes jointing of pipes and fittings with one step CPVC solvent cement , trenching, refilling & testing of joints complete as per direction of Engineer in Charge: 50 mm nominal outer dia Pipes Metre 120.00 Included 0.00 0 0
127 7000016517 1850 1310 10 CIVIL WORKS 18.9.8 998734 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings.This includes jointing of pipes and fittings with one step CPVC solvent cement , trenching, refilling & testing of joints complete as per direction of Engineer in Charge: 75 mm nominal outer dia Pipes Metre 34.00 Included 0.00 0 0
128 7000016517 1850 1310 20 CIVIL WORKS 18.9.9 998736 18% Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings.This includes jointing of pipes and fittings with one step CPVC solvent cement , trenching, refilling & testing of joints complete as per direction of Engineer in Charge: 100 mm nominal outer dia Pipes Metre 216.00 Included 0.00 0 0
129 7000016517 1850 1310 30 CIVIL WORKS 18.10.4 998736 18% Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc. : 32 mm dia nominal bore metre 23.00 Included 0.00 0 0
130 7000016517 1850 1310 40 CIVIL WORKS 18.10.5 998736 18% Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc. : 40 mm dia nominal bore metre 23.00 Included 0.00 0 0
131 7000016517 1850 1310 50 CIVIL WORKS 18.10.6 998736 18% Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc. : 50 mm dia nominal bore metre metre 106.00 Included 0.00 0 0
132 7000016517 1850 1310 60 CIVIL WORKS 18.14 998736 18% Fixing water meter and stop cock in pipe line including cutting and threading the pipe and making long screws etc. complete (cost of water meter and stop cock to be paid separately). Each 14.00 Included 0.00 0 0
133 7000016517 1850 1310 70 CIVIL WORKS 18.16.1 998736 18% Providing and fixing brass stop cock of approved quality: 15 mm nominal bore Each 14.00 Included 0.00 0 0
134 7000016517 1860 1340 10 CIVIL WORKS 18.16.2 998736 18% Providing and fixing brass stop cock of approved quality :20 mm nominal bore Each 27.00 Included 0.00 0 0
135 7000016517 1860 1340 20 CIVIL WORKS 18.17.2 998736 18% Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 32 mm nominal bore. Each 14.00 Included 0.00 0 0
136 7000016517 1860 1340 30 CIVIL WORKS 18.17.3 998736 18% Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 40 mm nominal bore Each 14.00 Included 0.00 0 0
137 CIVIL WORKS 18.17.4 18% Providing and fixing gun metal gate valve with C.I.wheel of approved quality( Screwed ended): 50 mm nominal bore Each 14.00 Included
138 CIVIL WORKS 18.17.6 18% Providing and fixing gun metal gate valve with C.I.wheel of approved quality( Screwed ended): 80 mm nominal bore Each 3.00 Included
139 CIVIL WORKS 18.18.2 18% Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete: 20 mm nominal bore Each 28.00 Included
140 CIVIL WORKS 18.18.3 18% Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete: 25 mm nominal bore Each 14.00 Included
141 CIVIL WORKS 18.21.1.1 18% Providing and fixing uplasticised PVC connection pipe with brass unions : 30 cm length: 15 mm nominal bore Each 193.00 Included
142 CIVIL WORKS 18.22.1 18% Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet : 100 mm diameter Each 27.00 Included
143 CIVIL WORKS 18.31.1.2 18% Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) :100 mm diameter: Class II Each 3.00 Included
144 CIVIL WORKS 18.32.1 18% Constructing masonry Chamber 30x30x50 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) necessary excavation foundation concrete 1:5:10 ( 1 cement :5 fine sand:10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement :3 coarse sand) 12mm thick finished with a floating coat of neat cement complete as per standard design : With F.P.S. bricks Each 23.00 Included
145 CIVIL WORKS 18.40.6 18% Painting G.I. pipes and fittings with two coats of anti-corrosive bitumastic paint of approved quality :50 mm diameter pipe metre 106.00 Included
146 CIVIL WORKS 18.41.6 18% Providing and filling sand of grading zone V or coarser grade all-round the pipes in external work: 50 mm dia nominal bore Metre 120.00 Included
147 CIVIL WORKS 18.41.8 18% Providing and filling sand of grading zone V or coarser grade all-round the pipes in external work: 80 mm diameter pipe Metre 34.00 Included
148 CIVIL WORKS 18.41.9 18% Providing and filling sand of grading zone V or coarser grade all-round the pipes in external work: 100 mm diameter pipe Metre 216.00 Included
149 CIVIL WORKS 18.48A 18% Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank:Circular tank/ Rectangular tank Litre 14000.00 Included
150 CIVIL WORKS 18.51.1 18% Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS Standards and weighing not less thn 690gms: 15 mm nominal bore Each 13.00 Included
151 CIVIL WORKS 18.52.1 18% Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved make conforming to IS:8931: 15 mm nominal bore Each 26.00 Included
152 CIVIL WORKS 18.53.1 18% Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 a) 15 mm nominal bore: 15mm nominal bore Each 193.00 Included
153 CIVIL WORKS 18.59.1 18% Providing and fixing C.I. double acting air valve of approved quality with bolts, nuts, rubber insertions etc. complete (The tail pieces, tapers etc if required will be paid separately) : 50 mm dia Each 7.00 Included
154 CIVIL WORKS 18.60.1 18% Providing and fixing enclosed type water meter (bulk type) conforming to IS : 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. (The tail pieces if required will be paid separately): 80 mm dia nominal bore Each 1.00 Included
155 CIVIL WORKS 18.65 18% Providing and fixing PTMT soap dish holder having length of 138mm, breadth 102mm, height 75 mm with concealed fitting arrangements,weighting not less than 106 gms Each 31.00 Included
156 CIVIL WORKS 18.80.2 18% Disinfecting C.I. water mains by flushing with water containing bleaching powder @ 0.5 gms per litre of water and cleaning the same with fresh water, operation to be repeated three times including getting the sample of water from the disinfected main tested in the municipal laboratory: 100 mm diameter C.I. pipe 100 Metre 3.00 Included
157 CIVIL WORKS 19.1.2 18% Providing, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete : 150 mm diameter Metre 308.00 Included
158 CIVIL WORKS 19.1.3 18% Providing, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete : 200 mm diameter Metre 222.00 Included
159 CIVIL WORKS 19.2.2 18% Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design: 150 mm diameter S.W. pipe Metre 308.00 Included
160 CIVIL WORKS 19.2.3 18% Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design: 200 mm diameter S.W. pipe Metre 222.00 Included
161 CIVIL WORKS 19.3.2 18% Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand: 10 graded stone aggregate 40 mm nominal size) upto haunches of S.W/ RCC. pipes including bed concrete as per standard design : 150 mm diameter R.C.C. pipe Metre 62.00 Included
162 CIVIL WORKS 19.3.4 18% Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand: 10 graded stone aggregate 40 mm nominal size) upto haunches of S.W/ RCC. pipes including bed concrete as per standard design : 250 mm diameter R.C.C.. pipe Metre 34.00 Included
163 CIVIL WORKS 19.3.5 18% Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand: 10 graded stone aggregate 40 mm nominal size) upto haunches of S.W/ RCC. pipes including bed concrete as per standard design : 300 mm diameterR.C.C. pipe Metre 10.00 Included
164 CIVIL WORKS 19.4.1.1 18% Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design : 100x100 mm size P type: With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 Each 27.00 Included
165 CIVIL WORKS 19.6.1 18% Providing and laying non Pressure NP2 class (Light Duty) RCC Pipe including collar jointed with stiff mixture of cement mortar 1:2 including testing of joints complete : 100 mm dia RCC Pipe metre 36.00 Included
166 CIVIL WORKS 19.6.2 18% Providing and laying non Pressure NP2 class (Light Duty) RCC Pipe including collar jointed with stiff mixture of cement mortar 1:2 including testing of joints complete : 150 mm dia RCC Pipe metre 207.00 Included
167 CIVIL WORKS 19.6.3 18% Providing and laying non pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete : 250 mm dia R.C.C. pipe Metre 171.00 Included
168 CIVIL WORKS 19.6.4 18% Providing and laying non pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete : 300 mm dia R.C.C. pipe Metre 34.00 Included
169 CIVIL WORKS 19.7.1.1 18% Constructing brick masonry manhole in cement mortar 1:4 (1 cement : 4 coarse sand) R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 Each 41.00 Included
170 CIVIL WORKS 19.8.1.1 18% Extra for depth for manholes: Size 90x80 cm: With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 Each 8.00 Included
171 CIVIL WORKS 19.16 18% Providing orange colour safety foot rest of minimum 6mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steel bar conforming to IS : 1786 having minimum cross section as 23 mmx25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring protections on tail lenght on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specification & having manufacture's permanent identification mark to be visible even after fixing, including fixing in manhole with 30x20x15 cm cement concrete block 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete as per design. Each 103.00 Included
172 CIVIL WORKS 19.18.2 18% Supplying and fixing C.I. cover without frame for manholes : 500 mm diameter C.I. cover (medium duty) the weight of the cover to be not less than 58 kg each 3202.90 Each 10.00 Included
173 CIVIL WORKS 19.21.1 18% Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete: distribution branch with G. I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete: For pipes 100 to 250 mm diameter Each 1.00 Included
174 CIVIL WORKS 19.21.2 18% Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete: distribution branch with G. I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete: For pipes 250 to 300 mm diameter Each 1.00 Included
175 CIVIL WORKS 19.27.1 18% Constructing brick masonary road gully chamber 50x45x60 cm with bricks of class designation 75 in cement morter 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast RCC horizontal grating complete as per standard design: With common burnt clay F.P.S(non modular) bricks of class designation 7.5 Each 55.00 Included
176 CIVIL WORKS 19.32.1 18% Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W drain pipe 100 mm diameter, 1.8 m long complete as per standard design: With common burnt clay F.P.S. ( non modular ) bricks of class designation 7.5 Each 1.00 Included
177 CIVIL WORKS 19.35.1 18% Providing and laying Non Pressure NP-3 class (Medium duty) RCC pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete 450 mm dia RCC pipes. Metre 36.00 Included
178 CIVIL WORKS 19.35.2 18% Providing and laying Non Pressure NP-3 class (Medium duty) RCC pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete 600 mm dia RCC pipes. Metre 18.00 Included
179 CIVIL WORKS 21.4.1 18% Providing and fixing double action hydraulic floor spring of approved brand and manufacture conforming to IS : 6315, having brand logo embossed on the body / plate with double spring mechanism and door weight upto 125 kg, for doors, including cost of cutting floors, embedding in floors as required and making good the same matching to the existing floor finishing and cover plates with brass pivot and single piece M.S. sheet outer box with slide plate etc. complete as per the direction of Engineer-in-charge: With stainless steel cover plate minimum 1.25 mm thickness each 30.00 Included
180 CIVIL WORKS 22.3 18% Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C., kitchen and the like consisting of: (i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with water proofing compound conforming to IS 2645 in recommended proportions including rounding off junction of vertical and horizontal surface. (ii) IInd course of 20mm cement plaster 1: 3 (1 cement: 3 coarse sand) mixed with water proofing compound in recommended proportion including rounding off junction of vertical and horizontal surface. (iii) IIIrd course of applying blown or residual bitumen applied hot at 1.7 kg. per sqm of area. sqm 118.00 Included
181 CIVIL WORKS 22.7.1 18% Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc. consisting of following operations: a) Applying a slurry coat of neat cement using 2.75 kg/sqm. of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer- in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120mm and minimum thickness at khurra as 65 mm. Sqm 1270.00 Included
182 CIVIL WORKS 15.3 18% Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Cum 20.56 Included
183 CIVIL WORKS NS 18% Providing and fixing CP Health faucet Jaquar Cat. No. ALD CHR-573 or eqivalent(make to be approved) with flexible pipe and wall hook with european Water Closet, complete in all respect. (Base cost= Rs. 1625.00 / unit-Including taxes) Each 14.00 Included
184 CIVIL WORKS NS 18% Providing and fixing of CP Bath Hand shower of Jaquar make or equivalent (make to be approved) of 105mm dia (Cat no. HSH-1717) with flexible shower tube of 1.5m length of Jaquar make Cat no. 549D8 and pipe and wall hook of Jaquar make cat no. 555, complete in all respect. (Base cost including shower, tube & wall bracket= Rs. 4300.00 / unit- Including Taxes) Each 18.00 Included
185 CIVIL WORKS NS 18% Providing and fixing of CP Wall Mixer of Jaquar make(Continental series) of Cat no. CON-273KNUPR or equivalent (make to be approved) including all accessories complete in all respect. (Base cost = Rs. 5350 / unit- Including Taxes) Each 18.00 Included
186 CIVIL WORKS NS 18% Providing and fixing of CP Wash basin Mixer of Jaquar make(Continental series) of Cat no. CON-167KNB or equivalent (make to be approved) including all accessories complete in all respect. (Base cost = Rs. 4000.00 / unit- Including Taxes) Each 32.00 Included
ELECTRICAL 1.10 18% Wiring for light point / fan point / exhaust fan point/call bell point with 1.5 sqmm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 Sq.mm. FRLS PVC insulated copper conductor single core cable etc as required. Included
ELECTRICAL 1.10.1 18% Group A Point 101.00 Included
ELECTRICAL 1.10.2 18% Group B Point 320.00 Included
ELECTRICAL 1.12 18% Wiring for light / power plug with 2X4 Sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit alongwith 1 No 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. Metre 1212.00 Included
ELECTRICAL 1.13 18% Wiring for light/power plug with 4X4 Sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit alongwith 2 Nos 4 Sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. Metre 1104.00 Included
ELECTRICAL 1.14 18% Wiring for circuit/submain wiring alongwith earth wire with the following sizes of PVC insulated copper conductor, single core cable in surface/recessed PVC conduit as required. Included
ELECTRICAL 1.14.1 18% 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire Metre 1612.00 Included
ELECTRICAL 1.14.4 18% 2 X 6 sq. mm + 1 X 6 sq. mm earth wire (For MCB Socket) Metre 1280.00 Included
ELECTRICAL 1.14.5 18% 2x10 sqmm +1x10 sq. mm earth wire (For submain) Metre 316.00 Included
ELECTRICAL 1.14.6 18% 2 X 16 sq. mm + 1 X 6 sq. mm earth wire Metre 25.00 Included
ELECTRICAL 1.14.11 18% 4 X 16 sq. mm + 2 X 6 sq. mm earth wire Metre 245.00 Included
ELECTRICAL 1.18 18% Supplying and drawing following pair, 0.5 Sq. mm FR PVC insulated copper conductor, unarmoured telephone cable in the existing surface/ recessed steel/ PVC conduit as required. Included
ELECTRICAL 1.18.2 18% 2 Pair Metre 758.00 Included
ELECTRICAL 1.19 18% Supplying and drawing co-axial TV Cable RG-6 grade 0.7mm solid copper conductor PE insulated, shielded with fine tinned copper braid and protected with PVC sheath in the existing surface/recessed steel/PVC conduit as required. Metre 690.00 Included
ELECTRICAL 1.21 18% Supplying and fixing of following sizes of PVC conduit along with accessories in surface/recess including cutting the wall and making good the same incase of recessed conduit as required for telephone and TV Points Included
ELECTRICAL 1.21.2 18% 25 mm Metre 1448.00 Included
ELECTRICAL 1.22 18% Supplying and fixing metal box of following sizes (nominal size) on surface or in recess with suitable size of phenolic laminated seet cover in front including painting etc as required. Included
ELECTRICAL 1.22.2 18% 100 mm X 100 mm X 60 mm deep Each 13.00 Included
ELECTRICAL 1.24 18% Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. Included
ELECTRICAL 1.24.1 18% 5/6 amps switch Each 134.00 Included
ELECTRICAL 1.24.4 18% 3 pin5/6 amp socket outlet Each 93.00 Included
ELECTRICAL 1.24.6 18% Telephone socket outlet Each 49.00 Included
ELECTRICAL 1.24.7 18% T.V. antenna socket outlet Each 49.00 Included
ELECTRICAL 1.24.8 18% Bell Push Each 14.00 Included
ELECTRICAL 1.25 18% Suplying and fixing stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc. as required. Each 78.00 Included
ELECTRICAL 1.27 18% Supplying and fixing following size/ modules, GI box along with modular base & cover plate for modular plate as required (for telephone and T.V. socket) Included
ELECTRICAL 1.27.1 18% 1 or 2 Module (75 mm X 75 mm) Each 49.00 Included
ELECTRICAL 1.27.2 18% 3 Module (100 mmX75 mm) Each 49.00 Included
ELECTRICAL 1.31 18% Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 3 pin 5/6 amps modular socket outlet and 5/6 amps modular switch, connection, painting etc. as required. Each 227.00 Included
ELECTRICAL 1.32 18% Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 6 pin 15/16 & 5/6 amps modular socket outlet and 15/16 amps modular switch, connection, painting etc. as required. Each 105.00 Included
ELECTRICAL 1.38 18% Supplying and fixing call bell/ buzzer suitable for D.C./A.C. single phase, 230 volts, complete as required. Each 14.00 Included
ELECTRICAL 1.41 18% Installation, testing and commissioning of pre-wired, fluorescent fitting/LED/ compact fluorescent fitting of all types, comlete with all accessories and tube etc. directly on celing/ wall, including connection with 1.5 Sq. mm FRLS PVC insulated, copper conductor, sigle core cable and earthing etc; as required. Each 67.00 Included
ELECTRICAL 1.35 18% Erection of wall bracket/ceiling fittings of all sizes and shapes containing LED lamps per fitting, complete with all accessories including connection etc. as required. Each 289.00 Included
ELECTRICAL 1.57 18% Supplying & fixing suitable size GI box wih modular plate and cover in front on surface or in recess including providing and fixing 25 A modular socket outlet and 25 A modular SP MCB, “C” curve including connections, painting etc. as required. Each 53.00 Included
ELECTRICAL 2.3 18% Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) Included
ELECTRICAL 2.3.2 18% 8 way , Double door Each 0.00 Included
ELECTRICAL 2.3.4 18% 16 way, Double door Each 12.00 Included
ELECTRICAL 2.4 18% Supplying and fixing following way, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) Included
ELECTRICAL 2.4.3 18% 8 way (4+24), Double door Each 1.00 Included
ELECTRICAL 2.1 18% Supplying and fixing 5 amps to 32 amps rating, 240 volts, 'C' series, miniature circuit brealer suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Included
ELECTRICAL 2.10.1 18% Single pole Each 332.00 Included
ELECTRICAL 2.14 18% Supplying and fixing following rating, double pole, (single phase and neutral ), 240 volts, residual current circuit breaker (RCCB), having a sensitivity current upto 300 miliamperes in the sxisting MCB DB complete with connections, testing and commissioning etc. as required. Included
7000016517 1860 1340 60 ELECTRICAL 2.16 998736 18% Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32amps 240 volts''C'' curve DP MCB complete with connections , testing and commissioning etc. as required. ( For Common Lights & Stairs) Each 4 Included 0.00 0 0
7000016517 1860 1340 70 ELECTRICAL 2.18 998736 18% Supplying and fixing 20 A, 240 V, SPN Industrial type socket outlet, with 2 pole and earth, metal enclosed plug top alongwith 20 A, “C” curve, SP, MCB, in sheet steel enclosure, on surface or in recess, with chained metal cover for the socket out let and complete with connections, testing and commissioning etc. as required. Each 55 Included 0.00 0 0
7000016517 1870 1390 10 ELECTRICAL 2.21 998736 18% Providing and fixing M.V. danger notice plate of 200 mm X 150 mm, made of mild steel, at least 2 mm thick, and vitreous enameled white on both sides, and with inscription in single red colour on front side as required. Each 4 Included 0.00 0 0
7000016517 1870 1390 20 ELECTRICAL 5.4 998736 18% Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonary enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal or coke and salt as required. Set 4 Included 0.00 0 0
7000016517 1880 1400 10 ELECTRICAL 5.11 998731 18% Providing and fixing 25 mm X 5 mm G.I. strip in 40 mm dia G.I. pipe from earth electrode including connection with GI nut, bolt, spring, washer excavation and re-filling etc. as required. Metre 25 Included 0.00 0 0
7000016517 1880 1400 20 ELECTRICAL 14.16 998731 18% Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc..direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc., complete as required. Included 0.00 0 0
7000016517 1880 1400 30 ELECTRICAL 14.16.5 998731 18% 200 mm dia (OD-200 mm & ID-175 mm nominal) Metre 18 Included 0.00 0 0
7000016517 1880 1400 40 ELECTRICAL Civil DSR 10.18 998731 18% Providing and fixing circular/ Hexagonal cast iron or M.S. sheet box for ceiling fan clamp of internal dia 140mm, 73mm height, top lid of 1.5mm thick M.S. sheet with its top surface hacked for proper bonding, top lid shall be screwed into the cast iron/M.S. sheet box by means of 3.3mm dia, round headed screws, one lock at the corners. Clamp shall be made of 12mm dia M.S. bar bent to shape as per standard drawing. each 78 Included 0.00 0 0
7000016517 1880 1400 50 ELECTRICAL 998731 18% Supply installation, testing and commissioning of Krone type tag block of 10 pair complete with back mount frame, modules, etc in a lockable metal box including connection etc, as required Each 5 Included 0.00 0 0
7000016517 1880 1400 60 ELECTRICAL 998736 18% Supplying prewired fluorescent fitting/LED fluorescent fitting surface/recess type stove enameled. Control gear duly wired complete and end plates/retainers in ready to use complete as required. (Fitting shall be supplied as per given ref. cat no or other equivalent approved make) Included 0.00 0 0
7000016517 1880 1400 70 ELECTRICAL 998736 18% 18W LED tube essential on batten (POWERGRID approved make) Each 67 Included 0.00 0 0
7000016517 1890 1401 10 ELECTRICAL 998731 18% 10W LED surface down lighter round Philips (POWERGRID approved make) Each 165 Included 0.00 0 0
7000016517 1890 1401 20 ELECTRICAL 998731 18% Bracket Light fitting complete with 7W LED Lamp Complete (POWERGRID approved make) Each 84 Included 0.00 0 0
7000016517 1890 1401 30 ELECTRICAL 998731 18% Bulk Head 9W (POWERGRID approved make) Each 12 Included 0.00 0 0
7000016517 1890 1401 40 ELECTRICAL 998731 18% Surface mounted 1x11W CFL mirror Lights (POWERGRID approved make) Each 27 Included 0.00 0 0
7000016517 1890 1401 50 ELECTRICAL 998731 18% Chandeliar Suspended Each 1 Included 0.00 0 0
7000016517 1900 1410 10 ELECTRICAL 998731 18% Supply installation testing and commissioning of cubical type compartmentalized meter board for 4 meters, made of 1.6mm thick sheet steel, duly powder coated, integral loose wire box complete with 1 no 63 Amp 4 Pole 25 KA MCCB, insulated copper bus bars, 200 amps capacity. Each meter having one No. 40 Amp DP MCB, with single phase 10/40 amp energy meter, prewired from bus bar upto connector block (for each quarter) in loose wire box/cable alloy, locking/ceiling arrangement for each compartment ) bus bar chamber etc., as required. set 4 Included 0.00 0 0
Total Installation Charges 0.00 0
Total GST as confirmed by Bidder 0.00
* In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 3
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-3 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage lum-sum 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 4
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Training Charges for Training to be imparted
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Training Charges excluding GST Total Training Charges excluding GST Total GST as confirmed by Bidder
Revaluation of J column Tax Calculation
NOT APPLICABLE Revaluation of J column Tax Calculation
Included 0.00 0 0
Total Training Charges 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 4b
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Maintenance Charges during & after Defect Laibility Period
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Maintenance Charges excluding GST Total Maintenance Charges excluding GST Total GST as confirmed by Bidder
0 Revaluation of P column Tax Calculation
A. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
B. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
Total Maintenance Charges during and after Defect Liabilty Period 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 5
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON GOODS Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable. 0.00
2 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4) 0.00 #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 5
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4a) and Maintenance Charges during and after Defect Liabilty Period (Schedule-4b)
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 6
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule - 6 After Discount
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Schedule 7
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-7 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.0000%
Type tests Charges:
SL. NO. PR No Line Item No Code HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total GST as confirmed by Bidder Revaluation of M column Tax Calculation Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
1 Included 0.00 0 0.00
2 Included 0.00 0 0.00
TOTAL TYPE TEST CHARGES 0.00
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
Bidder’s Name and Address (Lead Partner) :
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-7 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.0000%
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
(a) #REF! #REF! #REF! #REF! #REF!
(b) #REF! #REF! #REF! #REF! #REF!
Sub-Total (I) #REF!
TOTAL TEST CHARGES (I) #REF!
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Lead Partner) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Letter of Discount
LETTER OF DISCOUNT
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Sector-29, (near IFFCO Chowk)
Gurgaon (Haryana) - 122001
Subject : Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4a, Sch-4b & Sch-7] In Rs. 0.00 0.0000000000%
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4a, Sch-4b & Sch-7] In Percent (%) 0.00 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : Ex-Works Price 0.0000000000%
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance 0.0000000000%
Schedule-3 : Erection Charges In Rs. 0.00 0.0000000000% Schedule-3 : Erection Charges 0.0000000000%
Schedule-4a : Training Charges In Rs. 0.00 0.0000000000% Schedule-4a : Training Charges 0.0000000000%
Schedule-4b : Maintenance Charges during and after DLP In Rs. 0.00 0.0000000000% Schedule-4b : Maintenance Charges 0.0000000000%
Schedule-7 : Type Test Charges In Rs. 0.00 0.0000000000% Schedule-7 : Type Test Charges 0.0000000000%
4 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-3 : Erection Charges In Percent (%) 0.00 0.00%
Schedule-4a : Training Charges In Percent (%) 0.00 0.00%
Schedule-4b : Maintenance Charges during and after DLP In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00 0.00%
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Bid Form 2nd Envelope 0 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
Power Grid Corporation of India Limited 9 th #VALUE! 9 September
Northern Region Transmission System–I, Regional Headquarter, 10 th 10 October
SCO Bay No. 5 to 10, Sector 16A, 11 th 11 November
Faridabad-121002, Haryana 12 th 12 December
Name of Contract : Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 4b Maintenance Charges during & after Defect Laibility Period.
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 2
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him.
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY 0 0.00
B) CENTRAL SALES TAX 0 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
Excise Duty % as Excise Duty
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation Statement of Quoted / Corrected Prices Page
Spec. No. NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0 Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. 0 #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Name of Package : Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Specification No. : NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
Completion Period 18 Months
: Attachments : General guidelines for filling up the Attachments : Package - :
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Specification No.: NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR) 4, 4(A), 4(B), 5, 5(A), 6, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17,18 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : Not Applicable.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
7 Attachment-19, Attachment-20, Attachment-21, Attachment-22, Attachment-23, Attachment-24, Attachment-25 : To be submitted as per the provisions of the Bidding Documents ( Formats Attached seperately in Volume-III of Bidding Documents)
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Specification No.: NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Sole Bidder 1
Yes JV (Joint Venture) 2
Enter following details of the bidder No
Specify type of Bidder [Select from drop down menu] Sole Bidder Sole Bidder 2 0
Whether the bidder is an MSE (Micro & Small Enterprise) Joint Venture 2 2 0
Enter the Name of Registration Authority
Name of Sole Bidder
Address of Sole Bidder
Are you a ‘Local Suppliers’ under Public Procurement (Preference to Make in India) Order, 2017 and Order dated 20/12/2018 issued by Ministry of Power Yes
Full name of Bid Signatory
Designation of Bid Signatory
E-mail ID of Bid Signatory
Mobile No. of Bid Signatory Route-1 of Annexure-A(BDS)
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-3(JV) Sole Bidder
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept. &
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith. Sole Bidder
Date : -- Printed Name : 0
Place : Designation : 18
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-3(QR)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Qualifying Requirement Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
For our Qualifying Requirements Data, please refer Attachment-QR of this volume.
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) ATTACHMENT-3 (QR)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Qualifying Requirement Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name: Power Grid Corporation of India Ltd.,
Address: Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & Additional Information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details along with other information, as follows herewith our stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail).
We have submitted bid as :
We have submitted bid as joint venture of following firms :
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
C Whether bidder anticipate any change in legal structure/ ownership of their organisation at present. If Yes, please enclose details of same and copy of procedural document(s) with reference to the same/ as required statutorily, as of now
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Sole Bidder
1 Name of the Firm 0 0 #REF!
2 Head Office/ Registered Office Address 0 0 #REF!
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
1.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
1.1 TECHNICAL EXPERIENCE
1.1 Bidder should have Successfully# completed any project of institutional / commercial / Residential complex during last seven (7) years as on the originally scheduled date of bid submission as per following (i) Under one contract of value of not less than Rs. 443.34 Lakh excl GST OR (ii) Under two contracts each of value not less than Rs. 277.09 Lakh excl GST OR (iii) Under three contracts each of value of not less than Rs. 221.67 Lakh excl GST # Successfully completed means issue of provisional or final taking over certificate (TOC) by the Employer to the contractor for the referred contract.
Format for individual firm or for different Partner of a Joint Venture (JV):
Bidder’s Name : 0
Single Firm/Lead Partner/Other Partners of a JV :
1 Are you manufacturer of ventilation system
2 Name of Contract Undertaken
3 Contract Reference No. & Date of Award
4 Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
(a)(i) Scope of work executed under the above contract (Tick only whichever is/are applicable)
5 Details/features of the Contract undertaken relevant to the stipulated QR (as in Sl No (i) of 2.1
i) Capacity of the system
ii) Value of work Rs. in crore
6 Capacity in which the Contract was undertaken (Check One) (Tick whichever is applicable)
7 Date of Completion of Contract
8 Details of documents furnished in the Bid, in support of the aforesaid data/details/information
2.0 FINANCIAL REQUIREMENTS :
Financial Position {Reference Annexure-A (BDS)}
a) Net worth for last 3 financial years should be positive.
a) 2.0 Financial Position: a) Net worth of the bidders for last 3 financial years should be positive b) Minimum Average Annual Turnover @ (MAAT) for best 3 financial years out of last 5 financial years of the bidder shall not be less than INR 554.18 Lakhs excl GST Annual gross revenue from operation/gross operating income as incorporated in the Profit & Loss account, excluding other income / non-recurring income, i.e. sale of fixed assets. c)Bidder shall have liquid assets (L.A.) or/ and evidence of access to or availability of credit facilities of not less than Rs. 92.36Lakhs (excl GST)
As part of supporting documents for meeting financial parameters of QR, the bidder shall furnish along with its Bid, complete annual reports together with audited statements of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of the Bid. Note: (a) In the event the bidder is not able to furnish the information of its own (i.e. separate/standalone), the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (i.e. separate/standalone basis and exclusive of its Subsidiaries/Group/ Holding/ Parent Company) duly certified by any one of the authority (i) Statutory Auditor of the bidder (ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be. (b) Submission of provisional balance-sheet for latest financial year OR a certificate from the Chartered Accountant on their letterhead certifying the financial turnover/provisional balance sheet is not admissible 3. Requisite Technical and Financial Experience shall be of that Holding company only (i.e. excluding its subsidiaries/ group companies), in case bidder is a Group/ Holding/ Parent company, OR of that Subsidiary company only (i.e., excluding its holding company/ group companies), in case bidder is a Subsidiary of a holding company. 4. MSEs/STARTUPs meeting the specified Financial Position (i.e. MAAT requirement) shall also be considered qualified if they meet 80% (Eighty Percent) of the financial requirements specified. MSEs not meeting the Financial Qualifying Criteria shall also be eligible for consideration of award upto 25% of package award value as per "price preference" indicated in Bidding Documents.
* Note: (i) Annual total income as incorporated in the profit and loss account except non-recurring income e.g. sale of fixed assets. (ii) In case bidder is a holding company, the financial position criteria referred to in clause above shall be of that holding company only (i.e. excluding its subsidiary /group companies). In case bidder is a subsidiary of a holding company, the financial position criteria referred to in clause above shall be of that subsidiary company only (i.e. excluding it’s holding company).
c) Bidder shall have liquid assets (L.A) or/ and evidence of access to or availability of credit facilities of not less than Indian Rs. 2.23 Crore
Note: In case bidder is a holding company, the Financial Position referred to in clause 1.2 shall be of that holding company only (i.e. excluding its subsidiaries/ group companies). In case bidder is a subsidiary of a holding company, the Financial Position referred to in clause 1.2 shall be of that subsidiary company only (i.e., excluding its holding company).
The bidder shall submit complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid
{In support of its ‘Financial Position’, in line with the above, the Bidder must provide the relevant information in support of the same, along with documentary evidence, in the following format}
For Bidders to qualify for both the packages, their financial position shall not be less than the sum of the requirement for the packages they propose to qualify for.
4.0 Financial Qualification Data: 1
Name of the Bidder
B Turnover details:
Turnover (in Crores) Details of documentary evidence submitted in support of Qualification Data
Sl No Financial year
Do you have audited results for FY 2020-21 Yes
Average Annual Turnover for best Three Years is
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
Currency LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Networth Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Currency Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2012-13 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
B Turnover details:
Turnover Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Currency Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2012-13 Yes
Average Annual Turnover for best Three Years is
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
Currency LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
4.0 Joint Venture (JV) Firms {Reference para 3.0 of Annexure-A (BDS)}
4.1 In accordance with the above, in case of JV bidders, it should be ensured that necessary details including those pertaining to each JV partner are furnished and the documents are submitted alongwith the bid. Further, the JV bidders should also ensure that other requirements are complied with. The lists of documents furnished are to be indicated below :
5.0 The Bidder shall also furnish following documents/details with its bid. {Reference ITB clause 9.3 (c)}
5.1 The complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid.
Note I. In the event the bidder is not able to furnish the information of its own (i.e separate), being a subsidiary company and its accounts are being consolidated with its group/holding/parent company, the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (not of its group/Holding/Parent Company) duly certified by any one of the authority [ (i) Statutory Auditor of the bidder /(ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be.
II. Similarly, if the bidder happens to be a Group/Holding/Parent Company, the bidder should submit the above documents/information of its own (i.e. exclusive of its subsidiaries) duly certified by any one of the authority mentioned in Note-I above certifying that these information/documents are based on the audited accounts, as the case may be.
5.2 The Bidder should accordingly also provide the following information/documents (In case of JV bidders, information should be provided separately for all the Partners of JV in the given format):
Audited balance sheet and income statements for the last five years as per the following:
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed
1st Year Yes Yes
2nd Year Yes Yes
3rd Year Yes Yes
4th Year Yes Yes
5th Year Yes Yes
5.3 Whether bidder organisation is underway of Financial re-structuring. If Yes, please enclose the details of same and data/ documents establishing the same
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-4
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : -- Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-4(A)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-4(B)
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-5
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby furnish the details of the items/ sub-assemblies, we propose to buy for the purpose of furnishing and installation of the subject Package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
We hereby declare that, we would not subcontract the erection portion of the contract without the prior approval of Employer.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Annexure I to Attachment-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Annexure I to Attachment-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Details of the proposed sub-contractor/sub-vendor Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-5A
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder's Name and Address: Contracts & Materials dept.
Power Grid Corporation of India Ltd.,
Name : Northern Region–I, Regional Headquarter,
Address : SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1 We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
2 The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-5A
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-6
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-7
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Details of Alternative Bid)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
No Alternative Bid
Date : -- Printed Name :
Place : Designation :
NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-9
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Work Completion Schedule)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of contract
1 Detailed Engineering and drawing submission
a) commencement
2 Procurement of equipment/ components & assembly
a) commencement
a) commencement
4 Manufacturing
a) commencement
5 Shipments & Delivery
a) commencement
6 Establishment of site office
7 Installation at Site
a) commencement
8 Testing & Pre-commissioning
a) commencement
9 Trial Operation
a) commencement
Date : -- Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-10
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Guarantee Declaration)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Dear Sir, We declare that the equipments offered shall have minimum (or a maximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-11
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly, we hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation*
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : -- Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
SPEC. NO.: CC-CS/1059-NR3/GIS-4170/10/G7 ATTACHMENT-12
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Price Adjustment Data)
Bidder’s Name and Address (Sole Bidder) : To:
0 Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
PRICES REMAIN FIRMS AND FIXED
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-13
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-14
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Integrity Pact is annexed herewith this Volume.
Date : -- Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (o).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai,New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation Package and Specification Number NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) POWERGRID values full compliance with all relevant laws of the land, rules, regulations, economic use of resources, and of fairness / transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as unde r:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personal interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons.
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles during its participation in the tender process and during the contract execution:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or its subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter.
(10) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-15
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
Bidder’s Name and Address (Sole Bidder) : Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3 (a). Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3 (b). Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment /notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached. Please refer remarks at the end of the Attachment.
3 (c). If 3(b) is 'Yes', please mentiom whether you are (Proprietary MSE/ Partnership MSE/Private Limited Company) owned by SC/ST Entrepreneurs.
3 (d). Are you a MSE owned by a women in line with Public Procurment Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurment Policy for Micro & Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment / notification/order . (Indicate Yes/No)
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-16
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Additional Information)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
5.0 Details of Provident Fund Code Number of the Bidder [ref. ITB9.3(q)]
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-17
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-17
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. Northern Region–I, Regional Headquarter,
…… ……. …….. …… ……. …….. SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-17
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-18
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Safety Pact is attached herewith this Volume
Date : -- Printed Name :
Place : Designation :
Instruction for printing & submitting Safety Pact
1. The requisite format of Safety Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other six pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Safety Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (s).
Between #REF! #REF!
Power Grid Corporation of India Limited #REF! #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 1 having its Registered Office at ,
having its Registered Office at ,, 1 AND
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation Specification Number:NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 1 of 6
POWERGRID values full compliance with all relevant laws and regulations and the principles of Safety, Health& Environment in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder / Contractor enter into this agreement called “Safety Pact” which will form part of the Bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
POWERGRID commits itself to take all measures necessary to prevent accidents duringConstruction and Operation of the Transmission Assets and to observe the following:
1. POWERGRID recognizes and accepts its statutory responsibilities for ensuring construction, operation and maintenance of equipments and for the provision of safe methods of work and safe working conditions.
2. POWERGRID recognizes and accepts its statutory responsibilities for ensuring safety of not only its employees but also that of the Contracting Agencies as Principal Employer.
3. POWERGRID shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction as well as Operation & Maintenance of the Transmission Assets.
4. POWERGRID shall conduct necessary awareness and training programmes to its Employees to augment the various safety requirements to be followed during Construction and Operation & Maintenance of the Transmission Assets from time to time.
5. POWERGRID shall, from time to time, issue necessary guidelines,instructions and deterrents to its employees as well as to the Contracting Agencies, to update them to take necessary preventive measures to avoid repetition of similar accident attributes.
6. POWERGRID shall review and provide necessary guidanceto the Contracting Agencies, as and when, any abnormality / special situations are brought to its notice by the Contracting Agencies during execution of the Transmission Projects being executed by them.
7. POWERGRID shall conduct periodical surveillance site inspections / audits to identify the unsafe conditions and unsafe actions, and bring them to the knowledge of the Contracting Agencies for taking timely corrective actions.
8. POWERGRIDshall investigate all accidents, fatal as well as non-fatal, to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents, and fix responsibility for the lapses leading to the accident.
9. POWERGRID shall augment the training to the workers and supervising personnel of the Contracting Agencies, as per schedules, upon nomination by the Contracting Agencies in reasonable time frame.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 2 of 6
10. POWERGRID shall exercise the right to claim and recover compensation from the Contracting Agencies in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the applicable Laws and contractual specifications / guidelines in vogue / issued by POWERGRID from time to time.
Section II – Commitments of the Bidder / Contractor:
The Bidder / Contractor commits himself to take all measures necessary to prevent / minimise accidents at their construction / erection sites and to observe the following:
1. The Bidder / Contractor recognizes and acceptsthe statutory and comprehensive responsibility for ensuring safe construction and Testing & Commissioning in the Transmission Projects being executed by them by providing safe methods of work, working conditions and Tools & Plants for human safety.
2. The Bidder / Contractor recognizes and accepts the responsibilities for ensuring safety of not only their employees but also that of the Sub-contractors, Principal Employer and the general public during execution of the Transmission Projects / works.
3. The Bidder / Contractor shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction of the Transmission Assets.
4. The Bidder / Contractor shall endeavour continuous development of safe methods of work to ensure that the effect of risks and perils are minimised to the extent possible and implement the same at their worksites.
5. The Bidder / Contractor shall conduct periodical Training to their Employees as well as to that of their Sub-contractors for safety awareness during construction works being executed by them.
6. The Bidder / Contractor shall provide all requisite Tools & Plants required for the work and ensure their healthiness by periodical inspections / testing as required. Unhealthy and sub-standard Tools & Plants will be immediately removed from site as and when they are identified.
7. The Bidder / Contractor shall,at their cost, provide all necessary Personal Protective Equipments such as Double Lanyard Safety Belts, Appropriate Fall Arrest Systems, Safety Helmets, Foot Wear, Hand Gloves, etc., as required for various activities pertaining to execution of the Projects / works, confirming to relevant Indian Standards.
8. The Bidder / Contractor shall ensure that dedicated qualified Safety Officers are posted in the construction projects being executed by them and ensure that the Safety Officer visits each and every gang periodically and conducts audits / inspections to identify the unsafe conditions and unsafe actions, to be rectified by the site supervising personnel promptly.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 3 of 6
9. The Bidder / Contractor shall conduct appropriate medical checks-up for the workers before deploying them at their construction sites to ensure that only those who are medically fit are deployed in the Projects / works to be executed by them. The copy of the Medical Reports shall be provided by the Bidder / Contractor to POWERGRID, whenever requested by POWERGRID.
10. The Bidder / Contractor shall screen the workers before deploying them at their construction sites to ensure that only those with the skills, experience and competence to work at height and also medically fit for work at height are deployed for work at height in the Projects executed by them.
11. The Bidder / Contractor shall ensure daily before starting the work that their site Supervising Personnel / Safety Officer briefs the workers about the work for the day and the safety measures / precautions required to be taken by them.
12. The Bidder / Contractor shall investigate all the accidents at their working sites to ascertain the lapses leading to the incident and the precautionary / corrective measures required to be taken to avoid recurrence of such accidents. These accidents will be reviewed at the Board Management level of the Agencies and the findings / recommendations will be put up to POWERGRID Apex Safety Board within the stipulated period.
13. The Bidder / Contractor shall ensure that all accidents, whether fatal or non-fatal in nature, will be informed to POWERGRID, in writing, immediately on the occurrence of the same,and in any case, within not more than 24 hours of occurrence of the same.
14. The Bidder / Contractor shall ensure that in case of any accident, all necessary medical help / support shall be provided to the victims / injured till they are completely fit to return to work.
15. The Bidder / Contractor shall ensure that in case of fatal accidents, all statutory Authorities, including Police, concerned Labour Dept. Officials, concerned Workmen Compensation Commissioner, etc., will be intimated in writing as required by the statutory Law, and followed up for compliance of all statutory obligations. The Bidder / Contractor shall own full responsibility of timely accident reporting to various authorities, including POWERGRID.
16. The Bidder / Contractor shall ensure that in case of fatality or serious injury leading to permanent disablement of the victims, the compensation amount will be deposited with the concerned authorities, as required by the Laws, and followed up for early disbursement to the beneficiaries of the victims.
17. The Bidder / Contractor assures that they shall co-operate to the fullest extent for carrying out any investigation of the accidents at their work sites by POWERGRID to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents. All factual details of the occurrence of the accident will be provided to POWERGRID, as and when required.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 4 of 6
18. The Bidder / Contractor assures that they take full responsibility of meeting the statutory obligations in case of accidents, and in case of any reference by any Statutory Body at a later date also, they shall provide all information to POWERGRID and meet all the statutory obligations, including payment of additional compensation, if any.
19. The Bidder / Contractor assures that in case of any inspection of their work site or Notice by any Statutory Authority, they shall comply promptly and inform POWERGRID Site Officials of the same, and also provide all necessary information and assistance for smooth compliance of the observations / instructions of such Authorities.
20. The Bidder / Contractor accepts the provisions regarding safety, including payment of any sums to POWERGRID, in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the Contractual Conditions, Safety Planand the Safety Pact, and confirm to abide by the same.
Section III – Equal treatment to all Bidders / Contractors:
1. POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
2. POWERGRID will disqualify, from the tender process, any bidder/ take punitive actions on the bidder, who does not sign this Pact or violate its provisions.
Section IV – Pact Duration:
This Pact begins when both parties have legally signed it. It expires for the successful Bidder / Contractor after closure of the contract and, for all other Bidders, after the contract has been awarded.
Section V – Other Provisions:
1. This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under the Safety Pact.
2. Changes and supplements need to be made in writing, which shall come into force only upon mutual agreement / acceptance.
3. If the Contractor is a partnership firm or consortium of Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venue partners, as applicable as per the Tender Specifications.
4. Nothing in this agreement shall affect the rights of the parties available under General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
5. Should one or several provisions of this agreement turn out to be invalid, the reminder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Safety Pact Page 5 of 6
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Safety Pact Page 6 of 6
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Attachment-19
Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation
Bidder’s Name and Address (Sole Bidder) : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-CIVIL/DOM/I00/25/03566 (RFX- 5002004330) Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : -- 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contracts & Materials dept. 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
Northern Region–I, Regional Headquarter, 11 eleven 11 th 11 November
SCO Bay No. 5 to 10, Sector 16A, 12 twelve 12 th 12 December
Faridabad-121002, Haryana 13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Construction of 13 Nos. residential quarters at 765/400 kV Jatikara Substation 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. dated 00/01/1900 the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2.
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Pay Order 19 nineteen 19 th
(a) Attachment 1 : Bid Securing Declaration Banks certified Cheque Zero 20 twenty 20 th
Or Online Payment Acknowledgement towards Bid Security for a sum of INR
Or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II
(b) Attachment 2: A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3 : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). #REF! Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 #REF! Not Applicable 24 th
(d) Attachment 4 : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5 : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A : Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises
(g) Attachment 6 : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(h) Attachment 7 : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 28 th
(i) Attachment 8 : Manufacturer’s Authorisation Forms. 29 th
(j) Attachment 9 : Work Completion Schedule. 30 th
(k) Attachment 10 : Guarantee Declaration. 31 st
(l) Attachment 11 : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12 : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13 : Declaration regarding Social Accountability.
(o) Attachment 14 : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15 : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16 : Additional Information.
(r) Attachment 17 : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18 : Declaration
(t) Attachment 19 : Declaration of Key Managerial Person jointly with Power of Attorney holder
(u) Attachment 20 : Affidavit
(v) Attachment 21: Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1
(w) Attachment 22: Certification by the Bidder per DoE Order in line with ITB Clause 2.1
(x) Attachment 23: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order and MoP Order, if applicable
(y) Attachment 24: Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order and MoP Order, if applicable
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, In-transit insurance, unloading, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) GCC 2.14 Governing Law
(b) GCC 5 Contractor’s Responsibilities
(c) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 2
13.0 We are a Micro and Small Enterprise (MSE) registered with , a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020 read in conjuction with related notifications issued from time to time for such enterprises. 2
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
#REF! Printed Name :
#REF! Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Checklist for Bid Submission
1 Certificate regarding Constitution of firm/ Certificate of Incorporation To be submitted in Soft Copy.
2 Soft copy of Attachments & Bid Form Duly Filled Excel Sheet of Attachment and Bid Form to be uploaded in Soft Copy along with Bid. To be submitted in Soft Copy.
3 Power of Attorney (POA) Duly notarized (on Stamp Paper of requisite value), indicating that the person(s) signing the bid has(ve) the authority to sign the bid In case of bid submitted by a Joint Venture of two or more firms as partners, if allowed as per stipulated Qualification Requirements in Annexure-A (BDS), bidder shall submit. Power of Attorney for Joint Venture and Joint Venture Agreement as per given format Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
4 Affidavit of Proprietorship (applicable only for proprietorship firm) Duly notarized (on Stamp Paper of requisite value) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
5 Tender Fees/ Cost of Bid Documents ₹NIL; Demand Draft or Online Payment Acknowledgement towards the cost of Bidding Documents pursuant to ITB 5.4 Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
5 MSE Status Certificate (if applicable) In case of UAM/ Udyam Registration, Bidder has to submit the Complete Audited Account Statements (Balance Sheet and Profit and Loss Account) for verification purpose. To be submitted in Soft Copy.
6 Bid Security The bid security shall, at the bidder’s option, be in the form of a crossed bank draft/pay order /banker certified cheque in favour of Employer or a bank guarantee from a reputed bank selected by the bidder. The format of the bank guarantee shall be in accordance with the form of bid security included in the Bidding Documents. Bid security shall be valid upto 31/01/2022. The Bid Security shall be in favour of Power Grid Corporation of India Limited payable at Jammu Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
7 Attachment-8: Manufacturers Authorization Form On Manufacturer’s Letterhead, see Clause 9.3(i) of the ITB (The letter of Undertaking should be on the letterhead of the Manufacturer and should be signed by a person competent) To be submitted in Soft Copy.
8 Attachment-14: Integrity Pact To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
7 Attachment-18: Safety Pact To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
8 Attachment-14: Intigrity Pact To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
9 Attachment 19: Declaration of Key Managerial Person jointly with Power of Attorney holder Signed by CEO/Managing Director/Company Secretary/ Director/ CFO/ any of the partner in case of partnership firm/ any other officer entrusted with substantial powers of the management of the affairs of the company/firm and POA Holder Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
10 Attachment-22: Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1. (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture) On Firm/Company's Letterhead To be submitted in Soft Copy.
10 Attachment-24: Compliance to the process related to the e-RA Terms & Conditions and the Bussiness Rules governing the e-RA. On Firm/Company's Letterhead To be submitted in Soft Copy.
11 Attachment-23: Certification by the Bidder as per order no. F.No.6/18/2019-PPD dated 23/07/2020 issued by Public Procurement Division, Department of Expenditure, Ministry of Finance, Government of India (DoE Order) in line with ITB 2.1 (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture) On Firm/Company's Letterhead To be submitted in Soft Copy.
11 Bidders shall submit the complete audited financial statements of last 05 years for calculation of MAAT Annual Reports for FY 2016-17, FY 2017-18, FY 2018-19, FY 2019-20, FY 2020-21 To be submitted in Soft Copy.
12 Attachment 24: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII Order and MoP Order (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture) To be submitted on a non-judicial stamp paper of Rs. 100/-. Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
13 PF Registeration Details To be submitted in Soft Copy.
NOTE: This checklist is not exhaustive and issued for the purpose of reference Only. In case of any ambiguity, the provisions of Bidding Documents shall prevail.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Price_schedule.xlsx
xlsx • 1.58 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
02 Section - II ITB SSTE civil(Feb 2019).docx
docx • 0.09 MB
03 Section - III_BDS Civil 1.docx
docx • 0.07 MB
04-Annexure-A (BDS).docx
docx • 0.02 MB
04-Annexure-B(BDS) Vol-I.docx
docx • 0.05 MB
04-Annexure-C(BDS) Vol-I.docx
docx • 0.04 MB
05-Section-IV-GCC-civil works(Feb 2019).doc
doc • 0.37 MB
06 Section - V SCC Civil Vol-I.docx
docx • 0.06 MB
07-Appendix-I to SCC.doc
doc • 0.24 MB
08-Appendix-II to SCC.docx
docx • 0.04 MB
09-Section - VI Forms and Proceedures Civil.docx
docx • 0.12 MB
~$-Annexure-A (BDS).docx
docx • 0.00 MB
~$-Section - VI Forms and Proceedures Civil.docx
docx • 0.00 MB
compressed_TS.pdf
pdf • 4.46 MB
SOW.pdf
pdf • 0.62 MB
01-First Envelope Attachments and Bid Form.xlsx
xlsx • 1.33 MB
04 Attachment-14 Integrity Pact.docx
docx • 0.03 MB
05-Attachment 18-Safety Pact.docx
docx • 0.03 MB
06_Attachment 19-KMP Declaration.docx
docx • 0.02 MB
07_Attachment 21-Affidavit for correctness.docx
docx • 0.02 MB
08_Attachment 22 Declaration regading event encountered.docx
docx • 0.04 MB
09_Attachment 23 Certificate by bidder for DOE order.docx
docx • 0.02 MB
10_Attachment 24_Affidavit for self-certification_PPP - MII Order.docx
docx • 0.02 MB
11-Attachment-25-Compliance to the process related to the e-RA.docx
docx • 0.02 MB
12_Checklist.xlsx
xlsx • 0.01 MB
13_Legends for Units.pdf
pdf • 0.03 MB
STRUC.B2 SHEET 1 JHATIKARA.pdf
pdf • 0.68 MB
STRUC.B2 SHEET 2 JHATIKARA.pdf
pdf • 0.54 MB
STRUC.B3 SHEET 1 JHATIKARA.pdf
pdf • 0.71 MB
STRUC.B3 SHEET 2 JHATIKARA.pdf
pdf • 0.53 MB
STRUC.B3 SHEET 3 JHATIKARA.pdf
pdf • 0.23 MB
STRUC.C SHEET 1 JHATIKARA.pdf
pdf • 0.58 MB
STRUC.C SHEET 2 JHATIKARA.pdf
pdf • 0.50 MB
STRUC.C SHEET 3 JHATIKARA.pdf
pdf • 0.26 MB
STRUC.D SHEET 1 JHATIKARA.pdf
pdf • 0.71 MB
STRUC.D SHEET 2 JHATIKARA.pdf
pdf • 0.54 MB
STRUC.D SHEET 3 JHATIKARA.pdf
pdf • 0.38 MB
ARCH .D SHEET 2 JHATIKARA.pdf
pdf • 1.13 MB
ARCH.B2 SHEET 1 JHATIKARA 02112021.pdf
pdf • 1.37 MB
ARCH.B2 SHEET 2 JHATIKARA.pdf
pdf • 0.67 MB
ARCH.B3 SHEET 1 JHATIKARA.pdf
pdf • 0.67 MB
ARCH.B3 SHEET 2 JHATIKARA.pdf
pdf • 0.64 MB
ARCH.C SHEET 1 JHATIKARA.pdf
pdf • 0.43 MB
ARCH.C SHEET 2 JHATIKARA.pdf
pdf • 0.71 MB
ARCH.D SHEET 1 JHATIKARA.pdf
pdf • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .