| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
11 May 2023, 2:00 pmClosed
Executive Engineer Hosur
Executive Engineer Hosur rayakottai road hosur
02 nos HT LT line deviation and 01 no Existing str shifting at various village in Sipcot 1 section
2023_EB_311341_1
HSR/024/05.05.2023/HT LT line devi sipcot-1
Open Tender
Electrical Works
Works
180 days
HOSUR
Should be TNEB Registered Contractor
2 documents required · 2 mandatory
₹0
₹1,500
Yes
17 May 2023
5 May 2023
12 May 2023
5 May 2023
11 May 2023
5 May 2023
5 May 2023 - 11 May 2023
Amount
Excavation of pole pit for upto 8.23 mt pole
Excavation of pole pit for above 8.23 mt pole
Erection of RCC,REC,PSC pole upto 8.23 mt length
Erection of RCC,REC,PSC pole above 8.23 mt length
Erection of Stay set including excavation of pit
Fixing of Vxarm 3.5/4.5/5.0 with TI Fitting and Insulator(11/22/33KV)
Fixing of Single Phase Cross Arm with materials
Fixing of Three Phase Cross Arm with materials
Fixing of 2 Nos Flat / Vxarm with Material in Cut point (11/22/33KV)
Paving and Stringing of conductor of 1-run size upto ACSR 7/2.59 (or) AAAC 7/2.50
Paving and Stringing of conductor of 1-run size upto ACSR 7/2.59 (or) AAAC 7/3.35
Ertection of 10 cents distribute transformer str as per TANGEDCO std with all respects
Dismantling of poles all types / Sizes
Dismantling of Stay set including rod
Dismantling of conductor of one run size upto ACSR 7/3.35 with alla respects
Dismantling of conductor of one run size above ACSR 7/3.35 with alla respects
Dismantling of Xarm and materials ( all Types and Sizes)
Dismantling of Structure
Transportation of all types of poles by Bullock cart or Other vehicle including loading and Unloading upto 5 KM
AB Switch and open type side arm Std cutting and Drilling of Holes
Manufacturing of earth pipe clamps for stru cture including drilling of holes welding with pipe etc
Erecton of Distribution Transformer 250/100/25/16 KVA
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .