| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹2.4 L (1.71%)Admitted-Finance | ₹1.4 Cr+₹2.4 L (1.71%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹11.1 L (7.82%)Admitted-Finance | ₹1.5 Cr+₹11.1 L (7.82%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹12.4 L (8.74%)Admitted-Finance | ₹1.5 Cr+₹12.4 L (8.74%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹19.5 L (13.8%)Admitted-Finance | ₹1.6 Cr+₹19.5 L (13.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DHARANI HITECH PROJECTS PVT LTD L1 | M Rajagopal L2 | M.GANESAN L5 | sivanesan engineering cotractor L6 | T T K CONSTRUCTION L4 | A PRABAHAR L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual meansin f oundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. and back filling in sides of foundation etc. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. All kinds of soil. | |||||||||
| 1.01 | Lift upto 1.5 m, | 1,086 | Cum | 250 ₹2,71,500 | 199 ₹2,16,114 | 100 ₹1,08,600 Lowest | 250 ₹2,71,500 | 200 ₹2,17,200 | 250 ₹2,71,500 |
| 1.02 | Bottoms lift above 1.5 m to 3.00m, including pumping out water as required | 205 | Cum | 100 ₹20,500 Lowest | 226 ₹46,330 | 300 ₹61,500 | 300 ₹61,500 | 300 ₹61,500 | 300 ₹61,500 |
| 2.00 | Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete measurements to be taken of the face area timbered):Depth exceeding 1.5 m but not exceeding 3 m. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. | 290 | Sqm | 70 ₹20,300 | 37 ₹10,730 Lowest | 350 ₹1,01,500 | 72 ₹20,880 | 90 ₹26,100 | 75 ₹21,750 |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations & footings, bases. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. | 263 | Sqm | 300 ₹78,900 | 253 ₹66,539 Lowest | 500 ₹1,31,500 | 285 ₹74,955 | 310 ₹81,530 | 310 ₹81,530 |
| 4.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. | |||||||||
| 4.01 | Cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) / M.sand : 6 graded stone aggregate 20 mm nominal size)of specified gradeExtra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. | 342.99 | Cum | 5,400 ₹18,52,146 | 6,202 ₹21,27,223.98 | 5,500 ₹18,86,445 | 6,260 ₹21,47,117.4 | 6,550 ₹22,46,584.5 | 5,000 ₹17,14,950 Lowest |
| 5.00Centering and shuttering including strutting, propping etc. and removal of form work for (For Under ground sump and miscellanious work ). inclusive cost of supply of all materials, labours, tools and all other charges etc complete. | |||||||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete | 115 | Sqm | 300 ₹34,500 | 253 ₹29,095 Lowest | 500 ₹57,500 | 284 ₹32,660 | 310 ₹35,650 | 310 ₹35,650 |
| 5.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | 1,258 | Sqm | 500 ₹6,29,000 | 451 ₹5,67,358 | 500 ₹6,29,000 | 609 ₹7,66,122 | 500 ₹6,29,000 | 400 ₹5,03,200 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
6 Oct 2021, 3:00 pmClosed
The Director
Directorate of lighthouses and lightships, Deep Bhavan, 5/20 Jaffer syrang street, Chennai
Construction of RCC compound wall and improvement works at Kodiakkarai Lighthouse
2021_DGLL_647362_1
DW-CHE-01001(13)/1/2020-Civil Maintenance
Open Tender
Civil Works
Works
180 days
Kodiakkarai, Tamilnadu
appropriate class contractors registered with CPWD, State PWD, Railways, MES, BSNL etc or with any other State/Central Government/Public sector undertaking/Autonomous bodies having experience and expertise
2 documents required · 2 mandatory
₹1,000
The Director, Directorate of Lighthouses
₹3.2 L
Chennai
3 Nov 2021
10 Sept 2021
7 Oct 2021
10 Sept 2021
6 Oct 2021
10 Sept 2021
28 Sept 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual meansin f oundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. and back filling in sides of foundation etc. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. All kinds of soil.
Lift upto 1.5 m,
Bottoms lift above 1.5 m to 3.00m, including pumping out water as required
Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete measurements to be taken of the face area timbered):Depth exceeding 1.5 m but not exceeding 3 m. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations & footings, bases. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) / M.sand : 6 graded stone aggregate 20 mm nominal size)of specified gradeExtra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Centering and shuttering including strutting, propping etc. and removal of form work for (For Under ground sump and miscellanious work ). inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
Providing and laying in position specified grade 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) /M.sand: 3 graded stone aggregate 20 mm nominal size). of reinforced cement concrete, mixing water proofing material in cement concrete per 50 kg work in doses by weight of cement as per manufacturer's specification. excluding the cost of centering, shuttering, finishing and reinforcement - All work for foundation and up to Ground level. Supply of all labour, materials, tools & plants etc., complete.
All work up to Ground level :
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement (superstucture) 1:1.5:3 3 Gradestone 20mm(1 cement : 1.5 coarse sand (zone-III) /M.sand: 3 graded stone aggregate 20 mm nominal size).Supply of all labour, materials, tools & plants etc., complete.All work above Ground level.
Supply and Fabrication of Thermo-Mechanically Treated bars of grade Fe-500D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. For foundation and superstructure. Supply of all labour, materials, tools & plants etc., complete.
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). inclusive cost of supply of all materials, labours, tools & plants and all other charges etc complete.
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : Cement mortar 1:3 (1 cement : 3 coarse sand).inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand/P-sand). including supply of all materials, labour, tools & plants and all other charges etc., complete.
Applying one coat of water thinnable cement primer of approved brand and manufacture (Asian / Berger) on wall surface : Water thinnable cement primer, inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Applying walls with water proofing cement paint two coats of approved brand and manufacture (Asian / Berger), including applying additional coats wherever required to achieve even shade and colour inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Painting with synthetic enamel paint two coats of approved brand and manufacture (Asian / Berger) to give an even shade :including applying additional coats wherever required to achieve even shade and colour inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Painting with synthetic enamel paint two coats of approved brand and manufacture (Asian / Berger) to give an even shade under a coat of zinc chromate primer :including applying additional coats wherever required to achieve even shade and colour. inclusive cost of supply of all materials, labours, tools and all other charges etc complete. ( for steel surface )
Supplying and fixing all welded c-class G.I. Pipe main gate 3.75 m width and wicket gate 0.92 as per approved drawing complete.inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Providing and fixing cavity 110mm wide in RCC walls with necessary weep and vent holes including use of Pvc pipes and cost of providing and fixing pvc pipe 110 mm dia with MS ties rods 10mm dia Avg 350 mm long in section at not less than 3 ties per sqm as per approved design.Inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Filling, spreading borrowed with good quaily earth / murrum in low lying area. Including levelling, ramming, consolidation and dressing etc by maually.Inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete.Supply of all labour, materials, tools & plants etc., complete.
Dismantling of MS gate without damaging the other part of the stucture. including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Demolishing R.C.C. work column pillars/ posts manually/ by mechanical means by ( core cutter up to 30cm/ 150 mm dia )including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.inclusive cost of supply of all materials, labours, tools and all other charges etc complete.
Demolishing existing brick work compound wall manually/ by mechanical means including spreading, levelling in the low lying areas inside the Lighthouse premises/ compound as per direction of Engineer-in-charge including supply of all materials, labour, tools and plants, scaffolding, ladder etc. complete.
Applying two coat of coal tarring/ bitumen paint on concrete surface upto plinth with approved first quality to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops including brushes, scaffolding, ladder supply of all materials, labour, tools & plants and all other charges etc., complete .
Providing and fixing in position pre-moulded joint filler in expansion jointsas directed including brushes, scaffolding, ladder supply of all materials, labour, tools & plants and all other charges etc., complete .
M Rajagopal
A PRABAHAR
T T K CONSTRUCTION
M.GANESAN
sivanesan engineering cotractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TDKDK21.pdf
Tender Documents • 0.53 MB
BOQ_681393.xls
BOQ • 0.29 MB
KDKDwg.pdf
Additional Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .