| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC Quoted lowest amount | |
| 2 | L2₹9.7 L+₹36,600 (3.92%)Rejected-Finance | L2 | Rejected-Finance Rejected
because it
has been
found
second
lowest
quoted
amount | |
| 3 | L3₹9.8 L+₹51,100 (5.47%)Rejected-Finance | L3 | Rejected-Finance Rejected
because it
has been
found third
lowest
quoted
amount |
Tender Value
₹9.3 L
EMD Value
₹46,570
Closing Date
9 Sept 2020, 2:00 pmClosed
Unit In- Charge
Add- Camp Office, 17-H Ashok Vihar Colony Paharia Varanasi 221007
Labour Charges for construction of boundary wall and theory room at Govt. ITI Siddikpur,Jaunpur.
2020_UPRNN_507537_1
27/e-Tender/RNN/Bhadohi Unit/20
Open Tender
Civil Works - Buildings
Item Rate
45 days
Siddikpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
U. P. Rajkiya Nirman Nigam lt.
₹46,570
12 Oct 2020
2 Sept 2020
9 Sept 2020
2 Sept 2020
9 Sept 2020
2 Sept 2020
Amount
Labour Charges
Labour Charges for jungle clearance including derooting as per P.W.D. detail specification & direction of E/I.
Labour Charges for Layout of building including marking centre line as required at site per direction of E/I.
Labour Charges for laying PCC 1:4:8 as specified mix in foundation or in under floor including compaction as per direction of E/I.
Labour Charges for RCC work in foundation,raft grade beam boundary wall beam etc specified mix including compaction as per direction of E/I. (1:1.5:3)
Do as above item but in super structure
Labour Charges for making Bench Mark upto 45cm height
Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating barrier under all round the column pits.,wall trenches,basement excavation top surface it plinth filling junction of wall and floor along the external area of building at ground floor only shall be measured as per IS6313part-2 1981
Fixing and removal of shuttering wooden/steel including its hire charges and supply of all material ,nails,shuttering oils ,cotton waste etc complete required for proper completion of work . For foundation,pedestal,grade beam etc.
Same as item no 1.08 but in Beams and Lintels
Same as item no 1.08 but in Columns
Hire Charges for supply of Earth excavator (JCB)
Labour Charges for Curing Man
Labour Charges for Shifting of material by head load upto 50 mt only A-Cement
Do as above item 1.10 for B-General material
Do as above item 1.10 for C- Steel
PARAG TECHNOBUILD PVT.LTD.
M/S NUTRITIOUS GLACIER ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .