| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹6.2 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹7.0 CrRejected-Finance | ₹7.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹7.1 CrRejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 UDYAM JK 22 0002496 01AFRPJ1985K1Z4 R M | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹7.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹7.2 CrRejected-Finance SAKARDAHA PURANI BAZAR JANPAD PRATAPGARH | PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹7.2 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹7.2 CrRejected-Finance NAN | ₹7.2 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISES L3 | M/S CHAUDHARY ENTERPRISES L1 | M/S ADITYA CONSTRUCTION L4 | M/s Bajrang Construction & Suppliars L5 | M/S VIVEK KUMAR SINGH L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation for side wall, toe wall, drain etc. in all type of soil, kanker, chhurry, bazari ,slush and dewatering etc. with all leads and lifts and proper disposal of excavated earth as per direction of Engineer-in-charge including cost of all material labour and T&P etc. required for proper completion of the work. | 8,763.31 | M3 | 120 ₹10.5 L | 106 ₹9.3 L | 201 ₹17.6 L | 206 ₹18.1 L | 199.18 ₹17.5 L |
| 2.00 | Centering and shuttering for C.C and RCC work including cost of all material, labour and T&P. etc. required for proper completion of work. | 3,949.9 | M2 | 960 ₹37.9 L | 750 ₹29.6 L | 975 ₹38.5 L | 985 ₹38.9 L | 953.42 ₹37.7 L |
| 3.00 | Providing and laying C.C. M-15 (1:2:4) with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.75 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work. | 267 | M3 | 7,000 ₹18.7 L | 6,000 ₹16.0 L | 7,000 ₹18.7 L | 6,995 ₹18.7 L | 6,753.21 ₹18.0 L |
| 4.00 | Providing and laying C.C. M-20 (1:1.5:3) with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.25 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work. | 1,077.1 | M3 | 7,360 ₹79.3 L | 7,000 ₹75.4 L | 7,500 ₹80.8 L | 7,365 ₹79.3 L | 7,107.23 ₹76.6 L |
| 5.00 | Providing and laying R.C.C. M-25 (1:1:2) with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.25 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work. | 2,184.72 | M3 | 8,900 ₹1.9 Cr | 8,000 ₹1.7 Cr | 9,000 ₹2.0 Cr | 8,890 ₹1.9 Cr | 8,582.81 ₹1.9 Cr |
| 6.00 | Providing and laying R.C.C. M-30 with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.25 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work. | 7.52 | M3 | 8,900 ₹66,928 | 8,800 ₹66,176 | 8,800 ₹66,176 | 8,890 ₹66,852.80 | 8,582.81 ₹64,542.73 |
| 7.00 | Laying R.C.R stone masonery lining with (1:4) cement & course sand motar including all cost of meterial labour, T&P taxes ect required for proper completion of work. | 284.07 | M3 | 4,753 ₹13.5 L | 4,600 ₹13.1 L | 4,800 ₹13.6 L | 4,870 ₹13.8 L | 4,703.65 ₹13.4 L |
| 8.00 | Cutting, Bending, Binding and placing reinforcement including cost of all materials, labour T & P etc. required for proper completion of work. | 279 | MT | 65,500 ₹1.8 Cr | 62,800 ₹1.8 Cr | 62,500 ₹1.7 Cr | 62,822.2 ₹1.8 Cr | 60,623.42 ₹1.7 Cr |
| 9.00 | Ist Class brick work in 1:4 cm with approved courase sand including all cost of material, labour T&P etc all complete. | 119 | M3 | 6,744 ₹8.0 L | 6,500 ₹7.7 L | 6,800 ₹8.1 L | 6,880 ₹8.2 L | 6,642 ₹7.9 L |
| 10.00 | 12.5 mm thick plaster in 1:4cm over B/W including all cost of material labour T&P etc all complete. | 184 | M2 | 170 ₹31,280 | 120 ₹22,080 | 170 ₹31,280 | 175 ₹32,200 | 172.2 ₹31,684.80 |
Tender Value
Refer Docs
EMD Value
₹14.4 L
Closing Date
13 Feb 2026, 3:30 pmClosed
SE ICC MAHOBA
SE ICC BAZARIYA MAHOBA
Construction of Barrel cum Aqueduct at km. 15.795 of Gunta Main Canal
2026_UPIDC_1112058_1
07/SE/2025-26
Open Tender
Civil Works
365 days
CHITRAKOOT
As per tender nit and tender document
2 documents required · 2 mandatory
₹8,614
₹14.4 L
6 Apr 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
Earth work in excavation of foundation for side wall, toe wall, drain etc. in all type of soil, kanker, chhurry, bazari ,slush and dewatering etc. with all leads and lifts and proper disposal of excavated earth as per direction of Engineer-in-charge including cost of all material labour and T&P etc. required for proper completion of the work.
Centering and shuttering for C.C and RCC work including cost of all material, labour and T&P. etc. required for proper completion of work.
Providing and laying C.C. M-15 (1:2:4) with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.75 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work.
Providing and laying C.C. M-20 (1:1.5:3) with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.25 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work.
Providing and laying R.C.C. M-25 (1:1:2) with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.25 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work.
Providing and laying R.C.C. M-30 with cement, coarse sand (F.M. more than 2.0) and graded Bharat Koop stone grit 4.25 to 20mm size using through batching plant and mechanical vibrator,, including cost of all material labour and T&P etc. required for proper completion of the work.
Laying R.C.R stone masonery lining with (1:4) cement & course sand motar including all cost of meterial labour, T&P taxes ect required for proper completion of work.
Cutting, Bending, Binding and placing reinforcement including cost of all materials, labour T & P etc. required for proper completion of work.
Ist Class brick work in 1:4 cm with approved courase sand including all cost of material, labour T&P etc all complete.
12.5 mm thick plaster in 1:4cm over B/W including all cost of material labour T&P etc all complete.
Laying and fixing joint filler board 18 mm thick including cost of all material, labour, T&P. etc. required for proper completion of work.
Laying and fixing PVC water stop 300 mm wide as per direction of Engineer-in-charge including cost of all material, labour, T&P etc. complete.
Providing expansion joint in concrete including placing and fixing of angle iron of size 75x75x10 and filling with bitumen including cost of all material, labour, T&P etc. complete.
Providing and fixing Dimond seal in position including cost of all materials, labours, T& P etc. required for proper completion of work . rate per RM.
Filling bitumen compound in joints of daimond seal including cost of sealing compound, labours, T& P etc. required for proper completion of work rate per Kg.
Supplying and laying coarse sand including cost of all materials, labours, T&P etc. required for proper completion of work.
E/w in filling by power transported earth lead upto 1.0 km. and lift upto 1.5 m. including cost of loading, unloading, proper manual compaction, labour, T&P etc. required for proper competion of work.
Supplying and Laying Shankergarh stone boulder weight (25.00 to 60.00 kg) in launching apron with proper position required for proper completion of work as per direction of Engineer-in-Charge including cost of all materials,labour, lead & lift , royality and T&P etc. all complete.
Supplying and laying GEO textile sheet 240GSM including cost of all materials, labour , T & P, taxes etc, required for proper completion of work. as per direction of Engineer- in- charge.
Supplying and laying 25 to 60 Kg stone boulder pitching including cost of all materials, labour , T & P, taxes etc, required for proper completion of work. as per direction of Engineer- in- charge.
Preparation of subgrade for lining work including all cost of labour, T&P, Taxes etc. required for proper completion of work.
Supplying and laying 200 micron thick LDPE film on subgrade, complete in all respect, as per direction of Engineer-in- charge, including cost of all materials, taxes, carriage, labour and T&P charges required for proper completion of the work.
Making weep hole including filling with material including all cost of materials, labour & T&P etc . required for proper completion of the work.
Providing M-20 (1:1.5:3) cement concrete lining with 4.75 mm. to 20 mm size graded hard stone grit and coarse sand by paver machine and chemical curing on bed and side slope with cost of all materials, and labour, centering and shuttering T&P required for proper completion of work .
Providing and fixing 1200 MM DIA Hume Pipe including placing and fixing in position including cost of all material, labour, T&P etc.required for proper completion of work
Providing and fixing Elastomeric bearing sise (250x560x61)mm
Providing and fixing 75 mm dia M.S and 2mm thick Railing pipe including cost of all material, labour, T&P etc. complete.
Supply and laying of empty cement bags filled with local earth, sand and carriage upto site of work including stiching loading and unloading stacking and alsoincluding supply of all material, labour, T&P required for proper completion of the work etc. as per direction of E/I
Dismenteling of R.C.C Work
Dismenteling of Masonry work
Finishing with Epoxy paint (two or more coats )at all location prepared and applied as per manufacture s specifications including approprite priming coat prepration of surface etc including supply of all material, labour, T&P required for proper completion of the work .
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.46 MB
guntaTD.pdf
Tender Documents • 5.97 MB
BOQ_2056344.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid