| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAccepted-AOC | ₹40.9 L | L1 | Accepted-AOC L1 Bidder. |
| 2 | L2₹40.9 L+₹4,918 (0.12%)Rejected-Finance 55 1 CHAKRABORTY PARA NONACHANDANDPUKUR BARRACKPORE KOLKATA 700122 | BARRACKPORE | 24 PARAGANAS NORTH | WEST BENGAL | 700122 | ₹40.9 L+₹4,918 (0.12%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹41.0 L+₹10,655 (0.26%)Rejected-Finance BIDHANNAGAR DURGAPUR DIST PASCHIM BARDHAMAN PIN 713212 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713212 | ₹41.0 L+₹10,655 (0.26%) | L3 | Rejected-Finance L3 Bidder |
| 4 | L4₹41.0 L+₹11,065 (0.27%)Rejected-Finance | ₹41.0 L+₹11,065 (0.27%) | L4 | Rejected-Finance L4 Bidder |
| 5 | Rejected-Technical VILL CHAKTENTUL PO RONDIA DIST PURBA BARDHAMAN | HOOGHLY | WEST BENGAL | 712134 | - | - | Rejected-Technical Mismatch Credential. |
Tender Value
₹41.0 L
EMD Value
₹81,960
Closing Date
4 Jun 2026, 3:00 pmClosed
EE ASANSOL IRRIGATION DIVION
Asansol Irrigation Division, Sreepally, Asansol 713304
Protection of right bank of river Ajay behind Siddhpur Swasan Kali Mandir of Jamuria Block Paschim Bardhaman under Asansol Irrigation Division
2026_IWD_1024901_1
WBIW/EE/AID/e-NIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
60 days
Asansol Irrigation Division
Please refer Tender documents.
8 documents required · 8 mandatory
₹81,960
25 Jun 2026
21 May 2026
5 Jun 2026
21 May 2026
4 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84m x 0.38 m conforming to BIS: 14252: 2015 for bank protective works including all cost of cost of transportation on road by all means, including other incidental charges complete.
(Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally.) Paragraphs 2.8 including the sub-paragraphs, i.e., 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as“Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate. | 1,410 | Each | 27.41 | ₹38,648.1 |
| 2 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping
from bank within initial lead of 30 m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). | 1,410 | Each | 14.3 | ₹20,163 |
| 3 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed (iii) 15 cm av. Diameter | 1,148 | Meter | 258.62 | ₹2,96,895.76 |
| 4 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 15 cm av. diameter | 861 | Meter | 125.14 | ₹1,07,745.54 |
| 5 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site (a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus | 400 | Meter | 123.95 | ₹49,580 |
| 6 | Darma mat stiffened with split bamboo wailing pieces in both direction @ 50 cm c/c, placed, fitted and fixed with frame work or behind piling works and tied with 22 SWG, GI wire as per direction including cost, carriage and supplying all materials to site complete.
A) Where boats are not necessary | 1,890 | Sqm | 330.13 | ₹6,23,945.7 |
| 7 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 1,169 | Cum | 129.91 | ₹1,51,864.79 |
| 8 | Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden mallet after laying to achieve designed
section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).)
(a) Jhama ballast | 779 | Cum | 1,936.68 | ₹15,08,673.72 |
| 9 | Supplying Nylon cage netting 1 metre x 1 metre x 0.6 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 2,041 | Each | 102.25 | ₹2,08,692.25 |
| 10 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (minimum 13 nos.) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.0328 cum).
Size of Nylon crate is 1metre X 1metre X 0.60 metre.
(a) Where boats are not necessary. | 2,041 | Each | 534.94 | ₹10,91,812.54 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
2911.pdf
Tender Documents • 1.86 MB
BOQ_2518613.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .