Tender Value
₹2.7 Cr
EMD Value
₹5.5 L
Closing Date
30 Jun 2026, 4:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Replacement of bed block at Br. 126(5X60 ft) with centralized bearing in the section of BE-HGJ and strengthening of Bridge No.67, 78, 23, 47 of ORN 3 under ADEN/CH
82-DRM-MB-26-27
82-DRM-MB-26-27
Open
6 Months
Jamnagar, Gujarat
₹0
₹5.5 L
8 Jun 2026
8 Jun 2026
16 Jun 2026
(USSOR Item No. 021520) Hiring of Truck.
Supplying and stacking of 65mm gauge machine made crushed stone ballast as per railway standard specification as directed by Engieer- incharge as per Northern Railway Standard 2 Specifications and special conditions including levelling and cleaing the ground before stacking, all lead, lift, ascends, descends, handling, rehandling, crossing of nallajhs, streams, and hups, tracks and any type of obstructions etc., macking approach road, wherever required for this work including all taxes, royalty,octroi and all other charges if any, as a coplete job.
Deduction for Non Schedule Item i.e. straightening, cutting, bending, placing in 3 position and binding of reinforcement steel included in NS item of RCC Box including cost of straightening, cutting, bending, placing in position and binding of reinforcement steel paid in common in NS item and USSOR-Item No. 045010
RCC of grade M-30/M-35/M-40 or any other design mix casting as per approved drawing with coarse sand and graded stone aggregate of 20mm MAS in all component of RCC box . Precast slab under box for all height or depth including of submission and getting approval of design mix including provision of masonry staging ,centring ,shuttering de-shuttering weigh batching ,cutting strengthening ,hooking ,bending and reinforcement including the cost of binding material wire ,admixture (as per condition of contract).rate shall also be inclusive of mechanical compaction 4 of concrete, mechanical mixing of concrete curing of concrete as per codal provision including the cost of dewatering, bailing out of water lowering the water table whenever required including provision of facia work as per direction of Engineer-in-charge including the finishing the exposed concrete with carborandom stone painting the exposed concrete with cement paint 03 coats providing and fixing PVC conduit pipes function boxes of required size etc. Including all transporting leading, lifting ascends, descends, loading, unloading, handling, re-handling crossing the stream, nallahs, railway track, L-Xing etc or any other obstruction cost of all safety precautions all labour and material as a complete job. NOTE:-Cement and steel reinforcement will be arranged by contractor and payment shall be made separately under relevant items of SSOR2010.
Providing lighting arrangement during "block" In the night to be availed after sun set. In the section during working on hiring basis with contractor's own generator of minimum 8 KV capacity and 10 halogen lamps of 500 watts operations and maintenance of generator and halogen 5 lamps. The paymentshall be made for the night only for which SSE/P. Way/Works and JE/P. Way/Works gives requirement. Standby arrangements have to be ensured by the contractor for any possible failure as block may burst on this account. The item shall be complete in all respects including cost of labour, material tools plant transportation misc. and incidental works related to the job. Nothing extra will be paid on any account
Hiring of haevy earth machinery or heavy excavator like pokeland and for dredking coffer dam includingt all labour leading etc all complete.
'Drilling of holes by core cutter rotary drilling machine of size 40mm-60mm dia and 7 400mm deep in cement concrete or reinforced cement concrete bed blocks including cutting of reinforcement with contractors core cutter rotary drilling machine, power supply, lifting & slewing of girder by suitable capacity of heavy jacks & skilled and non- skilled labour, scaffolding, diamond bit as a complete job
Item Breakup - A-DSR Items
Item Breakup - B-USSOR Items
cum Centering and shuttering including strutting, propping etc. and removal of form for :
400.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level MORADABAD DIVISION-ENGINEERING/NORTHERN RLY
270.00 batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site using 20mm graded crushed stone aggregate and coarse sand of approved quality in jacketing of piers and abutments from bottom of foundation up to a height of 10m for designed thickness of jacketing including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be paid extra under relevant item. 2. Plasticizer shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticisers at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra over 025040 for drilling of holes and insertion of dowel bars in case of Jacketing
dia. jacketing / anchoring
750.00 dia. (cost of rods to be paid extra) Supply and using Cement at Worksite
Portland approved brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
29710.00 Fe-500D or more of approved brands/makes. Total 6083627.00 Item- 2 All items of Ch.04(Bridge Works - Super Structure (Steel ) SOR 2021 S No. Item No Description of Item Unit Qty Rate Amount Providing road crane of specified lifting capacity with specified jib length revolving type for material handling, assembly & erection of girders/slab/RCC Box etc.
150.00 over Item 041209 for every additional 1 MT capacity or part there of Total 1513920.70 Item- 3 All items of Ch.05(Bridge Works - Misc ) SOR 2021 S No. Item No Description of Item Unit Qty Rate Amount Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra). MORADABAD DIVISION-ENGINEERING/NORTHERN RLY
1241.00 compound w.r.t. cement.
3720.00 consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines.
30.00 mark, year of HFL on bridge abutments and piers with ready mixed paint as per standard in two coats over one coat of primer with all materials, labour, tools, scaffolding, all lead and lift etc. including writing complete. Total 13694483.86 Item- 4 All items of Ch.11(Formation Rehabilitation) SOR 2021 S No. Item No Description of Item Unit Qty Rate Amount
2000.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 876420.00 Item- 5 All items of Ch.21(Miscellaneous Items) SOR 2021 S No. Item No Description of Item Unit Qty Rate Amount Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
248.00 minimum 1.10 cum bucket capacity MORADABAD DIVISION-ENGINEERING/NORTHERN RLY
2418.00 cement polythene bags with Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled bags on the high banks /bridge approaches/nominated place etc. dumping and spreading at the nominated locations to profile under block period with all contractor's labour, tools, plants, loading, unloading, filling, spreading including all lead/lift etc. complete and as directed by the Engineer in charge at site including crossing of track where necessary. Total 251570.58
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022.pdf
ATTACHMENT
HQletterdated10.02.2025.pdf HQ letter
ATTACHMENT
otherconditions.pdf
ATTACHMENT
GCC-2022ACSUPTO11NOS.pdf GCC correction slips
ATTACHMENT
STDUptoACS11.pdf
ATTACHMENT
GCC-2022ACSUPTO11NOS.pdf
ATTACHMENT
HQletterdated10.02.2025.pdf
ATTACHMENT
Download all tender documents and submit your bid