Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.7 L+₹19,091.68 (2.25%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.7 L+₹21,637.24 (2.55%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹16,970
Closing Date
25 Aug 2026, 2:00 pmClosed
The Executive Engineer, Malda Highway Division
Singatala, Malda
Alternative route to Balurghat from Malda from 0.00 kmp to 2.00 kmp (in stretches), Potholes repairing work by MC-800 Cut Back bitumen under Malda Highway Division in the District of Malda.
2026_WBPWD_5018540_1
WBPWRD/EE/MHD/eNIT-04/2026-27
Open Tender
CIVIL WORKS
Percentage
20 days
Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹16,970
Yes
3 Sept 2026
13 Aug 2026
27 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pre-coating stone aggregates with cutbac bitumen MC-800 @ 6% of net volume of stone aggregate in mini hot mix plant/Mix it all Including pre heating and bilumen drums upto 85 deg C and pre heating the stone aggregate at suitable temparature, including cost of carrlege of all materials at the mixing yeard and cost of filling the cold mix in empty cement bag, storing the mix filled bag at a suitable place as directed including cost and carriege of bitumen and hire charges of machinaries and all incidental charges complete as per direction of Engineer In Charge (Ref: IRC: 116:2004) | 1 | Cu.m | 15,486.34 | ₹15,470.85 |
| 2 | Labour for mixing stable anti- stripping agent of approved quality conforming to Table -A 5 - 1 of Appendix-5 of specification for Road & Bridge Works of MORT&H(Rev-4) to the binder @ 0.5% to 1% by weight of binder (depending up on size & stripping value of the aggregates ) and allowing 15 to 30 minutes of circulation or stirring in the hot bitumen tank to ensure a homogeneous mix of binder and anti- stripping agent for different bituminous works as per Technical Specifications in given n Appendix - 5 of specification for Road & Bridge Works of MoRT&H (Rev-5) and direction of Engineer-inCharge complete | 1 | Kg. | 423.52 | ₹423.1 |
| 3 | Repairing pot holes with pre-coated stone materials including cutting, loading pre-coated stone materials at departmental stack-yard or any other approved pre-defined location, including carriage of pre-coated stone materials from source to different kilometers of road by truck and laying directly from truck and compacting with plate compactor / power roller including cutting the pot hole to regular shape clearing the pot holes of loose materials, drying the bed of pot holes, where necessary, by soaking with gunny bags and using lime, where necessary, before laying of pre-coated materials etc. complete as per direction of Engineer-in-charge.
(ii) Within a distance above 10 kms and up to 20 kms. | 1 | Cu.m | 12,616.14 | ₹12,603.52 |
| 4 | Add GST @18 % | 18 | Percentage | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
NIT04mhd.pdf
Tender Documents • 0.47 MB
BOQ_5089654.xls
BOQ • 0.33 MB
OID.pdf
Other Document • 0.01 MB
Tenderno04.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .