Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC SHAKTINAGAR SHAKTINAGAR SHAKTINAGAR SONBHADRA UTTAR PRADESH 231222 | SONBHADRA | UTTAR PRADESH | 231222 | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.1 L+₹1.1 L (8.26%)Rejected-AOC NEAR KRAYA VIKRAY SAMITI ASHOK NAGAR DISTRICT FATEHPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.2 L+₹2.2 L (16.8%)Rejected-AOC NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical 10 370 NEAR GEETA MANDIR GAS GODAM ROAD OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | - | Rejected-Technical DOCUMENT REJECTED |
| Sl No | Description | Qty | Unit | M/s Krishna Engineering Works L3 | S. S. ENGINEERING AND CO L1 | M/S SURYA CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00 | Opening of pyrite hopper gate for removal of pyrites from pyrite hoppers of bowl mill of all the three units and removal of its chocking. [work in per unit per shift will be treated as one job] | 1,645 | Jobs | 309 ₹5,08,305 | 260 ₹4,27,700 Lowest | 286 ₹4,70,470 |
| 2.00 | Operation of CMR Belt and sump pump and routine checking of main drive gear box, pulleys, sump pump, flap gate, attending of minor air leakage from pyrite hopper, greasing of all types of pulleys / sump pump, make up oil in main gear box and other minor nature of misc. works. [This work shall be carried out in all three shifts. It one shift will be treated as one Job] | 548 | Jobs | 715 ₹3,91,820 | 602 ₹3,29,896 Lowest | 662 ₹3,62,776 |
| 3.00 | Cleaning of entire CMR trench, desk plate, out-side of the trench, ladders, equipment on storage bin platforms, structure, sump pump floor & pits. | 365 | Jobs | 712 ₹2,59,880 | 659 ₹2,40,535 Lowest | 659 ₹2,40,535 Lowest |
| 4.00 | Mechanical loading of coal mill reject from CMR storage bin, its transportation & unloading in the dumping yard within a radial distance of 04 KM with dumper. | 5,000 | m3 | 32 ₹1,60,000 | 27 ₹1,35,000 Lowest | 30 ₹1,50,000 |
| 5.00 | Manual loading of coal mill reject from mill area near pyrite hopper & under the structure of CMR system, its transportation & unloading in the dumping yard within a radial distance of 04 Km with tractor trolley/dumper | 150 | m3 | 73 ₹10,950 | 62 ₹9,300 Lowest | 68 ₹10,200 |
| 6.00 | Replacement of damaged carrying / return / impact idlers by new / repaired | 60 | Nos. | 58 ₹3,480 | 49 ₹2,940 Lowest | 54 ₹3,240 |
| 7.00 | Replacement of damaged idler frame / bracket | 15 | Nos. | 58 ₹870 | 49 ₹735 Lowest | 54 ₹810 |
| 8.00 | Repairing of damaged carrying / return / impact idlers | 15 | Nos. | 352 ₹5,280 | 296 ₹4,440 Lowest | 326 ₹4,890 |
| 9.00 | Re-fixing of dislocated idlers from their frames / brackets | 10 | Nos. | 56 ₹560 | 47 ₹470 Lowest | 52 ₹520 |
| 10.00 | Repairing of idlers frame/bracket by cutting, welding and machining. | 2 | Job | 352 ₹704 | 296 ₹592 Lowest | 326 ₹652 |
Tender Value
₹13.0 L
EMD Value
₹26,000
Closing Date
4 Oct 2025, 2:00 pmClosed
SE OMC2 ATPS ANPARA
SE OMC2 ATPS 3X210 MW ATPS ANPARA
Routine and breakdown maintenance of coal mill reject system, Operation/Evacuation of coal mill reject from pyrite hopper of bowl mills (XRP-803) and transportation of same to coal yard of all three units of 3x210MW, ATPS, Anpara, Sonebhadra.
2025_RVUNL_1075576_1
ANP/A/OMC2/BMD1/6000009691
Open Tender
Repair and Maintenance Works
Fixed-rate
ANPARA
As per Tender document
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO ATPS ANPARA
₹26,000
28 Nov 2025
20 Sept 2025
6 Oct 2025
20 Sept 2025
4 Oct 2025
20 Sept 2025
Amount
Opening of pyrite hopper gate for removal of pyrites from pyrite hoppers of bowl mill of all the three units and removal of its chocking. [work in per unit per shift will be treated as one job]
Operation of CMR Belt and sump pump and routine checking of main drive gear box, pulleys, sump pump, flap gate, attending of minor air leakage from pyrite hopper, greasing of all types of pulleys / sump pump, make up oil in main gear box and other minor nature of misc. works. [This work shall be carried out in all three shifts. It one shift will be treated as one Job]
Cleaning of entire CMR trench, desk plate, out-side of the trench, ladders, equipment on storage bin platforms, structure, sump pump floor & pits.
Mechanical loading of coal mill reject from CMR storage bin, its transportation & unloading in the dumping yard within a radial distance of 04 KM with dumper.
Manual loading of coal mill reject from mill area near pyrite hopper & under the structure of CMR system, its transportation & unloading in the dumping yard within a radial distance of 04 Km with tractor trolley/dumper
Replacement of damaged carrying / return / impact idlers by new / repaired
Replacement of damaged idler frame / bracket
Repairing of damaged carrying / return / impact idlers
Re-fixing of dislocated idlers from their frames / brackets
Repairing of idlers frame/bracket by cutting, welding and machining.
Splicing of belt by hot vulcanizing joint and preparation of joint including removal of roller structure etc. required for carrying out the work and refitting the same after completion of work
Splicing of belt by cold vulcanizing joint and preparation of joint including removal of roller structure etc. required for carrying out the work and refitting the same after completion of work
Conveyor belt jointing by means of clamping system work including removing of idlers and refitting the same after completion of work. Clamp for jointing shall be arranged by the agency.
Laying of new / old & healthy conveyer belt
Removal of damaged belt and shifting of the same to scrap yard
Replacement/repairing of pyrite hopper gate/flap/shaft etc.
Repairing of pyrite hopper body by cutting, welding, patching etc.
Replacement of Head Pulley
Replacement of Snub / Bend Pulley
Replacement of Take-up Pulley
Replacement of Tail Pulley
Repairing of different damaged pullies of CMR system already removed by cutting, welding, machining etc.
Replacement of damaged bearing / plumber block / sleeve of different pullies
Replacement of bearings of gear box of CMR system
Attending oil leakage from gear box of CMR system
Complete overhauling of gearbox of CMR system
Removal and remounting of coupling of gear box / motor
Alignment of gear box with motor & main pulley
Complete overhauling of pyrite hopper assy.
Neoprene rubber lagging on different pullies (herring diamond / bones grooved + 5% shore hardness 10 to 12 mm thick neoprene rubber will be arranged by agency)
Cleaning of storage bin
Complete overhauling of Sump Pumps
Repairing of take-up guides and their positioning, strengthening etc.
Repairing of flap gate of storage bin
Replacement of liner plate of storage bin
Replacement of liner plate of pyrite hopper
Replacement of damaged gearbox by new /repaired.
Removal, fabrication, re-erection and alignment of damaged/eroded stringer, channel, support, deck sheet etc, of conveyer bed.
Removal, fabrication and re-installation of worn-out/damaged hopper plate from gratings of CMR system along with their supporting channels/beams/angles etc.
Fabrication of new pyrite hopper gate.
M/S SURYA CONSTRUCTION COMPANY (BID ID -5581555)
M/s Krishna Engineering Works (BID ID -5581477)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .