Widening of road from Khalini Bye Pass to Dyrton Bridge ward No 33 Khalini
2022_MC_56726_3
247Dated31012022
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹350
Executive Engineer R B M C Shimla
₹19,200
3 Mar 2022
11 Feb 2022
19 Feb 2022
11 Feb 2022
18 Feb 2022
11 Feb 2022
Amount
Cutting in earth work in all kinds of soil including spade work, pick work, jumper work and blasting work and disposal of excavated earth up to all leads and lifts as directed by Engineer-in-Charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Kaku Ram
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .