| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹7.3 L+₹1,621.19 (0.22%)Rejected-Finance | 2 | Rejected-Finance Highest tender rate |
| Sl No | Description | Qty | Unit | A V CONSTRUCTION L2 | M.PALANICHAMY - CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of Soils such as Hard Stiff Clay, Stiff Black Cotton, Hard red Earth, Shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, Spreading, leveling, sectioning breaking clods etc., in all incidental charges etc., complete as per standard specification. | 31.6 | M3 | 8,370.84 ₹8,370.84 | 8,310.8 ₹8,310.8 Lowest |
| 2.00 | Cement Concrete of mix 1 : 4 : 8 (One Cement four sandEight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 4.8 | M3 | 26,282.88 ₹26,282.88 | 26,265.6 ₹26,265.6 Lowest |
| 3.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 8.83 | M3 | 65,733.17 ₹65,733.17 | 65,721.69 ₹65,721.69 Lowest |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 -Column | 52 | M2 | 67,782 ₹67,782 | 67,704 ₹67,704 Lowest |
| 5.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 -Grade Beam | 14.77 | M2 | 7,767.54 ₹7,767.54 | 7,754.25 ₹7,754.25 Lowest |
| 6.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 -Grade Beam | 74.4 | M2 | 80,724 ₹80,724 Lowest | 80,724 ₹80,724 Lowest |
| 7.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever | 17 | M3 | 1,48,165.2 ₹1,48,165.2 | 1,48,126.1 ₹1,48,126.1 Lowest |
| 8.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 1,700 | Kg | 1,56,570 ₹1,56,570 | 1,55,550 ₹1,55,550 Lowest |
| 9.00 | Plastering in C.M. 1 : 5 - 12 mm thick including all cost and conveyance of all materials to site including cost of cement which will be purchared locally by the contractor and conveyance of the same to the actual work site and cost form work including watering curing and all leads of good potable water and all other Charges including Curing charges etc., Complete as per standard specification. | 236 | M2 | 67,354.4 ₹67,354.4 | 67,024 ₹67,024 Lowest |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 147 | M2 | 38,572.8 ₹38,572.8 Lowest | 38,572.8 ₹38,572.8 Lowest |
Tender Value
₹8.7 L
EMD Value
₹8,700
Closing Date
4 Sept 2025, 3:00 pmClosed
Executive Officer
Town Panchayat Office, Eriodu
Construction of Cremation (Burning) Shed with Platform and waiting shed at 15th ward Kurukkalaiyanpatty in Eriodu Town Panchayat
2025_DTP_599889_1
291/2025_Mayanam
Open Tender
Civil Works
Works
90 days
Executive Officer
as per norms
2 documents required · 2 mandatory
₹0
₹8,700
25 Oct 2025
3 Sept 2025
4 Sept 2025
3 Sept 2025
4 Sept 2025
3 Sept 2025
3 Sept 2025 - 4 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_717037.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .