Tender Value
₹4.7 L
EMD Value
₹5,000
Closing Date
5 Jul 2024, 12:00 pmClosed
SE,EUDC-Vrindavan,LESA,
33/11 K.V. Substation,sct-5D,Vrandavan Yojna,LESA, Lucknow.
Different types of work against Summer Plan (Business Plan 2024-25) in the area of Kanpur Road under jurisdiction of E.E., EUDD- Kanpur Road, LESA, Lucknow
2024_MVVNL_933005_1
17/EUDC-VRINDAVAN/LESA/2024-25
Open Tender
Electrical Works
90 days
LUCKNOW
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹1,180
A/CNo 1277784945,IFSC Code CBIN0280140
₹5,000
10 Jul 2024
26 Jun 2024
5 Jul 2024
26 Jun 2024
5 Jul 2024
26 Jun 2024
Amount
Safe Loading, Carriage & unloading of following Materials from Centre Store to Pit Site/J.E. Dump Store.
(1) Line Material
(2) 11 KV 3x70 Sq.mm XLPE Cable
(3) TF 250 KVA
(4) ABC Cable (3x120+1x95+1x16 sq.mm.)
(5) 11 KV CABLE JOINTING KIT SUITABLE FOR 3X70 SQMM ST
(6) 11 KV CABLE JOINTING KIT SUITABLE FOR 3X70 SQMM OUT DOOR
(7) 11 KV PIN INSULATOR
(8) 11 KV PIN WITH NUT
(9) PCC Pole 8.5 MTR Long
(10) STP POLE 11 MTR LONG
Dragging of ST Pole to pit site, digging of pit erection and grouting (As per RESPO Norms) of LT support suitable for laying of ABC Line on 11 Mtr Long ST Pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESSPO Specification. (Only pole will by provided by the Department.)
Dragging of PCC Pole digging of pit erection of sub-station type double pole structure on PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. (Only Pole and insulator will be Provided by the Department.)
Cable Hosting of 11 KV 3x70 sq. mm XLPE Cable at the following including jumpering etc complete with help of GI Pipe as Per RESPO Norms. (GI pipe and other required material shall be supplied by contractor).
Chemical type earthing (All material and labour shall be supplied the contractor)
High pressure testing (All material and labour shall be supplied the contractor)
Construction of T/F plinth of size 2x2x1.5 mtr with the help first class brick & masonry in the ratio 1:4 cement & sand coarse. Filling the structure completely per norms with RCC to 1:2:2 cement & stone grit with MS bar and MS channel for resting transformer. (All material and labour shall be supplied the contractor.)
Wiremess fencing of 11/0.4 KV S/S & Distribution box shall be made of rectangular of size as per site requirement not exceeding 3 meter fabrication 45x45x5 mm angel the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of wire mesh. Rectangular welded type wire mess of size 50x25 made of 12 S.W.G. wire mess shall be welded all along the periphery of the frame as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. Diagonal bracing of all the frame panel will be welded with Ms flat of size 25x3mm to support as per RESPO specification & direction of E/I. (All material and labour shall be supplied the contractor.)
Proper laying & commissioning of (3x120 sq.mm) Aerial Bunched Conductor. (Only ABC Provided by the department)
Laying of 3X70 sq.mm 11 KV XLPE cable by drilling method as per RESPO Norms. (Only cable supplied by the Department.)
Laying of 3X70 sq.mm 11 KV XLPE cable by Manual method as per RESPO Norms. (Only cable supplied by the Department.)
Construction of masonry type LT Distribution Box. (All material shall be supplied by the contractor).
Supply and fixing of copper L-piece for 250 KVA TF (62x225x12 MM) as per RESPO Norms
Supply and fixing of aluminium Lug for 250 KVA TF (400sqmm) as per RESPO Norms
Supply and fixing of 11 KV TPMO set complete as per RESPO Norms
Supply and fixing of Danger Board and Clamp as per RESPO Norms
Supply and fixing Fuse Unit 500 Amp. 650 Volt with copper Busbar 750*50*8 mm complete as per RESPO Norms
Earthing of PCC poles as per RESPO norms (All the Materials Supplied by the Contractor)
Fabrication, errection & commissioning of 250 KVA T/F on Plinth with all accessories. All material except 250 KVA T/F shall be supplied by the Contractor.
Fixing OUTDOOR / INDOOR END TERMINATION JOINTING KIT FOR 11 KV 3X70 SQMM XLPE CABLE
G.S.T. Extra as per rules.
M/s CHAUHAN ELECTRICALS