Tender Value
₹8.0 L
EMD Value
₹8,000
Closing Date
9 Dec 2021, 2:00 pmClosed
CE/TTPS/SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
EM II Core lifting inspection and internal cleaning of all 20 Nos Rectifier Transformers in ESP II during the overhauling period of 2021 22
2021_EB_214546_1
CE/TTPS/ SE/ES /254 /2021-22
Open Tender
Electrical Works
Item Rate
25 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹8,000
Yes
13 Dec 2021
24 Nov 2021
10 Dec 2021
24 Nov 2021
9 Dec 2021
24 Nov 2021
Loading of oil filtering machine into vehicle and bring it to “O” m of ESP-II and lifting the machine to the top floor of ESP –II for oil filtering works and set right the machines without shake and return back the machine to original place after completion of oil filtering works.
Providing scaffolding disconnect the power and control cables and transformer secondary field connections ,dismantling the transformer top cover, lifting the rectifier transformer core , flushing the core and winding assembly, rectifier diode stack and transformer tank with new transformer oil inspect the bushing and internal connections. After completion of work reassembling the transformer core, placing the top cover and then reconnecting the transformer power and control cables. After completion of this work the scaffolding pipes to be dismantled (ESP transformer).
Connecting the inlet and outlet hoses to oil filtering machine and extending power supply to the oil filtering machine, filtering the oil fill the breakdown values of the oil improved to the required level. Replacing the valve and gasket if necessary , attending leakages of oil tightening of bolts and nuts checking the earth connection attending of all rectification works if any related to rectifier transformer, transporting of oil and other materials from store to work spot and re transport to devolution of waste materials to store.
DURAI ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .