Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Lowest Amount Quoted BY SAKTHI CONTRACTOR 11525826.53 |
| 2 | L2₹1.2 CrRejected-AOC | ₹1.2 Cr | L2 | Rejected-AOC HIGHER RATE |
| 3 | Rejected-Technical | - | - | Rejected-Technical Original Annexure F and G not submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Original Annexure F Not Produced |
| Sl No | Description | Qty | Unit | Sharveshwaran Constructions L2 | SAKTHI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001. Strengthening of the road from Karadikkal to Varadhegoundandoddy km 0/0-3/200 H/o.Madakkal - Rs. 117.140 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 3,873.24 | Sqm | 6.42 ₹24,866.20 | 6.36 ₹24,633.81 |
| 3.00 | Eartwork excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of10m and lift of 2m including all labour charges and incidental charges such as shoring strutting, providing coffer dams, bailing out | 1,659.94 | Cum | 141.87 ₹2.4 L | 140.38 ₹2.3 L |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 3,074 | Sqm | 23.6 ₹72,546.40 | 23.35 ₹71,777.90 |
| 5.00Providing and laying including cost and conveyanceof gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the requried proctor dnsity at 100% compaction etc., completed | |||||
| 6.00 | Km 0/0-3/20 | 1,383.28 | Cum | 344.55 ₹4.8 L | 340.93 ₹4.7 L |
| 7.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 8.00 | Km 0/0-3/20 | 1,383.28 | Cum | 2,409.75 ₹33.3 L | 2,384.46 ₹33.0 L |
| 9.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it. | |||||
| 10.00 | Km 0/0-3/20 | 9,222 | Sqm | 87.21 ₹8.0 L | 86.3 ₹8.0 L |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
27 Nov 2025, 3:00 pmClosed
The Block Development Officer thally
The Block Development Office thally
Strengthening of the road from Kardikkal to Varadhegoundandoddy at Madakkal in THally Block Krishnagiri DT under SADP 2025-2026 TLY 41
2025_RDTN_623449_1
RocNo31_2024_DPO_30_10_2025
Open Tender
Civil Works - Roads
180 days
Thally
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.2 L
The Block Development Office thally
2 Jan 2026
14 Nov 2025
27 Nov 2025
14 Nov 2025
27 Nov 2025
14 Nov 2025
18 Nov 2025
Amount
1. Strengthening of the road from Karadikkal to Varadhegoundandoddy km 0/0-3/200 H/o.Madakkal - Rs. 117.140 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Eartwork excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of10m and lift of 2m including all labour charges and incidental charges such as shoring strutting, providing coffer dams, bailing out
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying including cost and conveyanceof gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the requried proctor dnsity at 100% compaction etc., completed
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat WMM Surface (treated with primer) at 2.5 KG of RS-1 Bitumen Emulsion / 10 Sqm including labour for spraying, hire charges for bitumen sprayer etc., comp
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for H.M.Stone
Provision for KM stone
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of Retaining wall @2400-2485m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Provision for Weep Holes
Provision for Expansion Joint
Provison for Name Board
Provision for Signboard
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sharveshwaran Constructions (BID ID -1520893)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_745469.xls
BOQ • 0.30 MB
TLY41PB.pdf
Tender Documents • 0.34 MB
TLY41TB.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid