| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | L1 | Accepted-Finance 1st Lowest Bidder | |
| 2 | L2₹2.5 L+₹7,220 (2.95%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹2.8 L+₹35,500 (14.5%)Rejected-Finance NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | L4₹2.9 L+₹42,500 (17.4%)Rejected-Finance 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | L4 | Rejected-Finance 4th Lowest Bidder | |
| 5 | L5₹3.0 L+₹53,500 (21.9%)Rejected-Finance | L5 | Rejected-Finance 5th Lowest Bidder |
Tender Value
₹4.1 L
EMD Value
₹4,000
Closing Date
8 Oct 2024, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, 132 KV S/s Mohaddipur Old , Gorakhpur
WORK OF DISMANTLING OF 132/33 KV 40 MVA TRANSFORMER AND ERECTION OF 132/33 KV 63 MVA TRANSFORMER ALONG WITH COMPLETE WORK OF MULSIFYRE SYSTEM AT 220 KV S/S BARAHUWA, GORAKHPUR UNDER ETD-II , GORAKHPUR
2024_UPTCL_955441_1
E-Tender No. 40-ETC(G)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹4,000
23 Oct 2024
12 Sept 2024
9 Oct 2024
12 Sept 2024
8 Oct 2024
12 Sept 2024
Amount
Following Work is to be carried out at 220KV S/s Barahuwa for dismantling of 132/33 KV , 40 MVA T/F by new 132/33 KV 63 MVA T/F .
Complete Dismantling of 40 MVA 132/33 KV T/F and accessories after opening of HV/LV side jumpers , removal of earthing and opening of cable connection of protection system and fan / pump control , Draining of Transformer oil from radiator & conservator tank , oil pipe lines of transformer oil up to required level in 209 liters capacity oil drums , removal of radiators , conservator tank , oil pipe lines , all bushing , turrets , fan motors , marshalling box , RTCC panel etc. , blanking the radiators , oil pipe lines , conservator tank turrets etc. with proper gaskets along with nuts and bolts to complete the job satisfactorily including proper stacking . Opening of jumpers of old transformer from CB , CT , LA , Isolator etc and re-jumpering of new 132/33 KV 63 MVA T/F at HV & LV sde , CBs , CTs , Isolator and LAs upto bus bar with moose / panther conductor after erection of 132/33 KV 63 MVA T/F as required . All labour and T&P shall be provided by contractor at his own cost .
Shifting of 132/33 KV 40 MVA T/F main tank from plinth to near 20 meters .
Additional Shifting 300 Mtr. @ 5 Mtr/Job
Shifting and Placement of all dismantled accessories as radiator , conservator tank and other accessories to store /open switch yard and proper stacking .
Packing of HV , T/F bushing of dismantled 40 MVA T/F (Wooden box will be provided by the contractor ) and its shifting up to proper storage place .
Dismantling of existing mulsifire system . Air pipe lines , Water pipe lines and other associated ancillaries of 40 MVA T/F and safe shifting to required place and re-erection work including all labour materials and T&P used and by using existing materials .
SAI KRIPA LIFT SHIFT COMPANY
ARK ENGINEERING
Technocrat Electrical
Meena Elect & Engg. Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .