Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 966 SBM ILLAM PADAVALKALVAI APPACHI NAGAR AMMAPETTAI ERODE | ERODE | ERODE | TAMIL NADU | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹14.9 L
EMD Value
₹14,900
Closing Date
13 Apr 2022, 2:00 pmClosed
Superintending Engineer EEDC Erode
948.EVN Road, TANGEDCO, EEDC, ERODE-9
Supplying and fixing of gate and protection wall in SE Quarters at EEDC/Erode
2022_EB_227166_1
SE/EEDC/ED Specification No.32/2021-22
Open Tender
Civil Works - Others
Works
90 days
SE Quarters/EEDC/Erode
AS per BQR Details
2 documents required · 2 mandatory
₹0
₹14,900
Yes
22 Apr 2022
24 Mar 2022
13 Apr 2022
24 Mar 2022
13 Apr 2022
24 Mar 2022
24 Mar 2022 - 12 Apr 2022
Amount
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete.
Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete.
Plain cement concrete in CC 1:4:8, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Plain cement concrete in C.C. 1:2:4 mix using 12 to 20mm HBG machine crushed metal for Road surface including cost of cement, all materials, labour, curing, vibration charges, including shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
Cement Solid Block in CM 1:5 using 15 cm cement Solid block for super structure and manhole including cost of all materials, labour charges, curing, scaffolding charges all leads and lifts etc., complete and as directed by Engineer.
Plastering with CM 1:5 12 mm thick for inner and outer wall including cost of cement, labour, curing, all leads and lifts etc., complete as per standard specification.
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Gate pillar footing including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Gate pillar up to FGL including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Gate pillar above GL including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Providing steel reinforcement MS/RTS rods upto16mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Fabricating & supplying and fixing of Main gate and wicket gate using structural steel angles, flats, plates, squares etc., as per specification and as directed and painting with two coats of approved colour enamel paint over one coat of red oxide primer including cost of steel and painting materials, lead, lift, labour, as per standard specification, etc., complete.
SGST For bidders within Tamilnadu
CGST For Bidders within Tamilnadu
IGST For Bidders outside of Tamilnadu
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .