| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.9 LAccepted-AOC | ₹65.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹68.0 L+₹2.1 L (3.20%)Rejected-AOC | ₹68.0 L+₹2.1 L (3.20%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M V MATHI L1 | M RAVIANAND L2 |
|---|---|---|---|---|---|
| 1.00 | Shuttering cost for CC pavement etc.., Complete Complying with the direct by the departmental officer.(HD SOR -2025-26, HW- W0143 & P.No.348) | 222 | m2 | 330 ₹73,260 Lowest | 500 ₹1,11,000 |
| 2.00 | Plain Cement Concrete 1:1.5:3 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 453 | m3 | 7,189 ₹32,56,617 Lowest | 7,500 ₹33,97,500 |
| 3.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 100 | m2 | 479 ₹47,900 Lowest | 479 ₹47,900 Lowest |
| 4.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 14 | m3 | 4,498 ₹62,972 Lowest | 4,498 ₹62,972 Lowest |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 138 | m3 | 2,374 ₹3,27,612 Lowest | 2,374 ₹3,27,612 Lowest |
| 6.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 920 | m2 | 83 ₹76,360 Lowest | 83 ₹76,360 Lowest |
| 7.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 920 | m2 | 18 ₹16,560 Lowest | 18 ₹16,560 Lowest |
| 8.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 2,798 | m2 | 28 ₹78,344 Lowest | 28 ₹78,344 Lowest |
| 9.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 46 | m3 | 10,086 ₹4,63,956 Lowest | 10,086 ₹4,63,956 Lowest |
| 10.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 112 | m3 | 10,569 ₹11,83,728 Lowest | 10,569 ₹11,83,728 Lowest |
Tender Value
₹68.3 L
EMD Value
₹68,280
Closing Date
13 Nov 2025, 3:00 pmClosed
Commissioner
Commissioner, Arcot Municipality
Renewal of Cement Concrete at ward no.2,3,11,13,15 and 23 in Arcot (15th Cfc 2025-26) Boq
2025_MAWS_620197_1
Roc.No.2106/2025/E1
Open Tender
Civil Works
Works
180 days
Arcot Municipality
Renewal of Cement Concrete at ward no.2,3,11,13,15 and 23 in Arcot (15th Cfc 2025-26)
3 documents required · 3 mandatory
₹10,000
₹68,280
Yes
31 Aug 2026
5 Nov 2025
13 Nov 2025
5 Nov 2025
13 Nov 2025
5 Nov 2025
5 Nov 2025 - 13 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_741669.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .