Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.1 LAccepted-Finance | L1 | Accepted-Finance Responsive | |
| 2 | L2₹67.7 L+₹54,922.81 (0.82%)Accepted-Finance | L2 | Accepted-Finance Not Responsive | |
| 3 | L3₹69.2 L+₹2.0 L (3.02%)Accepted-Finance | L3 | Accepted-Finance Not Responsive | |
| 4 | L4₹70.8 L+₹3.6 L (5.40%)Accepted-Finance | L4 | Accepted-Finance Not Responsive |
| Sl No | Description | Qty | Unit | SARANRAJ S L3 | S Ganesan Sthapathy L4 | SRI SELVA VINAYAGAD CRAFTS L1 | S Kumaran Sthapathy L2 |
|---|---|---|---|---|---|---|---|
| 1.00Description | |||||||
| 2.00 | Suppling of Country wood (Illupai) of best quality of Spceial size Including cost and conveyance of all materials for horizontal bar over iron Axles Adukkumaram for Chittur mattam Padmasanam Nadasanam Devasanam Simmasanam Top planks over devasanam etc complete. (As per Sthapathy statement) | 803.5 | Cft. | 2,500 ₹20,08,750 | 2,600 ₹20,89,100 | 2,420 ₹19,44,470 Lowest | 2,506.5 ₹20,13,972.75 |
| 3.00 | Supplying and fixing of 150X30 mm teak wood reepar including cost and conveyance of all materials and labour charges for shaping wrought and put up | 11 | Cft. | 5,900 ₹64,900 | 6,000 ₹66,000 | 5,800 ₹63,800 | 5,600 ₹61,600 Lowest |
| 4.00 | Labour for wrought and put up for new wood works frames such as Adukkumaram for Chittur mattam Padmasanam Nadasanam Devasanam Simmasanam Top planks over devasanam and ties of various size complying with relevant standard specification | 620 | Cft. | 2,500 ₹15,50,000 | 2,500 ₹15,50,000 | 2,400 ₹14,88,000 | 2,395 ₹14,84,900 Lowest |
| 5.00Labour for wrought and put up for making Vigrahams of Simmasanam, Yali, Horse, Elephant, etc complete including all labour charges, Architectural finishing, shaping, carving and finishing with standard specification | |||||||
| 5.10 | 0' 9"-1' 6" Size Vigrahams | 82 | Nos | 6,010 ₹4,92,820 | 5,800 ₹4,75,600 | 6,000 ₹4,92,000 | 5,560 ₹4,55,920 Lowest |
| 5.20 | 2'0" and abouve Size Vigrahams | 164 | Nos | 7,600 ₹12,46,400 | 7,800 ₹12,79,200 | 7,500 ₹12,30,000 | 7,388 ₹12,11,632 Lowest |
| 6.00 | Labour for wrought and put up for Boothiyal with omamental features flower work etc complete (small size bothiyal) Quatation Rate | 108 | Nos | 3,200 ₹3,45,600 | 3,500 ₹3,78,000 | 3,000 ₹3,24,000 Lowest | 3,367.5 ₹3,63,690 |
| 7.00 | Supply and fixing of steel such as plates, flats, square bars, bolts, nuts, screws and washer for connecting vertical and horizontal frames etc, Complete | 1,450 | Kg | 106 ₹1,53,700 | 110 ₹1,59,500 | 102 ₹1,47,900 | 100 ₹1,45,000 Lowest |
| 8.00Sub Total | |||||||
Tender Value
₹72.9 L
EMD Value
₹46,500
Closing Date
26 Oct 2026, 5:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE EXECUTIVE OFFICER GRIII
Arulmigu Sarntharaikathaswamy Temple, Thillaiyadi, Tharangambadi Taluk, Mayiladuthurai District
Making New Temple Car In Arulmigu Sarntharaikathaswamy Temple, Thillaiyadi, Tharangambadi Taluk, Mayiladuthurai District
2026_HRCE_710794_1
01/2026
Open Tender
Civil Works - Others
Item Rate
Arulmigu Sarntharaikathaswamy Temple, Thillaiyadi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹46,500
27 Oct 2026
5 Oct 2026
27 Oct 2026
5 Oct 2026
26 Oct 2026
5 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description | |||||
| 2 | Suppling of Country wood (Illupai) of best quality of Spceial size Including cost and conveyance of all materials for horizontal bar over iron Axles Adukkumaram for Chittur mattam Padmasanam Nadasanam Devasanam Simmasanam Top planks over devasanam etc complete. (As per Sthapathy statement) | 803.5 | Cft. | - | - |
| 3 | Supplying and fixing of 150X30 mm teak wood reepar including cost and conveyance of all materials and labour charges for shaping wrought and put up | 11 | Cft. | - | - |
| 4 | Labour for wrought and put up for new wood works frames such as Adukkumaram for Chittur mattam Padmasanam Nadasanam Devasanam Simmasanam Top planks over devasanam and ties of various size complying with relevant standard specification | 620 | Cft. | - | - |
| 5Labour for wrought and put up for making Vigrahams of Simmasanam, Yali, Horse, Elephant, etc complete including all labour charges, Architectural finishing, shaping, carving and finishing with standard specification | |||||
| 5.1 | 0' 9"-1' 6" Size Vigrahams | 82 | Nos | - | - |
| 5.2 | 2'0" and abouve Size Vigrahams | 164 | Nos | - | - |
| 6 | Labour for wrought and put up for Boothiyal with omamental features flower work etc complete (small size bothiyal) Quatation Rate | 108 | Nos | - | - |
| 7 | Supply and fixing of steel such as plates, flats, square bars, bolts, nuts, screws and washer for connecting vertical and horizontal frames etc, Complete | 1,450 | Kg | - | - |
| 8Sub Total | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_853964.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TenderDocuments.pdf
Tender Documents • 0.76 MB
Contitions.pdf
Additional Documents • 0.12 MB
BOQ_853964.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .