| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹2.8 L+₹8,056.23 (2.93%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer |
| Sl No | Description | Qty | Unit | RADISHKUMAR L2 | Thulasi L1 |
|---|---|---|---|---|---|
| 1.00Renovation of 30000 litre OHT in Andavakkam Village Estimate amount: 84000 | |||||
| 2.00 | Dismantling Cement Concrete and all loboure charges etc complete | 12.12 | Sqm | 44 ₹533.28 | 43 ₹521.16 Lowest |
| 3.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 12.12 | Sqm | 334 ₹4,048.08 | 324 ₹3,926.88 Lowest |
| 4.00 | Dismantling Plain Cement Concrete and all loboure charges etc complete | 0.7 | Cum | 536 ₹375.2 | 520 ₹364 Lowest |
| 5.00 | Painting two coats with Plastic Emulsion paint of Ist class etc., with best approved quality of Cement paint of approved colour over the existing priming coat etc., complete complying with standard specifications. | 116.2 | Sqm | 270 ₹31,374 | 262 ₹30,444.4 Lowest |
| 6.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.As per Ss 20B | 32 | Mtr | 213 ₹6,816 | 207 ₹6,624 Lowest |
| 7.00 | Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6KSC | 32 | Mtr | 146 ₹4,672 | 142 ₹4,544 Lowest |
| 8.00 | Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete. | 32 | Mtr | 25 ₹800 | 24 ₹768 Lowest |
| 9.00 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. . | 32 | Mtr | 29 ₹928 | 28 ₹896 Lowest |
| 10.00Renovation of 30000 litre OHT in Vedavakkam Village Estimate amount: 116000 | |||||
Tender Value
₹3.2 L
EMD Value
₹3,200
Closing Date
27 Feb 2026, 3:00 pmClosed
Block Development Officer(BP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Package No.1 Renovation of School Building, OHT, Panchayat Office at Andavakkam Panchayat in Madhuranthagam Block Under Rural Building Maintenance Scheme for the year 2025-26
2026_RDTN_664207_1
Rc.No.0332/2026/A4 Dated 14.02.2026
Open Tender
Civil Works - Others
Item Rate
90 days
Andarkuppam PUP School
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,200
Yes
13 Mar 2026
23 Feb 2026
27 Feb 2026
23 Feb 2026
27 Feb 2026
23 Feb 2026
Renovation of 30000 litre OHT in Andavakkam Village Estimate amount: 84000
Dismantling Cement Concrete and all loboure charges etc complete
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Dismantling Plain Cement Concrete and all loboure charges etc complete
Painting two coats with Plastic Emulsion paint of Ist class etc., with best approved quality of Cement paint of approved colour over the existing priming coat etc., complete complying with standard specifications.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.As per Ss 20B
Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete.
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. .
Renovation of 30000 litre OHT in Vedavakkam Village Estimate amount: 116000
Dismantling Cement Concrete and all loboure charges etc complete
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Dismantling Plain Cement Concrete and all loboure charges etc complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Painting two coats with Plastic Emulsion paint of Ist class etc., with best approved quality of Cement paint of approved colour over the existing priming coat etc., complete complying with standard specifications.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.As per Ss 20B
Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete.
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. .
Supply and Following of 63mm dia GI Pipe Including Cost and Conveyance etc Complete. GI Pipe
G.M. Gate valves
G.M. Non Return Gate valves
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc complete
Renovation of Two class room PUP School (G+1) in Vedavakkam at Andavakkam Panchayat Estimate amount: 84000
Chipping of Concrete and Plastering Surface including all charges
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
White washing two coats with approved colour and quality including the cost of paint and labour charges etc., complete complying with the standard specification and as directed by the Departmental Officers
Renovation of Panchayat Office Building in Andavakkam Estimate amount: 42000
Chipping of Concrete and Plastering Surface including all charges
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
White washing two coats with approved colour and quality including the cost of paint and labour charges etc., complete complying with the standard specification and as directed by the Departmental Officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_797503.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_797503.xls
BOQ • 0.31 MB
Technical.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .