Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.5 LAdmitted-Finance | -12.25% | ₹48.5 L | L1 | Admitted-Finance |
Tender Value
₹55.3 L
EMD Value
₹1.1 L
Closing Date
20 Aug 2026, 6:00 pmClosed
ADPC SMSA BHILWARA
ADPC SMSA BHILWARA
Construction of 5 ACR, 2 Toilet Unit and Kitchen Shed at GOVT. UPPER PRIMARY SCHOOL GANESHPURA Block-KOTRI
2026_RCSCE_587205_30
NIT-09/2026-27-SMSA BHILWARA
Open Tender
Civil Works
Percentage
240 days
Bhilwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
As per NIT Condition
₹1.1 L
8 Sept 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5 mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering and ramming disposal of surplus excavated soil as directed with a lead in a 50 mtr.All kinds of soil. | 349.02 | CUM | 178 | ₹62,125.2 |
| 2 | Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4 Coarse sand :8 graded stone aggregate 40 mm nominal size). | 33.75 | CUM | 3,962 | ₹1,33,730 |
| 3 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for foundation, footings, strap beam, raft, base of column etc UPTO PLINTH LEVEL | 313.12 | SQM | 173 | ₹54,169.24 |
| 4 | Steel Reinforcement:-P/F reinforcement for RCC work including straightening,cutting, bending, placing in position and binding (including cost of binding wire) all complete upto floor three level TMT bars . | 14,900.7 | KG. | 82 | ₹12,21,857.32 |
| 5 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 61.45 | CUM | 5,921 | ₹3,63,822.45 |
| 6 | STONE MASONARY FOR FOUNDATION:- Random Rubble Stone masonry for foundation and plinth in cement sand mortar above 30 cm thick wall in cement sand mortar 1:6 (1 cement : 6 sand) | 132.02 | CUM | 3,406 | ₹4,49,660.19 |
| 7 | Supply transporation etc. & Stacking good earth at site complete including loading unloading & transporation etc.Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 302.1 | CUM | 328 | ₹99,089.37 |
| 8 | Stone Kharanja: RR Dry stone kharanja under floor | 40.14 | CUM | 1,118 | ₹44,880.82 |
| 9 | Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level M 10 grade nominal Mix1:3:6 (1 cement:3 Coarse sand : 6 gradeed stone aggregate 20 mm nominal size). | 26.98 | CUM | 4,616 | ₹1,24,520.75 |
| 10 | Brick work with clay flyash F.P.S. brick (IS 13757- 1993 ) of class designation 75 in superstructure above plinth level upto floor five level in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 87.72 | CUM | 5,798 | ₹5,08,588.95 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 17.70 MB
Tendernotice_2.pdf
PDF • 1.77 MB
Tendernotice_3.pdf
PDF • 0.52 MB
Tendernotice_4.pdf
PDF • 0.74 MB
Tendernotice_5.pdf
PDF • 0.17 MB
Tendernotice_6.pdf
PDF • 0.57 MB
Tendernotice_7.pdf
PDF • 11.59 MB
BOQ_1043784.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .