| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | ₹2.6 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹2.8 LAccepted-Finance | ₹2.8 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | DIVYA ENGINEERING | M K ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works upto 3m heights, using 13 to 15 cm dia. casuarina props, the distance between the two rows are being 1.25m and the spacing of posts being 2m. in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc. complete. | 31.6 | m2 | 17,885.6 ₹21,105.01 | 16,779.6 ₹19,799.93 |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 0.5 | m3 | 2,742.5 ₹3,236.15 | 2,571 ₹3,033.78 |
| 3.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 47.1 | m2 | 2,402.1 ₹2,834.48 | 2,260.8 ₹2,667.74 |
| 4.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 6.7 | m2 | 73.7 ₹86.97 | 67 ₹79.06 |
| 5.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc., complete. | 8.5 | m2 | 10,395.5 ₹12,266.69 | 9,749.5 ₹11,504.41 |
| 6.00 | Providing RCC 1:1/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all material, labours, lead, lift, curing, etc. complete excluding cost of reinforcement and form work. | 0.7 | m3 | 7,803.6 ₹9,208.25 | 7,316.4 ₹8,633.35 |
| 7.00 | Supplying & providing RTS/ MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc., complete. | 42 | Kg | 4,410 ₹5,203.80 | 4,116 ₹4,856.88 |
| 8.00 | Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, Labours, lead, curing, etc. complete | 1.5 | m3 | 11,232 ₹13,253.76 | 10,530 ₹12,425.40 |
| 9.00 | Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete | 61.7 | m2 | 21,780.1 ₹25,700.52 | 20,422.7 ₹24,098.79 |
| 10.00 | Plastering with CM 1:5, 20mm thick for brick wall surface including cost of all materials, labour, lead, lift, curing etc. complete | 30.4 | m2 | 20,520 ₹24,213.60 | 19,243.2 ₹22,706.98 |
Tender Value
Refer Docs
EMD Value
₹2,700
Closing Date
6 Apr 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Repair and Maintenance Works to the JE FOC Office and AE AEE Civil Camp 2 Office Building at Analmin Nagar
2026_EB_674632_1
CE SE C TTPS Spec.No. 463 25 26
Open Tender
Civil Works - Others
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,700
Yes
8 Apr 2026
13 Mar 2026
7 Apr 2026
13 Mar 2026
6 Apr 2026
13 Mar 2026
Providing two legged scaffolding for works upto 3m heights, using 13 to 15 cm dia. casuarina props, the distance between the two rows are being 1.25m and the spacing of posts being 2m. in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc. complete.
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete.
Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc., complete.
Providing RCC 1:1/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all material, labours, lead, lift, curing, etc. complete excluding cost of reinforcement and form work.
Supplying & providing RTS/ MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc., complete.
Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, Labours, lead, curing, etc. complete
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete
Plastering with CM 1:5, 20mm thick for brick wall surface including cost of all materials, labour, lead, lift, curing etc. complete
Providing Plinth P.C.C 1:4:8 using OP cement with 20mm to 12mm chips machine crushed HBG metal including cost of all materials, labour, lead, lift, Curing, etc., complete.
Supplying and fixing of wooden Windows shutters with country wood outer frame of size 100x75mm and the shutter frame 75x50mm with plywood shutters 12mm thick and 5mm thick glass including cost of all materials, labour lead, lift, etc., complete.
Supplying and providing new GALVALUME SHEETS of 0.45mm thick rate including cost of all materials, fixtures, bolts / rivets with all lead, lift, labour etc., complete.
Supplying and fabricating and forming in position of the new angle, channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift, safety appliances etc., complete.
Painting two coats with ready mixed enamel paint for the old wooden doors, windows including cost of all materials, through cleaning of surface, labours, lead, lift curing, etc. complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete.
Painting old wall surface with two coats of Asian make exterior paint (or) equivalent over the existing wall surface with priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Replacing the Indian water closet of size 580 x 440mm white glazed earthware with 'P' trap with sand cushion and forming flooring alround the water closet using 20mm brick jelly in lime concrete and plastering with CM 1:3, 20mm thick including cost of all materials, labour, lead, lift, etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_810843.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_810843.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid