Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹23.7 L+₹24,740.17 (1.05%)Accepted-Finance | L2 | Accepted-Finance Accepted |
Tender Value
₹23.8 L
EMD Value
₹24,000
Closing Date
16 Jun 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA Krishnagiri
Krishnagiri DT -SEDP 2018-19- Shoolagiri Block - 4 Works- Package No TN-04-KRI-18
2020_RDTN_166441_1
Roc_no_4512_2018_R7_22_05_20
Open Tender
Civil Works - Others
Item Rate
90 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹24,000
DRDA Krishnagiri
3 Jul 2020
3 Jun 2020
16 Jun 2020
3 Jun 2020
16 Jun 2020
3 Jun 2020
5 Jun 2020
90 days
Amount
Providing new borw well Motor, panel Board, GI Pipe, Cable Wire and Pipe Line @ Mariyamman Kovil Streett H/o Kanalatty - Rs. 4.560 Lakhs
Geophysical invetigation Charegs including preparation of geophysical survey etc.,
Drilling of 150mm dia borewell in over burden soil
Drilling of 150mm dia borewell in Hard rock area
150mm casing pipe (CS) with excise duty upto 80m
Cost of 5.00 50lpmx75mm Sub motor
Cost of 5HP panel board three phase
Labour Charges for errection of 5.00 HP Submersible pumpset with GI Pipe Borewell including connection of submersible cable etc., all Completed0
50mm GI Pipe
50mm GI Pipe
50mm GI Pipe Coupling
Cost of 4sq.mm flat type copper cable PVC insulated and sheathed 3 core flat type copper cable confirming to IS 694/1990
Borewell cover MS flat size 1cmX3mm
MS Clampset
50mm GI bend
50mm Flangeset
50mm GI HEX nipple
50mm GM NRV
4 Core 16 sq.mm PVC armoured ug cable
100 AMPS porcelain unit 500V
Construction of Kiosk Pedestral
EB Deposit
63mm HDPE Pipe-PE 100-PN-6 including earth work loying and jointing and refilling
Towards cost of bore well protection structure
Provision for Name board charegs
Upgradations of the road from Kanalatty road to High School Km 0/0-0/210 H/o Kanalatty - Rs. 6.430 Lakhs
Clearing and grubbing (Scrub Jungle) road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavations in all classes of soils except hard rock requiring blasting depposting on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charegs such as shoring,strutting,providing coffer dams,bailing out
Construction of granular sub base by providing well graded material (25mm to 4.75mm IRC metal @ 65%,4.75 to 2.36mm IRC HBG mental @ 20% 2.36mm below IRG mental @ 15%) & ( the material Passing 425 microns sieve shall have liguid limit and plastering limit not more than 25&6%repectively) spreading in uniformlayers with motors grsder on prepared surface mixing by mix in plaace method with rotovator at OMC and compacating with three wheel 80-100KN capacity and finished in accordance with the requirement of the specification and thickness as per approved plans or as directed by the Engineer (Mix-in-place mathod)
Providing and laying Water Bound Macadam Grading - II (75mm to22.40mm)IRC HBG consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) for Top Layer
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) for Top Layer
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel mpacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for HM Stone
Provision for Signage board
Provision of Name Board
Construction of Threshing Floor Near Burial Ground @ Kanalatty H/O Kanalatty - Rs. 6.350 Lakhs
Earth work Excavation for foundation in all Soil to Fullm depth as may be directed ecept in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement Concrete 1:4:8 mix unsing 40mm HBG mental for foundation including watering wherever necessary and laid in layers of lot more than 15cm thick , Compacting etc., Completed Completd Complying with standard specification and as directed
Random Rubble Masonry in CM 1:5 mix using new Roungh Bond Stone Including Curing Etc., Completed Complying with Stanard Specification Threshing Floor Main wall Allround III rd footing
Filling in basement with excavated earth in layer of not more than 15cm thick well rammed, watered and consoildated complying with standared specification etc,. Completed
Supplying & erecting centering for sides&soffiots including necessary supports & Strutting upto 3.29m height for plane surface in all floors with all floor with all cross bracing using mild stee; of size 90X60cm & 10 gauge Stiffened, welded with steel angle
Cement Concrete 1:2:4 mix using 20mm ISS mental including cost and conveyance of all material to site and all labour charegs for mixing, lying,and curing etc Completed for 10Cum
Brick Work in Cement Mortar 1:5 mix using Country Bricks Including Cost and conveyance of all materal to site and all labour charegs etc completed for 10 Cum
Plastering with CM 1:5 , 12mm thick in all floors including curing etc., Completed Complying with Satndard specification and as directed by the departmental offficers. Rate for 10m2
Roofing with light roofing GAL volume colourcoated sheet including the cost of including conveyance of all material to site and all labour charegs etdc Completed
Supplying and fixing GI Pipe and Rectangular hollow pipe including the cist of Conveyance of all material to site and all labour charegs etc completed
1"X2" Rectangular Hollow Pipe
Provision of Name Board
Providing Bituman pad
Construction of Threshing Floor@ Kanalatty H/o Kanalatty - Rs. 6.440 Lakhs
Earth work Excavation for foundation in all Soil to Fullm depth as may be directed ecept in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Earth work in all soils except hard rock requiring blastering & Conveying for fromation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching, formation of bund, breaking, clods, sectiionng etc,. Completed
Cement Concrete 1:4:8 mix unsing 40mm HBG mental for foundation including watering wherever necessary and laid in layers of lot more than 15cm thick , Compacting etc., Completed Completd Complying with standard specification and as directed
Random Rubble Masonry in CM 1:5 mix using new Roungh Bond Stone Including Curing Etc., Completed Complying with Stanard Specification Threshing Floor Main wall Allround III rd footing
Filling in basement with excavated earth in layer of not more than 15cm thick well rammed, watered and consoildated complying with standared specification etc,. Completed
Supplying & erecting centering for sides&soffiots including necessary supports & Strutting upto 3.29m height for plane surface in all floors with all floor with all cross bracing using mild stee; of size 90X60cm & 10 gauge Stiffened, welded with steel angle
Cement Concrete 1:2:4 mix using 20mm ISS mental including cost and conveyance of all material to site and all labour charegs for mixing, lying,and curing etc Completed for 10Cum
Brick Work in Cement Mortar 1:5 mix using Country Bricks Including Cost and conveyance of all materal to site and all labour charegs etc completed for 10 Cum
Plastering with CM 1:5 , 12mm thick in all floors including curing etc., Completed Complying with Satndard specification and as directed by the departmental offficers. Rate for 10m2
Roofing with light roofing GAL volume colourcoated sheet including the cost of including conveyance of all material to site and all labour charegs etdc Completed
Supplying and fixing GI Pipe and Rectangular hollow pipe including the cist of Conveyance of all material to site and all labour charegs etc completed
1"X2" Rectangular Hollow Pipe
Provision of Name Board
Soak Pit
Providing Bituman pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Chinna Durai
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .