Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.1 L
EMD Value
₹42,200
Closing Date
16 May 2023, 5:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer Melaneelithanallur
The Block Development office Melaneelithanallur
Construction of 60000 litre OHT(12m Staging Height) at Panavadalichathiram village in Vadakku Panavadali Panchayat in Melaneelithanallur Panchayat union. Under JJM 2020-21
2023_RDTN_313996_2
BDOMNR/13/2023-B3
Open Tender
Civil Works
Works
90 days
Panchayat union office, Melaneelithanallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹42,200
The Block Development officer
₹42,200
Yes
16 May 2023
11 May 2023
16 May 2023
11 May 2023
16 May 2023
11 May 2023
Amount
1.Construction of 60000 litre OHT(12m Staging Height) at Panavadalichathiram village in Vadakku Panavadali Panchayat in Melaneelithanallur Panchayat union.
Construction of 60000 litre OHT(12m Staging Height) at Panavadalichathiram village in Vadakku Panavadali Panchayat in Melaneelithanallur Panchayat union.
Main Estimate
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth
First depth of 2m
2 nd Depth
Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES
Below GL
For column footing and GL Brace
GL 0 to 3.30 M
For Brace I
For Brace II
For Brace III
Roof slab
For Floor Beam and Bottm of Floor slab
CURVED SURFACE
For Side Wall, & Floor slab sides and Haunch
For Side Wall, Roof Slab sides
SQUARE COLUMN
For column Below GL
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.30m to 11.31m )
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Providing MS Ladder & Hand rails arrangements in 60,000 Lits. Capacity OHT With 12.00m Staging Height.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers. SFRC
Supply & Delivery of following Pipes and specials for OHT connection
Supply of GI Pipes for OHT Connections 65 mm dia
65mm Ø GI Elbow
65mm Ø GI coupling
65mm Ø GI Flange Set
65mm Ø GM Gate valve
SUB ESTIMATE I (RWHS & PLATFORM)
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B.
For first depth of 2m
For Core wall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the recharge pits including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Providing Extension of Pipe Line & FHTC Arrangement
63 x 20mm saddle set
Brass Ferrule 15mm
Supply and delivery of 20mm dia PVC (RIGID) PIPES (1.8 MM THICK)WITH ISI MARK
20mm PVC Elbow
20mm PVC FTA (LR)
20mm PVC MTA (LR)
Cutting of old Cement Concrete road for laying the 20mm pvc pipe 50 % excluding CC road
Earthwork Excavation for 15mm upvc pipe laying work including cost of Refilling work as per Standard Specifications 20B (in Rm)
Labour Charges for Laying & Jointing 20 mm pipe in Excavated Trench in Proper Camber
Supply & Jointing 20 mm SS/brass tap (Local rate)
10 Lpm Brass Flow Control Vlave (LR)
U PVC ball valve 15mm Including all acharges etc complete
Labour charge for drilling, cutting, Threading and Brass ferrule in distribution pipe.
Supply and delivery of MS Clamp and fixing in wall in open space with required screw etc., (LR)
Cutting 20mm PVC rigid pipes and specials true to axis and finishing the ends complete
FHTC Platform
Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges etc., complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges etc., complete
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officer
Supplying, Fabricatung and placin g in position of RTS or MS rod for all reinforced cement concrete works as per design given including cost of steel and binding wire in all floors etc,complete
Reinforced cement concrete in 1:1.5 :3 mix using 20mm iss HBG stone jelly and M.Sand for all reinforced cement concrete including conveyance charge to site and all labour charges etc., complete
Road cut restoration
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and all cost and conveyance of materials and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MR.K.VIGNESH,CONTRACTOR
stage.html
html • 0.02 MB
finance_372765.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .