Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹6.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.0 Cr+₹12.7 L (1.86%)Rejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.0 Cr+₹12.7 L (1.86%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.1 Cr
EMD Value
₹14.1 L
Closing Date
12 Sept 2024, 2:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SE IST CIRCLE MEERUT
LOT NO 1
2024_UPIDC_947507_5
01/SE-I/2024-25
Open Tender
Civil Works
Item Rate
425 days
MEERUT
AS PER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹2,354
Yes
₹14.1 L
Yes
11 Nov 2024
3 Sept 2024
12 Sept 2024
3 Sept 2024
12 Sept 2024
3 Sept 2024
Amount
Dismantling of brick work including disposal, labour, T&P etc. for completion of work.
Dismentling of CC work including disposal, labour, T&P etc for completion of work
Earth work in foundation in all types of soil i/c all lead & lift i/c. back fillng, watering and ramming of excavated earth into the trenches or into the plinth with removal and disposal of surplus earth.
Laying CC 1:3:6 in bed i/c all cost of material T&P labour, carriage with all lead & lift etc. complete.
First class brick work in 1:4 C.M. i/c all cost of material, labour, T&P etc. (more than 230 mm thick with 15% old bricks)
First class brick work in 1:4 C.M. i/c all cost of material, labour, T&P etc. (more than 230 mm thick)
Laying RCC 1:1:2 (M-25) i/c all cost of material, labour, T&P carriage with all lead & lift etc. for proper completion of work
Steel Reinforcement (TMT) i/c cost of material, labour, carriage with all lead & lift, T&P etc. for proper completion of work
Centering and shuttering in straight portion for CC work with all material, labour, T&P etc. for proper completion of work
Centering and shuttering for RCC work with all material, labour, T&P etc. for proper completion of work
Laying CC 1:2:4 (M-15) i/c. all cost of material, labour, T&P, carriage with all lead & lift etc. for proper completion of work
Supplying & laying G.I. wire crates (Size 3.00x1.50x1.00) i/c. all cost of material, labour, T&P, carriage with all lead & lift etc. for proper completion of work
Providing, Laying & packing stone boulder (20 to 40 kg) in wire crates i/c. tying, all cost of material, labour, T&P, carriage, all lead & lift etc. for proper completion of work
Providing, Laying & dumping stone boulder (20 to 40 kg) i/c. all cost of material, labour, T&P, carriage, all lead & lift etc. for proper completion of work.
Providing & laying RBM in Pitching i/c. all cost of material, labour, T&P, carriage, all lead & lift etc. for proper completion of work.
Providing & laying Dry stone boulder (20 to 40 kg.) in pitching, hand packed i/c. all cost of material, labour, T&P, carriage, all lead & lift etc. for proper completion of work
Earth work in embankment by power transported earth with all lead & lift i/c. excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty.
Filling empty cement bags with transported earth, hand sewing with suja & sutli, placing in position including cost of cartage of earth, labour, T&P etc
Dewatering by diesel pump i/c. cost of material, labour, T&P, fuel and operating staff for proper completion of work in all respect.
12 mm thick cement plaster in 1:4 C.M. i/c. all cost of material, labour, T&P etc. for proper completion of work.
Dismentling existing plaster i/c. disposal of refuse as per direction of Engineer in charge
Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem, Guttucem, Supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brusing the surface to remove all dirt and remains of loose powdered materials i/c. curing and cost of all materials.
Uprooting Jhunds
BHAMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .